ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Mechanical permit Date: September 28, 2007Permit status: Issued | Current use: Single family dwelling | Permit id: 467017 | |||||
Tie yard drain into county stormdrain -a- inlet install a roof/sump pump drain within the county right of way with the following conditions: curb face will be saw cut to accept a maximum 4 diameter pvc drainage pipe. Concrete epoxy non? Shrink grout will be used to patch the cut curb face and above the drainpipe. Roof/sump pump drain will be connected into the county storm drain structure or pipe if directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Date: October 19, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Miscellaneous structure | Permit id: 282454 |