ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
"remodel (1) complete master bathroom w/toilet standing shower vanity sink. Install new 2"" pvc drain and vent stack. Main drain 3"" to be reused as per code." Date: January 31, 2014 Value: $2,500Permit id: Com2014-01952 | |||||
Install (1) 92% afve 60k btu gas furnace w/ 2. 5 ton a/c system. Design and fabricate custom duct system to support 2. 5 ton refrigeration system and counter flow forced air heating as per code. Gas by others Date: January 17, 2014 Value: $2,000Permit id: Com2014-01039 | |||||
Interior work: 1 sq. Ft.; replace water damaged sheetrock underlayment and vinyl floor; tile in 1st floor bathroom; add (sister) 4 basement floor joists (match as existing) for added support; replace sub-floor and vinyl floor tile in the kitchen; all Date: February 2, 2012 Value: $800Permit id: Com2012-02164 | |||||
Interior work 4 sqft: iinstall 4 pvc perforated drain tile 102 lin. Ft. Remove old drain tile new system into existing sump pump. Reconcrete over new drain tile system run discharge pipe outside broom sweep & issue lifetime gaurantee no curbing or u Date: February 1, 2012 Value: $5,300Permit id: Com2012-02012 | |||||
Interior work 4 sqft: iinstall 4 pvc perforated drain tile 102 lin. Ft. Remove old drain tile new system into existing sump pump. Reconcrete over new drain tile system run discharge pipe outside broom sweep & issue lifetime gaurantee no curbing or underpinning Date: February 1, 2012 Value: $5,300Expiration date: August 1, 2012 | Permit id: Com2012-02012 | |||||
Interior work: 1 sq. Ft.; replace water damaged sheetrock underlayment and vinyl floor; tile in 1st floor bathroom; add (sister) 4 basement floor joists (match as existing) for added support; replace sub-floor and vinyl floor tile in the kitchen; all work will be done as per code. Date: February 2, 2012 Value: $800Expiration date: August 2, 2012 | Permit id: Com2012-02164 | |||||
Remodel (1) complete master bathroom w/toilet standing shower vanity sink. Install new 2" pvc drain and vent stack. Main drain 3" to be reused as per code. Date: January 31, 2014 Value: $2,500Expiration date: July 31, 2014 | Permit id: Com2014-01952 | |||||
Install (1) 92% afve 60k btu gas furnace w 2. 5 ton a c system. Design and fabricate custom duct system to support 2. 5 ton refrigeration system and counter flow forced air heating as per code. Gas by others Date: January 17, 2014 Value: $2,000Expiration date: July 17, 2014 | Permit id: Com2014-01039 | |||||
Remodel (1) complete master bathroom w toilet standing shower vanity sink. Install new 2" pvc drain and vent stack. Main drain 3" to be reused as per code. Date: January 31, 2014 Value: $2,500Expiration date: July 31, 2014 | Permit id: Com2014-01952 |