ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 99 Front steps main floor landing: remove (e) flagstones to repair (e) dryrot frame members under it. Setting back new flagstone on new waterproof wood deck. Basement: replace a section of 16-0 dryrot mudsill bolted on (e) foundation with 5 8 10 expansion bolts. Back exit door landing & stucco Current use: 1 family dwelli | Permit id: #200806104049 | |||||
SCORE 99 Additional dryrot repair by b. Inspector order or adivse as follow. South east corner section of 30 x160 dryrot frame and stucco of 20 x20 sheathing boards and stucco revision to pa#200806104049 . South wall section by kitchen sink only stucco patch. Current use: 1 family dwelli | Permit id: #200806235088 | |||||
SCORE 100 Work category: 1p; install new main water service Date: June 1, 2016 Contractor: Leo Gotelli Plumbing IncPermit type: Plumbing permit | Permit status: Complete | Permit id: Pw20160601906 | |||||
Front steps main floor landing: remove (e) flagstones to repair (e) dryrot frame members under it. Setting back new flagstone on new waterproof wood deck. Basement: replace a section of 16-0" dryrot mudsill bolted on (e) foundation with 5 8" 10" expansion bolts. Back exit door landing & stucco Date: June 10, 2008 Value: $18,650Permit type: Otc alterations permit | Completion date: July 24, 2008 | Expiration date: June 10, 2008 | Current use: 1 family dwelling | Permit id: 200806104049 | |||||
Additional dryrot repair by b. Inspector order or adivse as follow. South east corner section of 30"x160" dryrot frame and stucco of 20"x20" sheathing boards and stucco, revision to pa#200806104049 . South wall section by kitchen sink only stucco patch. Date: June 23, 2008 Value: $8,500Permit type: Otc alterations permit | Completion date: July 24, 2008 | Expiration date: June 23, 2008 | Current use: 1 family dwelling | Permit id: 200806235088 | |||||
Work category: 1p; install new main water service Date: June 1, 2016Permit status: Complete | Completion date: June 3, 2016 | Expiration date: June 1, 2016 | Permit id: Pw20160601906 |