| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Reviews Date: February 6, 2015Permit status: Closed | Completion date: February 6, 2015 | Permit id: 2015-116089-000 | |||||
F1/ suite 300; remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, Date: February 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2015-116214-000 | |||||
F1/ suite 300; varonis, remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 6, 2015 | Permit id: 2015-116228-000 | |||||
B2/ revision to egress lighting Date: April 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-116228-Rev | |||||
Plumbing renovation at hamilton building suite 3 for avronis tirelocate sink and urinal, demo wc Date: February 26, 2015Permit type: Intake | Permit status: Closed | Completion date: February 9, 2015 | Permit id: 2015-116943-000 | |||||
Suite 300/add (3) sprinklers to accommodate remodel Date: February 18, 2015Permit type: Intake | Permit status: Closed | Completion date: February 17, 2015 | Permit id: 2015-120236-000 | |||||
Power - suite 300; remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, lighting Date: March 2, 2015Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-120747-000 | |||||
Historic resource review approval of a new, non-illuminated blade sign on the hamilton building in the downtown subdistrict of the central city plan district. The sign is 9. 33 square feet in face area and measures 32 inches tall, 42 inches long, and 2 inches thick, made from an aluminum base painted in black matte paint, with -inch-thick white, matte pvc lettering, per the approved plans, exhibits c. 1 through c. 4, signed and dated may 15, 2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition b must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-129514 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. All mounting screws and/or bolts will be installed through ex Date: May 18, 2015Permit type: Land use review | Permit status: Completed | Completion date: March 10, 2015 | Permit id: 2015-129514-000 | |||||
Voice data, power - suite 300; varonis, remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, Date: March 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131095-000 | |||||
Suite #300- alteration to the fire alarm as needed for t. I.- 8 devices total 4- strobes4- h/s Date: March 10, 2015Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2015-131483-000 | |||||
F15/ wildwood bespoke - create production and customer consultation rooms Date: March 30, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 30, 2015 | Permit id: 2015-141826-000 | |||||
B2/ add new fan coil unit Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142250-000 | |||||
B2/ suite 300, replace two indoor split system units Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142253-000 | |||||
Power - wildwood bespoke - create production and customer consultation rooms Date: May 29, 2015Permit type: Intake | Permit status: Closed | Completion date: March 31, 2015 | Permit id: 2015-142538-000 | |||||
Controls - wildwood bespoke - create production and customer consultation rooms Date: March 31, 2015Permit type: Intake | Permit status: Closed | Completion date: March 31, 2015 | Permit id: 2015-142544-000 | |||||
Plumbing renovation at hamilton building suite 1 for wildwood bespokereplace counter top sink with wall hung sink Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: April 2, 2015 | Permit id: 2015-143873-000 | |||||
Hvac stat - suite 300; varonis, remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, Date: April 6, 2015Permit type: Intake | Permit status: Closed | Completion date: April 6, 2015 | Permit id: 2015-145138-000 | |||||
B1/ suite 1 - malka diamonds & jewelry - remove toilet room and install two sinks Date: May 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2015-167932-000 | |||||
Plumbing renovation at hamilton building for malka ti2 sinks Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: May 19, 2015 | Permit id: 2015-172690-000 | |||||
Pwr - suite 1 - malka diamonds & jewelry - remove toilet room and install two sinks - pwr Date: May 20, 2015Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173553-000 | |||||
New non illuminated projecting sign on the south elevation Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192117-000 | |||||
New non illuminated projecting sign on the south elevation Permit type: Trade permits | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-192117-000 | |||||
New non illuminated projecting sign on the south elevation Permit type: Planning and zoning | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-192117-000 | |||||
New non illuminated projecting sign on the south elevation Permit type: Structural | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-192117-000 | |||||
New non illuminated projecting sign on the south elevation Permit type: Issuance | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2015-192117-000 | |||||
F8/ 6th floor; renovate/reconfigure two restrooms to ada requirements, office ceiling, elec, plbg Date: March 29, 2013Permit type: Intake | Permit status: Closed | Completion date: March 22, 2013 | Permit id: 2013-131378-000 | |||||
F8/ 6th floor; structural repairs to 6th floor framing, Date: April 9, 2013Permit type: Intake | Permit status: Closed | Completion date: April 4, 2013 | Permit id: 2013-131378-Rev | |||||
B2/ revision to clarify structural detail/adequacy of hanging, folding panel partition wall system between conference rooms 1 & 2 Date: October 1, 2013Permit type: Intake | Permit status: Closed | Completion date: September 26, 2013 | Permit id: 2013-204907-Rev | |||||
F3/ suite 400; rev-01 4th floor joist repair of existing conditions uncovered during demo work Date: November 13, 2013Permit type: Intake | Permit status: Closed | Completion date: October 31, 2013 | Permit id: 2013-216425-Rev | |||||
Construction - hoisting material on & off roof Date: July 22, 2014Permit type: Intake | Permit status: Complete | Completion date: June 26, 2014 | Permit id: 2014-175357-000 | |||||
F15/ 2nd floor quick left existing tenant - add new walls for 3 new offices and a conference room Date: July 14, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 14, 2014 | Permit id: 2014-183647-000 | |||||
F15/ 2nd floor quick left - existing tenant - add new walls for 3 new offices and a conference room. Date: July 25, 2014Permit type: Intake | Permit status: Closed | Completion date: July 14, 2014 | Permit id: 2014-183648-000 | |||||
Power - 2nd floor quick left - existing tenant - add new walls for 3 new offices and a conference room. Date: July 30, 2014Permit type: Intake | Permit status: Closed | Completion date: July 30, 2014 | Permit id: 2014-191025-000 | |||||
