ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: May 10, 2005Permit status: Finaled | Completion date: May 27, 2005 | Current use: Single family dwelling | Permit id: 382855 | |||||
Anastasi residence pv system - ap #6845 6. 63 kw system, 26 modules, 60 w inverter, 35 amp breaker in 2 amp mcb panel. Date: August 25, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: September 4, 2014 | Current use: Single family dwelling | Permit id: 685400 | |||||
Building residential Date: May 21, 2004 Value: $8,643Permit status: Issued | Current use: Single family dwelling | Permit id: 345493 | |||||
Install (26) solar panels to roof of exisiting sfd Date: August 25, 2014 Value: $13,591Permit type: Building residential | Permit status: Stop work | Completion date: September 4, 2014 | Current use: Single family dwelling | Permit id: 684580 | |||||
Porch Date: May 18, 2004 Value: $13,350Permit type: Building residential | Permit status: Finaled | Completion date: July 27, 2004 | Current use: Single family dwelling | Permit id: 344835 | |||||
Revision to permit #345493(patio room) Date: March 25, 2005 Value: $10,000Permit type: Building residential | Permit status: Finaled | Completion date: May 27, 2005 | Current use: Single family dwelling | Permit id: 377718 | |||||
Anastasiresidence pv system - ap #6845 6. 63 kw system,26 modules, 60 w inverter, 35amp breaker in 2 amp mcb panel. Date: August 25, 2014Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 685400 | |||||
Replacegas service in accordance with washington gas plan no. 631038. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 16, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350607 |