ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
R&r pull box Permit id: 222677 | |||||
R&r s w, pothole to recover conduit Permit id: 258032 | |||||
Clv valley view corridor imp Permit id: 233036 | |||||
Pull coax thru existing conduit Permit id: 294053 | |||||
Fiber splice Permit id: 241037 | |||||
Emerg. Power Permit id: 236448 | |||||
U g wire pull Permit id: 229950 | |||||
Replace electrical box and concrete Permit id: 195777 | |||||
R & r sidealk upgrade bore trench Permit id: 240847 | |||||
Raise manholes Permit id: 191228 | |||||
Install isolation reduction valve Permit id: 194969 | |||||
Storm drain potholing Permit id: 224091 | |||||
Ar ug can maint. Permit id: 225144 | |||||
Pull cable Permit id: 221844 | |||||
Ar can maintenance can 3065 Permit id: 234063 | |||||
Gas installation -- Permit id: 288510 | |||||
R&r wire-u g Permit id: 198113 | |||||
Underground electical install -- Permit id: 283773 | |||||
Pole repair Permit id: 233223 | |||||
Paving Permit id: 201902 | |||||
A c patch Permit id: 200943 | |||||
Cb repair o h maintenance Permit id: 268398 | |||||
O h maintenance Permit id: 214647 | |||||
A c patch Permit id: 192023 | |||||
Trench install conduit place vault -- Permit id: 299360 | |||||
Walking inspection Permit id: 208528 | |||||
Frame pole r&r fiber r&r conduit Permit id: 270091 | |||||
Film production Permit id: 189100 | |||||
O h reapirs on poles -- Date: October 10, 2015Permit id: 295147 | |||||
R & r concrete m43914 Permit id: 224006 | |||||
R & r sidewalk recover empty conduit upgrade vault Permit id: 254919 | |||||
Ar ug can maint. Permit id: 225311 | |||||
Fiber splicing Permit id: 244870 | |||||
Ug can maint. Permit id: 225140 | |||||
Fiber splicing enclosure 0843 Permit id: 224003 | |||||
Cable trench Permit id: 229543 | |||||
Fiber splicing Permit id: 240850 | |||||
Repair grade 3 gas leak Permit id: 197717 | |||||
Trench install conduit upgrade vault r&r sidewalk Permit id: 281160 | |||||
Gas work replacement Permit id: 288671 | |||||
O h repairs Permit id: 274638 | |||||
Coax pull -- Permit id: 293670 | |||||
Remove and replace sidewalk and asphalt trench repair -- Permit id: 283787 | |||||
Gas abandonment -- Permit id: 303814 | |||||
R&r manhole and concrete Permit id: 248120 | |||||
Gas leak repair Permit id: 196806 | |||||
Replace electrical box Permit id: 282937 | |||||
Trenching conduit Permit id: 221176 | |||||
Gas service install Permit id: 290712 | |||||
Emergency retrench power Permit id: 254916 | |||||
Fiber splice Permit id: 252323 | |||||
Can maint. Permit id: 224780 | |||||
Fiber splice cir 98323 Permit id: 254566 | |||||
Retrench power r&r sidewalk Date: July 23, 2014Permit id: 262249 | |||||
R & r fiber Permit id: 263613 | |||||
O h maintenance Permit id: 259296 | |||||
Cable injection Permit id: 270621 | |||||
Paving Permit id: 191754 | |||||
Emergency cable repair Permit id: 295459 | |||||
Fiber splice Permit id: 274003 | |||||
Fiber splicing cir 94857 enclosure 2696r Permit id: 241895 | |||||
Cable pull Permit id: 239213 | |||||
Fiber splice 0613m -- Permit id: 283775 | |||||
R & r sidewalk upgrade vaults Permit id: 261045 | |||||
Overlash cable Permit id: 237787 | |||||
U g can maint. Permit id: 233461 | |||||
Cable install Permit id: 256172 | |||||
