ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: April 28, 2006Permit id: 06-04-181 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-075 | Parcel: 010491024000 | |||||
Date: August 29, 2006Permit id: 06-08-194 | Parcel: 010491024000 | |||||
Date: September 1, 2006Permit id: 06-09-006 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-076 | Parcel: 010491024000 | |||||
Date: September 15, 2006Permit id: 06-09-175 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-073 | Parcel: 010491024000 | |||||
Date: October 13, 2006Permit id: 06-10-114 | Parcel: 010491024000 | |||||
Date: October 18, 2006Permit id: 06-10-150 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-074 | Parcel: 010491024000 | |||||
Date: October 20, 2006Permit id: 06-10-163 | Parcel: 010491024000 | |||||
Date: October 26, 2006Permit id: 06-10-200 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-080 | Parcel: 010491024000 | |||||
Date: October 31, 2006Permit id: 06-10-217 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-078 | Parcel: 010491024000 | |||||
Date: October 31, 2006Permit id: 06-10-218 | Parcel: 010491024000 | |||||
Date: December 1, 2006Permit id: 06-12-006 | Parcel: 010491024000 | |||||
Date: February 19, 2010Permit id: 10-02-071 | Parcel: 010491024000 | |||||
Date: November 1, 2002Permit id: 95-1024 | |||||
Redevel. Proj.--install s w, 3 ssco, 2 dwys, chng loc. Of swr & size loc. Of wtr Date: November 1, 2002Permit id: 95-3053 | |||||
Install two driveways per standard detail #206. Inspector to verify sewer clean out at the right-of-way. If one does not exist, one shall be installed per standard detail # 401. This work shall be complete prior to finalization of building permits 10-02-081, 10-02-079, and 10-02-077a pre-construction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewa Date: January 27, 2010Permit id: 10-0067 | Parcel: 010491024000 | |||||
Remove and replace 85lf of orangeburg sewer pipe in parking lot with new sewer piping per city standard specifications and details. Date: February 22, 2010Permit id: 10-0085 | Parcel: 010491024000 | |||||
Renovation rehab of interior & exterior-with structural foundation work-sfd phase ib (united christian center transitional housing) Date: February 22, 2010Permit id: 10-0088 | Parcel: 010491024000 | |||||
Renovation rehba of interior & exterior of northeast duplex phase 1 (units 22 23) (united christian center transitional housing) Date: February 22, 2010Permit id: 10-0087 | Parcel: 010491024000 | |||||
W. O. 99022 p. M. 30847326 excavate a 4x4 bell-hole for new residential gas service. All work within the right-of-way shall be constructed per state and federal accessibility standards. A preconstruction meeting is required call (916) 617-4692. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: April 20, 2011Permit id: 11-0079 | Parcel: 010491024000 |