ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Patrikis residence Date: May 18, 2015Permit type: Electrical permit | Permit status: Finaled | Completion date: June 5, 2015 | Current use: Single family dwelling | Permit id: 712687 | |||||
Mechanical permit Date: March 21, 2014Permit status: Issued | Current use: Single family dwelling | Permit id: 666793 | |||||
Install 38 solar panels on roof of sfd Date: May 18, 2015 Value: $20,254Permit type: Building residential | Permit status: Finaled | Completion date: June 5, 2015 | Current use: Single family dwelling | Permit id: 712213 | |||||
Patrikisresidence Date: May 18, 2015Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 712687 | |||||
Deck Date: June 14, 2011 Value: $7,500Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 571209 | |||||
Macadam cut---abandon 3/4" w/s stub 18 sn bw of 5212 & 12 ew curb of drake terrace,gas service in accordance with washington gas plan no. 643476. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 1, 2016Permit type: Public right of way | Permit status: Issued | Current use: Construction | Permit id: 351396 |