A/c patching emergency gas line repair p/s Date: June 7, 2011 | |||||
A/c patch Date: June 7, 2011 | |||||
Gas line r&r Date: January 7, 2011 | |||||
Install pe Date: June 7, 2011 | |||||
Emergency gas line repairs Date: June 7, 2011 | |||||
Emergency gas repair Date: June 7, 2011 | |||||
Primary fault Date: August 17, 2011 | |||||
Cable injection Date: February 27, 2012 | |||||
Walking inspection Date: May 11, 2012 | |||||
Conduit install-cable Date: May 23, 2013 | |||||
Upgrade vault/trench Date: September 18, 2013 | |||||
Aerial catv maint. Date: July 19, 2013 | |||||
Upgrade vaults Date: October 15, 2013 | |||||
Transformer and wire install Date: August 20, 2013 | |||||
Elect. Box/ r&r sw Date: January 9, 2014 | |||||
R & r sidewalk at pole Date: June 10, 2014 | |||||
Cable installation Date: August 6, 2014 | |||||
Cable installation Date: March 24, 2015 | |||||
Gas line abandonment -- Date: March 10, 2015 | |||||
Excavation -- Date: September 28, 2015 | |||||
Cb repair (power) -- Date: August 29, 2015 | |||||
Gas abandonment -- Date: October 7, 2015 | |||||
Install gas serv. Date: June 7, 2011 | |||||
Cable install Date: December 17, 2013 | |||||
Wire install Date: November 6, 2014 | |||||
Delash/relash fiber r&r sw Date: April 20, 2015 | |||||
Paving Date: June 7, 2011 | |||||
Reduction vlv/a/c patch Date: July 27, 2011 | |||||
R&r gas serv Date: November 21, 2011 | |||||
Repair gas leak backfill & asphalt patch Date: October 25, 2011 | |||||
Jones widening Date: February 2, 2012 | |||||
Install test station Date: January 24, 2012 | |||||
Paving Date: January 19, 2012 | |||||
2" pvc replacement with 2"pe Date: July 27, 2012 | |||||
Remove / replace concrete dig hole fix fault Date: September 20, 2012 | |||||
Delash & relash fiber Date: March 18, 2013 | |||||
Repair pull box Date: April 1, 2015 | |||||
R&r concrete Date: December 5, 2013 | |||||
Cable injection Date: January 3, 2014 | |||||
Repair ugm Date: January 30, 2014 | |||||
Fiber splice Date: March 17, 2014 | |||||
Fiber pull Date: August 28, 2014 | |||||
Cable injection Date: January 6, 2015 | |||||
Gas work (replacement) -- Date: July 15, 2015 | |||||
Ir valve installation Date: September 1, 2015 | |||||
Repair damaged fiber -- Date: November 3, 2015 | |||||
Gas leak repair Date: June 7, 2011 | |||||
Pothole for utilities Date: June 7, 2011 | |||||
Trench (telecomm) r & r sidewalk Date: September 16, 2013 | |||||
Pole work Date: February 19, 2015 | |||||
Bore & pothole Date: April 9, 2015 | |||||
Upgarde vault Date: April 8, 2015 | |||||
Pull cable/ r&r slab/ upgrade vaults -- Date: July 27, 2015 | |||||
Damaged fiber repairs -- Date: November 3, 2015 | |||||
Repair gas leak backfill & asphalt Date: June 7, 2011 | |||||
Cap stubout Date: June 7, 2011 | |||||
Concrete wall repair Date: June 7, 2011 | |||||
Intsll isolation reduction valve Date: April 18, 2011 | |||||
Moving poles Date: February 22, 2012 | |||||
Upgrade o/h transformers Date: July 26, 2012 | |||||
Electrical conduit Date: September 20, 2012 | |||||
Manhole maint. Date: August 9, 2013 | |||||
Trenching install conduit Date: January 31, 2014 | |||||
R & r sidewalk, boring, install conduit, overlash, pull cable Date: April 7, 2014 | |||||
