ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Installation of a flush mount grid-tied 4. 9 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: November 27, 2013 Contractor: Solarcity CorporationClient: Dale Kamibayashi,Lisa Kamibayashi | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 10, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount grid-tied 4. 9 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Dale Kamibayashi | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 10, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-06754 |