ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Soil boring: drill 5 soil boring within the county right of way. Pre-construction meeting required contact mc dps inspector richard boylan @ 301-674-70 work shall comply with the current montgomery county specifications for utility construction permit. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: March 20, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 272899 | |||||
Test pit: excavate 2 test pits within the county right of way. Pre-construction meeting required contact mc dps inspector richard boylan @ 301-674-70 work shall comply with the current montgomery county specifications for utility construction permit. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: March 20, 2012Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 272897 |