Bore sidewalk/core to locate utility Date: July 23, 2015 | |||||
Gas line repair p/s Date: June 7, 2011 | |||||
Inspect gas line Date: June 7, 2011 | |||||
Conduit install Date: September 4, 2013 | |||||
Upgrade vaults & hualapai way Date: August 13, 2014 | |||||
Retrench power -- Date: August 1, 2015 | |||||
Asphalt trench, pull coax cable -- Date: November 16, 2015 | |||||
Pe gas line relocation Date: March 18, 2011 | |||||
Gas leak Date: June 7, 2011 | |||||
A/c patches Date: June 7, 2011 | |||||
Reduction valve Date: September 29, 2011 | |||||
A/c patch plan voided 1/25/12 sh Date: January 25, 2012 | |||||
U/g can maint. Date: March 21, 2013 | |||||
Cable injection Date: November 14, 2013 | |||||
Bore install conduit/ upgrade vaults/ asphalt trench Date: December 18, 2013 | |||||
R&r sidewalk, trench & install conuit, bore & pothole Date: July 14, 2014 | |||||
Retrench power/r&r sidewalk Date: November 20, 2014 | |||||
Gas service abandonment -- Date: September 5, 2015 | |||||
Gas service install Date: August 20, 2015 | |||||
Locate fault from riser -- Date: October 24, 2015 | |||||
Gas stub abandonment -- Date: November 18, 2015 | |||||
R & r conctete & pole replacement Date: November 20, 2013 | |||||
R&r sidewalk Date: December 16, 2013 | |||||
Gas abandonment Date: March 12, 2015 | |||||
Trench/ place fiber -- Date: September 16, 2015 | |||||
Install test station p/s Date: June 7, 2011 | |||||
Gas valve repair Date: June 7, 2011 | |||||
S/w repair Date: June 7, 2011 | |||||
Repair gas leak Date: April 19, 2011 | |||||
Paving & concrete repair Date: April 7, 2011 | |||||
Emergency jumper repair (power) Date: June 7, 2011 | |||||
Overhead switching Date: January 10, 2012 | |||||
Gas asphalt patching Date: August 30, 2012 | |||||
R&r s/w bore/place vaults Date: January 17, 2013 | |||||
Intercept conduit Date: February 6, 2013 | |||||
Relocate pull box Date: December 4, 2012 | |||||
Power Date: February 25, 2013 | |||||
Cable injection m36341 sister city Date: June 21, 2013 | |||||
Fiber splicing Date: July 24, 2013 | |||||
Well monitoring Date: September 17, 2013 | |||||
C/o oh switch Date: September 16, 2013 | |||||
Overhead construction Date: January 13, 2014 | |||||
Can maint/vault/pole Date: June 26, 2014 | |||||
Trench install conduit Date: October 7, 2014 | |||||
De-lash & re-lash fiber to repair damaged fiber Date: September 2, 2014 | |||||
Overlash fibers on poles Date: August 20, 2015 | |||||
C/o ugm-safety/r&r concrete Date: August 26, 2015 | |||||
Vault maintenance p/s Date: June 7, 2011 | |||||
Remove & replace concrete/ paving Date: November 16, 2012 | |||||
Blue goo injection Date: November 6, 2012 | |||||
Boring / trenching install conduit Date: October 25, 2012 | |||||
Access vaults Date: June 21, 2013 | |||||
Replace cable Date: October 31, 2013 | |||||
R&r sidewalk/install vault Date: April 24, 2014 | |||||
Overhead work Date: January 20, 2015 | |||||
Retrench power Date: December 11, 2014 | |||||
Install new equipment Date: April 16, 2015 | |||||
R&r sidewalk/upgrade vault Date: May 28, 2015 | |||||
Install isolation reduction valve Date: June 7, 2011 | |||||
Pothole/r&r sidewalk/fiber pull/install vault Date: October 29, 2014 | |||||
Trench & bore, install conduit/r&r sidewalk upgrade vault Date: April 9, 2015 | |||||
