ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Date: April 18, 2016 Contractor: Grant Mackay Company IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-03635 | |||||
SCORE 100 Removal of existing sign 6th floor. Flat sign 8. 3 sqft flat sign 11. 34 sqft monument sign 18 sqft monument sign is face replacement only. A. H. Date: July 29, 2010 Contractor: Impact Signs IncPermit type: Sign | Permit status: Closed | Permit id: Bld2010-05132 | |||||
SCORE 100 Interior remodel of office and common space. Zone - ro zone, interior work. Date: July 9, 2012 Contractor: Hennessy Construction, IncPermit status: Closed | Current use: Commercial | Permit id: Bld2012-04929 | |||||
SCORE 75 Electrical Date: July 31, 2012 Contractor: Vm Electric, LlcPermit status: Closed | Current use: Commercial | Permit id: Bld2012-05569 | |||||
SCORE 86 Relocate two lavs, drinking fountain and mop sink reinstall existing toilet fixtures Date: August 7, 2012 Contractor: All Around Mechanical IncPermit type: Plumbing | Permit status: Closed | Current use: Commercial | Permit id: Bld2012-05782 | |||||
SCORE 89 Replacing (3) boilers in place of existing boiler Date: October 10, 2012 Contractor: Cci Mechanical, IncPermit type: Mechanical | Permit status: Closed | Current use: Commercial | Permit id: Bld2012-07522 | |||||
SCORE 100 Date: April 18, 2016 Contractor: Grant Mackay Company IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-03635 | |||||
SCORE 100 45,0 remodel of site, windows, building systems, and interiors. Renovation of an existing building, parking structure and grounds, including remodeling design of the building, work spaces and grounds for the new owners needs. Remodeling design of exterior windows, built-out spaces, interiors and ff&e proposal based on 1 work spaces and building common spaces. The work will be accomplished by the removal of all existing interior finishes throughout the entire building to the structural components of the building. Additional interior floor space will be realized by enclosing the current drive-thru of the bank, and the other-cantilevered floor areas that currently exist on the building. The 1st floor atrium will be eliminated and the 2nd floor will be extended over the existing atrium space to create additional floor space. The building will receive new mechanical and electrical systems to better suit the needs of alsco. A seismic upgrade of the building with the addition of a structural Date: August 22, 2016 Contractor: Bigd Construction CorpPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-02580 | |||||
SCORE 100 Electrical Date: September 27, 2016 Contractor: Power House ElectricalPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-08997 | |||||
SCORE 100 Low voltage Date: September 28, 2016 Contractor: Aaa Fire Safety And Alarm, IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-07991 | |||||
SCORE 85 All new piping and fixtures Date: September 28, 2016 Contractor: Budd Rich Plumbing, IncPermit type: Plumbing | Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-09069 | |||||
SCORE 85 New ahu, cooling tower, chiller, and ductwork for 5 floors of office. Date: September 28, 2016 Contractor: Budd Rich Plumbing, IncPermit type: Mechanical | Permit status: Inspections | Current use: Commercial | Permit id: Bld2016-09070 | |||||
SCORE 100 Fire Date: December 20, 2016 Contractor: Fire Services, IncPermit status: Inspections | Current use: Commercial | Permit id: Bld2016-11558 | |||||
SCORE 100 Date: July 9, 2012 Contractor: NaPermit id: Bld2012-04929 | |||||
SCORE 100 Date: October 10, 2012 Contractor: NaPermit id: Bld2012-07522 | |||||
SCORE 100 Date: August 22, 2016 Contractor: NaPermit id: Bld2016-02580 | |||||
SCORE 100 Date: April 22, 2016 Contractor: NaPermit id: Bld2016-03635 | |||||
SCORE 100 Date: September 28, 2016 Contractor: NaPermit id: Bld2016-07991 | |||||
SCORE 100 Date: September 27, 2016 Contractor: NaPermit id: Bld2016-08997 | |||||
SCORE 100 Date: September 29, 2016 Contractor: NaPermit id: Bld2016-09069 | |||||
SCORE 100 Date: October 6, 2016 Contractor: NaPermit id: Bld2016-09070 | |||||
SCORE 100 Date: December 29, 2016 Contractor: NaPermit id: Bld2016-11558 | |||||
SCORE 100 Fire Date: February 23, 2017 Contractor: A R M Construction LlcPermit status: Closed | Current use: Commercial | Permit id: Bld2017-01396 | |||||
Low voltage Date: September 28, 2016Permit status: Closed | Current use: Commercial | Permit id: Bld2016-07991 |