F12/ suite 3 landlord work for future tenant, remove some walls and ada barrier removal Date: August 1, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 1, 2014 | Permit id: 2014-192728-000 | |||||
Remove 48 in cubicle walls, repair carpet, remove approx 12 ft of wall to drop ceiling height in preparation of new cubicles Permit type: Application | Permit status: Approved | Completion date: March 27, 2007 | Permit id: 2007-118158-000 | |||||
Remove 48 in cubicle walls, repair carpet, remove approx 12 ft of wall to drop ceiling height in preparation of new cubicles Permit type: Planning and zoning | Permit status: Not reqd | Completion date: March 27, 2007 | Permit id: 2007-118158-000 | |||||
Power - move overhead door to new location/create two new offices and new storage room/suite 600 Date: July 28, 2015Permit type: Intake | Permit status: Closed | Completion date: July 28, 2015 | Permit id: 2015-208584-000 | |||||
Suite #600- relocate (1), delete (1) sprinkler for t. I. Date: July 31, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209074-000 | |||||
Provide fire alarm and electrical work required for upgrade of the elevator in the building Date: September 28, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2015-242879-000 | |||||
Installation of comcast coaxfaxed Date: December 2, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: July 28, 2015 | Permit id: 2013-233249-000 | |||||
Plumbing renovation at hamilton building suite 1 for wildwood bespokereplace counter top sink Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: April 2, 2015 | Permit id: 2015-143873-000 | |||||
New non illuminated projecting sign on the south elevation Date: July 13, 2015Permit type: Intake | Permit status: Closed | Completion date: June 25, 2015 | Permit id: 2015-192117-000 | |||||
F27/move overhead door to new location,/create two new offices and new storage room/suite 600 Date: July 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 8, 2015 | Permit id: 2015-198490-000 | |||||
F27/move overhead door to new location/create two new offices and new storage room/suite 600 Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198515-000 | |||||
Remove 48 in cubicle walls, repair carpet, remove approx 12 ft of wall to drop ceiling height in preparation of new cubicles Permit type: Application | Permit status: Approved | Completion date: March 27, 2007 | Permit id: 2007-118158-000 | |||||
Remove 48 in cubicle walls, repair carpet, remove approx 12 ft of wall to drop ceiling height in preparation of new cubicles Permit type: Planning and zoning | Permit status: Not reqd | Completion date: March 27, 2007 | Permit id: 2007-118158-000 | |||||
Power - move overhead door to new location create two new offices and new storage room suite 600 Date: July 28, 2015Permit type: Intake | Permit status: Closed | Completion date: July 28, 2015 | Permit id: 2015-208584-000 | |||||
F8 6th floor; renovate reconfigure two restrooms to ada requirements, office ceiling, elec, plbg Date: March 29, 2013Permit type: Intake | Permit status: Closed | Completion date: March 22, 2013 | Permit id: 2013-131378-000 | |||||
F8 6th floor; structural repairs to 6th floor framing, Date: April 9, 2013Permit type: Intake | Permit status: Closed | Completion date: April 4, 2013 | Permit id: 2013-131378-Rev | |||||
B2 revision to clarify structural detail adequacy of hanging, folding panel partition wall system between conference rooms 1 & 2 Date: October 1, 2013Permit type: Intake | Permit status: Closed | Completion date: September 26, 2013 | Permit id: 2013-204907-Rev | |||||
F3 suite 400; rev-01 4th floor joist repair of existing conditions uncovered during demo work Date: November 13, 2013Permit type: Intake | Permit status: Closed | Completion date: October 31, 2013 | Permit id: 2013-216425-Rev | |||||
F1 suite 300; varonis, remove walls, reconfigure for offices, doors, relites, remodel restrooms, ceiling, elec, plbg, Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 6, 2015 | Permit id: 2015-116228-000 | |||||
Historic resource review approval of a new, non-illuminated blade sign on the hamilton building in the downtown subdistrict of the central city plan district. The sign is 9. 33 square feet in face area and measures 32 inches tall, 42 inches long, and 2 inches thick, made from an aluminum base painted in black matte paint, with -inch-thick white, matte pvc lettering, per the approved plans, exhibits c. 1 through c. 4, signed and dated may 15, 2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition b must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-129514 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. All mounting screws and or bolts will be installed through ex Date: May 18, 2015Permit type: Land use review | Permit status: Completed | Completion date: March 10, 2015 | Permit id: 2015-129514-000 | |||||
F15 wildwood bespoke - create production and customer consultation rooms Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-141829-000 | |||||
B2 add new fan coil unit Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142250-000 | |||||
B2 suite 300, replace two indoor split system units Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2015-142253-000 | |||||
B1 suite 1 - malka diamonds & jewelry - remove toilet room and install two sinks Date: May 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 11, 2015 | Permit id: 2015-167932-000 | |||||
F27 move overhead door to new location, create two new offices and new storage room suite 600 Date: July 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 8, 2015 | Permit id: 2015-198490-000 | |||||
F27 move overhead door to new location create two new offices and new storage room suite 600 Date: July 16, 2015Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198515-000 | |||||
Ti fourth floor for new tenant Date: February 2, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 19, 2006 | Current use: Business | Permit id: 2006-106100-000 | |||||
Ti, new wall Date: October 5, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 8, 2013 | Current use: Business | Permit id: 2006-167664-000 | |||||
Interior stair addition between third and fourth floors. Add 2 hour door at stair connecting 4th and 5th levels. Date: February 7, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 18, 2007 | Current use: Business | Permit id: 2007-105485-000 | |||||
3rd floor - add walls to create addition storage area, and office space, relocate the entrances for the mens and womens restroom; 4th floor - add partition wall for decoration Date: July 3, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 18, 2007 | Current use: Business | Permit id: 2007-143241-000 |