Walking inspection of gas line every feet Date: March 30, 2011 | |||||
R&r gas serv. Date: June 7, 2011 | |||||
Gas replacement Date: June 1, 2011 | |||||
Lane block / spice cable Date: June 7, 2011 | |||||
Install reduction valve Date: April 20, 2011 | |||||
Raise collar Date: June 7, 2011 | |||||
Cable r&r Date: September 14, 2011 | |||||
Special event vegas streats Date: May 10, 2012 | |||||
Install feeder cable remove o/h cable Date: March 18, 2013 | |||||
Calbe injection Date: November 14, 2012 | |||||
Overlash / fiber pull Date: December 20, 2012 | |||||
Primary fault Date: April 29, 2013 | |||||
Fiber splice Date: July 24, 2013 | |||||
Remove & replace sidewalk / repair conduit Date: November 1, 2013 | |||||
Cable install Date: January 21, 2014 | |||||
Fiber splicing 0503 Date: March 12, 2014 | |||||
R & r sidewalk / upgrade vaults / fiber pull Date: October 16, 2014 | |||||
Upgrade vault Date: October 2, 2014 | |||||
Pole c/o Date: April 16, 2015 | |||||
Gas service install -- Date: June 25, 2015 | |||||
Gas valve install -- Date: September 22, 2015 | |||||
Pri retrench Date: July 10, 2015 | |||||
Trenching/r&r sidewalk/bore/upgrade vault/install conduit Date: August 18, 2015 | |||||
Abandon gas service p/s Date: June 7, 2011 | |||||
Pe relocations drop sections Date: June 7, 2011 | |||||
Install 45 of 1/2" pe gas line Date: June 7, 2011 | |||||
A/c repair Date: June 7, 2011 | |||||
Install isolation reduction valve Date: February 6, 2012 | |||||
Can maint. 211 Date: October 19, 2012 | |||||
A/c patch--plan voided 1/25/12 sh Date: January 25, 2012 | |||||
Feeder cable install Date: November 27, 2012 | |||||
Film shoot Date: January 16, 2013 | |||||
R&r vaults Date: January 7, 2013 | |||||
Wire removal remove transformer Date: March 18, 2013 | |||||
Boring/install conduit Date: January 24, 2014 | |||||
Pole change out Date: May 13, 2014 | |||||
Coax overlay Date: November 6, 2014 | |||||
Gas line abandonment -- wr 2049106 Date: March 12, 2015 | |||||
Cable replacement -- Date: November 13, 2015 | |||||
Repair class 2 leak Date: June 7, 2011 | |||||
Paving from p/s Date: June 7, 2011 | |||||
Install gas serv Date: June 7, 2011 | |||||
Vault maintenance Date: June 7, 2011 | |||||
Fiber slicing Date: August 9, 2013 | |||||
Fiber splice cir 101219 Date: March 24, 2014 | |||||
Pull u/g wire Date: July 1, 2014 | |||||
Repairing broken lashing wire & re-sagging existing overhead lines Date: September 19, 2015 | |||||
Reg station replacement Date: March 9, 2011 | |||||
Power install Date: May 31, 2012 | |||||
Aerial cable pull Date: November 9, 2012 | |||||
Conduit trench boring / trenching Date: November 30, 2012 | |||||
Emerald isle cable injection Date: October 24, 2012 | |||||
Remove & replace vaults Date: May 21, 2013 | |||||
Proofing & fiber pull upgrade vault Date: August 29, 2013 | |||||
R&r concrete pole Date: November 20, 2013 | |||||
Trenching to install conduit Date: November 5, 2013 | |||||
Pull u/g wire Date: May 28, 2015 | |||||
Gas maint -- Date: July 28, 2015 | |||||
Proofing/ pull fiber -- Date: August 26, 2015 | |||||
Replace damaged fiber Date: August 28, 2015 | |||||
Bore install conduit/r&r sidewqalk place vault Date: September 25, 2015 | |||||
