104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1/3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: April 4, 2016Permit type: Application | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-224533-000 | |||||
Dfs - pt cables for 2nd floor Date: March 8, 2016Permit type: Application | Permit status: Approved | Completion date: January 15, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Application | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Issuance/intake | Permit status: Intake | Completion date: April 12, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Planning and zoning | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2015-224533-Dfs | |||||
Fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1/3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: December 30, 2015Permit type: Application | Permit status: Approved | Completion date: December 22, 2015 | Permit id: 2015-224533-Fnd | |||||
Revision to add removal of trees as part of work under fnd-01 fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1/3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: January 20, 2016Permit type: Application | Permit status: Approved | Completion date: January 12, 2016 | Permit id: 2015-224533-Rev | |||||
Revision #2 to 15-224533-fnd-01-co to include post tensioned deck for 2nd floor. This is limited to structural modifications only. Fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1/3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: March 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2015-224533-Rev | |||||
Plumbing scope for new 275 unit four story student housing building Date: January 15, 2016Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105512-000 | |||||
New dormitory building, 4 stories. Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107239-000 | |||||
New dormitory building, 4 stories. Permit type: Process management | Permit status: Closed | Completion date: April 20, 2016 | Permit id: 2016-107239-000 | |||||
New dormitory building, 4 stories. Permit type: Process management | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-107239-000 | |||||
San conn: 234 lf of 15 csp combo main, approx d=13, in n portsmouth ave. Contractor shall install 8 tap into 15 main and build new branch to property per std p-262. Contractor to verify all depths and locations in field. Contact x37869 Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116621-000 | |||||
Site storm, sanitary , water piping, sediment manholes and drywells Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116637-000 | |||||
Underground - install underground piping - 226lf of 6 pipe, with 1 fdc, 1 double det check valve assembly. Pwb to install wet tap Date: March 16, 2016Permit type: Intake | Permit status: Approved | Completion date: February 17, 2016 | Permit id: 2016-121545-000 | |||||
Sprinklers-install new wet sprinkler system with combination standpipes. Permit type: Intake | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136305-000 | |||||
Sprinklers-install new wet sprinkler system with combination standpipes. Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136305-000 | |||||
Alarm-install fire alarm system in new residence hall. Permit type: Intake | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-146448-000 | |||||
Alarm-install fire alarm system in new residence hall. Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146448-000 | |||||
104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1 3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: April 4, 2016Permit type: Application | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-224533-000 | |||||
Dfs - precast architectural concrete Permit type: Application | Permit status: Approved | Completion date: April 12, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Issuance/intake | Permit status: Intake | Completion date: April 12, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Process management | Permit status: Closed | Completion date: April 13, 2016 | Permit id: 2015-224533-Dfs | |||||
Dfs - precast architectural concrete Permit type: Planning and zoning | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2015-224533-Dfs | |||||
Fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1 3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: December 30, 2015Permit type: Application | Permit status: Approved | Completion date: December 22, 2015 | Permit id: 2015-224533-Fnd | |||||
Revision to add removal of trees as part of work under fnd-01 fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1 3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: January 20, 2016Permit type: Application | Permit status: Approved | Completion date: January 12, 2016 | Permit id: 2015-224533-Rev | |||||
Revision #2 to 15-224533-fnd-01-co to include post tensioned deck for 2nd floor. This is limited to structural modifications only. Fnd 1 : includes basement excavation, slab on grade to bottom of 2nd flr, small basement, slab insulation, underslab plumbing and radon system 104,0 square foot dormitory, type is iib construction. Four stories above grade(top story in attic) with a basement level beneath 1 3 of the building. Upper 3 stories are light gage steel bearing wall on a post tensioned concrete platform. (147 dorm rooms) Date: March 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2015-224533-Rev | |||||
New dormitory building, 4 stories. Permit type: Intake | Permit status: Closed | Completion date: January 19, 2016 | Permit id: 2016-107239-000 | |||||
New dormitory building, 4 stories. Permit type: Process management | Permit status: Closed | Completion date: April 20, 2016 | Permit id: 2016-107239-000 | |||||
New dormitory building, 4 stories. Permit type: Process management | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2016-107239-000 | |||||
Sprinklers-install new wet sprinkler system with combination standpipes. Permit type: Intake | Permit status: Approved | Completion date: March 17, 2016 | Permit id: 2016-136305-000 | |||||
Sprinklers-install new wet sprinkler system with combination standpipes. Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136305-000 | |||||
Alarm-install fire alarm system in new residence hall. Permit type: Intake | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-146448-000 | |||||
Alarm-install fire alarm system in new residence hall. Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146448-000 |