| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Intersection type driveway: remove existing driveway. Construct two intersection type driveways with some regrading of slope in existing swale as described on the attached approved plan. Driveways will consist of montgomery county standard mc-100. 01 curb and gutter. Work shall be completed as directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Construction crews shall not drive/park vehicles over curbs, sidewalks or grassy areas. Pre-construction meeting requiredcontact mcdps row inspector richard long at 301-370-3709. Date: October 27, 2008Permit type: Public right of way | Permit status: Finaled | Current use: Driveway | Permit id: 258082 |