Trench/upgrade vaults Date: January 14, 2014 | |||||
Wire pull Date: June 7, 2011 | |||||
Reg station abandonment Date: May 16, 2011 | |||||
Gas service Date: January 3, 2012 | |||||
Proofing conduit -- Date: August 25, 2015 | |||||
Gas - replace Date: October 4, 2012 | |||||
Cable replacement Date: October 3, 2013 | |||||
Pothole/trench Date: October 23, 2013 | |||||
Trenching conduit Date: November 21, 2013 | |||||
R & r sidewalk / pothole / repair conduit Date: March 17, 2014 | |||||
4" pe drop sections Date: June 7, 2011 | |||||
Gas relocation Date: June 7, 2011 | |||||
Gas line replacement Date: July 28, 2011 | |||||
Fiber pull Date: December 10, 2012 | |||||
R & r sidewalk place vault Date: February 6, 2013 | |||||
Tenant buildout Date: April 5, 2013 | |||||
Power -- inject cable in fuse cabinet Date: July 21, 2014 | |||||
Repair ug wire/ r&r concrete Date: February 11, 2015 | |||||
Abandon existing fas service at main p/s Date: June 7, 2011 | |||||
Replace gas service backfill & asphalt patch Date: March 2, 2012 | |||||
Conduit repair Date: June 18, 2013 | |||||
Cb repair o/h Date: September 10, 2014 | |||||
Vault lid maint. Date: June 7, 2011 | |||||
Install gas service Date: June 7, 2011 | |||||
Film permit Date: June 7, 2011 | |||||
Abandon service Date: September 2, 2011 | |||||
C/o fuse cabinet Date: January 18, 2012 | |||||
C/o ugm r & r concrete m44894 Date: April 30, 2013 | |||||
Dig and set pole (power) Date: February 18, 2014 | |||||
R&r asphalt Date: January 13, 2014 | |||||
Tree trimming Date: September 25, 2014 | |||||
Pole construction Date: November 10, 2014 | |||||
O/h reapirs on poles -- Date: October 10, 2015 | |||||
Concrete repair Date: June 7, 2011 | |||||
Reduction vlv Date: July 19, 2011 | |||||
Set pole Date: December 12, 2011 | |||||
Rewire Date: December 10, 2012 | |||||
Retrenching for gas Date: March 29, 2013 | |||||
Boring, trenching install conduit Date: April 23, 2013 | |||||
Manhole access Date: July 29, 2013 | |||||
R&r ugm top section Date: September 16, 2013 | |||||
New u/g wire -- Date: June 22, 2015 | |||||
S/w patch Date: June 7, 2011 | |||||
Replace gas service Date: June 7, 2011 | |||||
Gas service Date: June 7, 2011 | |||||
S/w an a/c patch Date: June 7, 2011 | |||||
Asphalt patching Date: March 22, 2012 | |||||
Bore/pothole Date: December 27, 2013 | |||||
Proof conduti and clean vaults Date: August 8, 2013 | |||||
Fiber pull/upgrade existing vaults/ asphalt trench r&r sw -- Date: July 25, 2015 | |||||
Damaged fiber replacement Date: August 28, 2015 | |||||
Replace 2" gas line 72 paving p/s Date: June 7, 2011 | |||||
Gas valve maint. Date: June 7, 2011 | |||||
Emergency repair (substation power) Date: June 7, 2011 | |||||
Reduction vlv/paving Date: July 7, 2011 | |||||
Backfill inspection asphalt patch Date: December 7, 2011 | |||||
Overhead cable placement Date: January 10, 2013 | |||||
Pole install Date: May 8, 2013 | |||||
Cable injection (power) Date: November 12, 2013 | |||||
Proofing conduit Date: April 22, 2014 | |||||
Proofing conduit/upgrade vaults/fiber install/boring Date: October 7, 2014 | |||||
Gas work replacement -- Date: August 28, 2015 | |||||
Fiber pull -- Date: October 24, 2015 | |||||
Materials delivery Date: June 7, 2011 | |||||
Overhead electrical utility Date: March 29, 2013 | |||||
