ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Rebuild Date: August 29, 2013Permit type: Demolition or move p | Permit status: Finaled | Completion date: September 30, 2013 | Current use: Single family dwelling | Permit id: 638435 | |||||
Electrical permit Date: January 17, 2014Permit status: Finaled | Completion date: December 15, 2014 | Current use: Single family dwelling | Permit id: 660832 | |||||
Residential - demo/rebuild - heating/cooling equipment and ductwork Date: December 10, 2013Permit type: Mechanical permit | Permit status: Finaled | Completion date: December 15, 2014 | Current use: Single family dwelling | Permit id: 657156 | |||||
Repair house foundation Date: May 25, 2007 Value: $1,600Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 454663 | |||||
1 amp temp. Pole service for construction. Date: April 23, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 632535 | |||||
Demo/rebuild Date: September 12, 2013 Value: $250,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 638432 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Abandongas service in accordance with washington gas plan no. 173708. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county < Date: May 10, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 292942 | |||||
Dw permit: construct mcdot standard: mc-301. 05 type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. Complete repair (restoration of right-of-way) shall be made of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: July 1, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 296484 | |||||
Install gas service in accordance with washington gas plan no. 282194. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: April 8, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 311092 |