Additional dryrot repair by b. Inspector order or adivse as follow. South east corner section of 30"x160" dryrot frame and stucco of 20"x20" sheathing boards and stucco revision to pa#200806104049 . South wall section by kitchen sink only stucco patch. Value: $8,500Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 23, 2008 | Expiration date: December 23, 2008 | Current use: 1 family dwelling | Permit id: 200806235088 | |||||
Front steps main floor landing: remove (e) flagstones to repair (e) dryrot frame members under it. Setting back new flagstone on new waterproof wood deck. Basement: replace a section of 16-0" dryrot mudsill bolted on (e) foundation with 5/8" 10" expansion bolts. Back exit door landing & stucco Value: $18,650Permit type: Otc alterations permit | Permit status: Complete | Completion date: June 10, 2008 | Expiration date: December 10, 2008 | Current use: 1 family dwelling | Permit id: 200806104049 | |||||
Front steps main floor landing: remove (e) flagstones to repair (e) dryrot frame members under it. Setting back new flagstone on new waterproof wood deck. Basement: replace a section of 16-0" dryrot mudsill bolted on (e) foundation with 5 8" 10" expansion bolts. Back exit door landing & stucco Date: June 10, 2008 Value: $18,650Permit type: Otc alterations permit | Permit status: Complete | Expiration date: June 10, 2008 | Current use: 1 family dwelling | Permit id: 200806104049 | |||||
Workcategory:1p;installnewmainwaterservice Date: June 1, 2016Permit status: Complete | Expiration date: June 1, 2016 | Permit id: Pw20160601906 |