Fiber pull Date: April 3, 2015 | |||||
Emergency gas repair p/s Date: June 7, 2011 | |||||
Leak repair Date: June 7, 2011 | |||||
Install risers Date: August 8, 2011 | |||||
Gasline abandonment Date: March 22, 2012 | |||||
Aerial can maint. 194 Date: September 28, 2012 | |||||
Fiber overlash Date: February 19, 2013 | |||||
Trenching/boring Date: December 6, 2012 | |||||
Fiber splice prj # 3k 356464 Date: January 3, 2014 | |||||
O/h & u/g electrical utility work Date: December 24, 2014 | |||||
Retrench power Date: April 9, 2015 | |||||
R&r sidewalk/upgrade vaults/replace vaults in dirt Date: February 17, 2015 | |||||
Trench & install conduit/r&r sidewalk place vault Date: December 30, 2014 | |||||
Replace damaged cable and upgrade vault Date: March 19, 2015 | |||||
Inject cable at riser Date: April 16, 2015 | |||||
Gas line maintenance Date: August 28, 2015 | |||||
Fc change out Date: August 29, 2015 | |||||
Pe gas line relocation p/s Date: June 7, 2011 | |||||
Dig inspect gas main repair, pave Date: May 13, 2011 | |||||
Repair ugm Date: June 7, 2011 | |||||
O/h construction 188587 Date: February 26, 2013 | |||||
Upgrade vault Date: May 10, 2013 | |||||
Bore, pothole, s/w, vaults Date: December 29, 2014 | |||||
Relocate existing cable Date: November 17, 2014 | |||||
Repair gas valve p/s Date: June 7, 2011 | |||||
Install new gas line p/s Date: June 7, 2011 | |||||
Emergency gas line repair backfill & patch Date: June 7, 2011 | |||||
Cable injection Date: June 7, 2011 | |||||
A/c patch Date: February 21, 2012 | |||||
Ug can maint. Date: February 5, 2013 | |||||
Power install Date: January 14, 2013 | |||||
Fiber pull Date: January 3, 2013 | |||||
O/h pole repair m44884 Date: March 7, 2013 | |||||
Install conduit on pole Date: December 5, 2013 | |||||
Aerial over lash/asphalt trench Date: November 10, 2014 | |||||
Proofing out conduit Date: July 7, 2015 | |||||
Delash & overlash coax -- Date: October 29, 2015 | |||||
Bore install conduit/dirt trench/install vaults Date: October 22, 2015 | |||||
Install reg station Date: October 13, 2011 | |||||
Bore, pothole, cable pull, vault, overlash Date: August 6, 2014 | |||||
R&r o/h wire Date: May 22, 2015 | |||||
Abandon existing gas service at main p/s Date: June 7, 2011 | |||||
Gas relocate Date: June 7, 2011 | |||||
Reduction valve/a/c patcah Date: July 27, 2011 | |||||
Utility locate Date: October 21, 2011 | |||||
R&r regulator station Date: June 21, 2011 | |||||
Pole maintenance Date: November 9, 2011 | |||||
Gas 2" pe relocate Date: November 10, 2011 | |||||
Inject blue goo Date: September 19, 2013 | |||||
Trench / r & r sidewalk bore install conduit prj # 40520130000cf97847 Date: October 23, 2013 | |||||
Bore/ r&r sw/ place vault Date: January 9, 2014 | |||||
Ug utility work Date: January 13, 2015 | |||||
S/w, upgrade vault, place riser Date: June 3, 2015 | |||||
Cable pull -- Date: October 28, 2015 | |||||
Dirt trench in private property Date: November 5, 2015 | |||||
R&r ugm Date: March 11, 2013 | |||||
Power installation Date: August 28, 2015 | |||||
Install 1" riser p/s Date: June 7, 2011 | |||||
Install 64 of 1" pe gas line Date: June 7, 2011 | |||||
Backfill & asphalt emergency gas line repair Date: June 7, 2011 | |||||
Backfill inspection & pavement repair Date: June 7, 2011 | |||||
Boring / trenching to install conduit Date: October 5, 2012 | |||||
Trench / bore / sidewalk r & r Date: November 26, 2012 | |||||
Rebuild elect. Box Date: April 4, 2013 | |||||
R&r pole Date: August 20, 2013 | |||||
Pole change out Date: September 16, 2013 | |||||
Making strides against breast cancer 5 k walk -- special event -- Date: October 1, 2013 | |||||
Change out electric box Date: September 18, 2014 | |||||
R&r concrete to repair ugm Date: October 20, 2014 | |||||
R&r concrete -- Date: June 26, 2015 | |||||
R & r sidewalk bore / place vaults Date: September 19, 2013 | |||||
Delash & relash fiber Date: September 1, 2015 | |||||
Paving from install 4 of 2" pe p/s Date: June 7, 2011 | |||||
Replace sidewalk after emergency gas line repair p/s Date: June 7, 2011 | |||||
Install of 1" pe gas line p/s Date: June 7, 2011 | |||||
Install isolation valve Date: June 7, 2011 | |||||
Install 5 term test stations at end of main p/s Date: June 7, 2011 | |||||
Repair gas lak backfill & aphalt patch Date: January 11, 2011 | |||||
Wire removal Date: September 20, 2012 | |||||
Making strides against breast cancer 5 k walk -- special event -- Date: October 2, 2012 | |||||
Install clv bus turn out Date: January 25, 2013 | |||||
R&r vaults/s/w Date: January 22, 2013 | |||||
U/g can maint.-492-1191 2889 Date: October 27, 2015 | |||||
Pole replacement Date: February 25, 2013 | |||||
Proofing conduit / clean vaults Date: July 3, 2013 | |||||
Cable replace Date: September 26, 2013 | |||||
Landscaping/trees Date: April 7, 2014 | |||||
R & r 10 mcm Date: June 18, 2014 | |||||
Ug & oh electric Date: March 10, 2015 | |||||
Overlash/delash -- Date: July 8, 2015 | |||||
Replace service line p/s Date: June 7, 2011 | |||||
Split & pull gas line replacement 1721 of split & pull Date: June 7, 2011 | |||||
Repair a/c Date: June 7, 2011 | |||||
Remediaton after pole removal Date: June 7, 2011 | |||||
R&r fuse cabinet Date: July 26, 2011 | |||||
Cable cure m28983 Date: September 20, 2012 | |||||
Cable install Date: October 30, 2012 | |||||
Vault maint. Date: November 27, 2012 | |||||
R&r vault Date: January 17, 2013 | |||||
Proofing/upgrade vaults Date: October 29, 2014 | |||||
R & r sw, trench, upgrade vault Date: March 17, 2014 | |||||
R&r sidewalk/dirt trench/upgrade vault Date: August 25, 2014 | |||||
Aerial cable Date: June 10, 2015 | |||||
Install new ug wire -- Date: August 19, 2015 | |||||
Ug utility work -- Date: September 1, 2015 | |||||
Replace gas valve p/s Date: June 7, 2011 | |||||
Pole replacement Date: June 7, 2011 | |||||
Otp container (power) Date: August 20, 2013 | |||||
Gas work installation Date: August 26, 2015 | |||||
Pothole gas line Date: January 3, 2011 | |||||
Replace o/h lines Date: September 19, 2011 | |||||
Activate o/h sw Date: January 4, 2012 | |||||
Film shoot Date: September 2, 2011 | |||||
Pole change out Date: April 30, 2012 | |||||
Aerial can maint. Date: March 21, 2013 | |||||
R & r sidewalk and asphalt trench Date: January 4, 2013 | |||||
Place vault Date: July 1, 2013 | |||||
Change out electrical vault / box Date: January 15, 2014 | |||||
R&r sidewalk/install conduit Date: January 14, 2014 | |||||
C/o electric box Date: September 17, 2014 | |||||
Retrench Date: October 9, 2014 | |||||
Backfill asphalt patching Date: February 27, 2012 | |||||
Potholing for utilites p/s Date: June 7, 2011 | |||||
Back fill & asphalt patch emergecny gas line repair Date: June 7, 2011 | |||||
Relocate 4" pe p/s Date: February 11, 2011 | |||||
Gas Date: October 4, 2011 | |||||
R & r sidewalk / trenching Date: December 28, 2012 | |||||
Proof conduits & clean vaults Date: January 22, 2013 | |||||
Cable overlash Date: December 26, 2012 | |||||
De-lash-relash cable Date: June 27, 2013 | |||||
Fiber opitic splice Date: November 25, 2013 | |||||
Repair fire damage Date: July 16, 2014 | |||||
S/w, trench, pull box Date: August 28, 2014 | |||||
Upgrade vaults Date: September 2, 2014 | |||||
Asphalt trench/bore/r&r sidewalk/repair Date: December 1, 2014 | |||||
R&r sw , coax pull Date: July 29, 2015 | |||||
Cb repair Date: June 6, 2015 | |||||
Electric install Date: October 12, 2012 | |||||
Aerial fiber pull Date: November 19, 2013 | |||||
Pad change out Date: November 19, 2013 | |||||
Repair ug cable/sw r&r Date: November 5, 2014 | |||||
R&r sidewalk/repair conduit Date: September 15, 2014 | |||||
Gas work (installation/abandonment) -- Date: July 24, 2015 | |||||
Repair u/g wire Date: July 19, 2013 | |||||
Remove old poles r & r concrete Date: September 16, 2014 | |||||
Cable install Date: March 10, 2015 | |||||
Pull coax -- Date: September 21, 2015 | |||||
Fix gas leak Date: May 17, 2011 | |||||
Gas serv Date: June 7, 2011 | |||||
Proof existing catv conduit Date: September 4, 2013 | |||||
Fiber splice Date: December 3, 2012 | |||||
Overhead electrical Date: July 15, 2013 | |||||
Repair sage and remove blanket Date: September 4, 2013 | |||||
Pad change out Date: March 20, 2014 | |||||
Cable injection in fuse cabinet Date: April 14, 2014 | |||||
R&r sidewalk/upgrade vault Date: November 20, 2014 | |||||
Oh maint Date: January 20, 2015 | |||||
Pothole/bore Date: June 6, 2015 | |||||
Replace 2" gas line 72 p/s Date: June 7, 2011 | |||||
R&r concrete to repair hole Date: July 16, 2014 | |||||
O/h utility Date: February 25, 2015 | |||||
Bore install conuit/ upgrade vault Date: June 6, 2015 | |||||
Gas work (install) -- Date: July 31, 2015 | |||||
Trench to install conduit (telecom)-- Date: September 19, 2015 | |||||
Pothole for 4" seeetl gas main for possible damage to cp wires p/s Date: June 7, 2011 | |||||
Backfill asphalt emergency gas repair p/s Date: June 7, 2011 | |||||
Isolation reduction valve install Date: June 7, 2011 | |||||
C/o existing pole Date: October 31, 2011 | |||||
Install cable Date: July 20, 2012 | |||||
R&r s/w upgrade vault Date: January 4, 2013 | |||||
Neon bazaar Date: May 8, 2013 | |||||
Upgrand vault Date: October 3, 2013 | |||||
Proofing/fiber pull Date: January 3, 2014 | |||||
R&r sidewalk/conduit Date: January 21, 2014 | |||||
Trenching/install conduit Date: December 24, 2013 | |||||
R&r s/w, upgrade vault Date: April 17, 2014 | |||||
Repair u/g cable Date: October 7, 2014 | |||||
Inject cable Date: November 5, 2014 | |||||
Trench install conduit, r&r sw Date: April 10, 2015 | |||||
Gas work -- Date: July 11, 2015 | |||||
Retrench gas line m44699 Date: February 19, 2013 | |||||
Trenching/r&r sidewalk/conduit Date: January 27, 2014 |