ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Bedroom addition to 2nd floor and screen porch Date: February 4, 2016 Value: $125,000Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 741686 | |||||
200amp heavy up Date: October 12, 2011Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 581959 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: March 29, 2016Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 749733 | |||||
Residential - addition- heating/cooling equip & ductwork Date: April 29, 2016Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 753563 | |||||
Dirt cut,expose 3/4" w/s service & install 2 wire t/s & 2 anodes, gas service in accordance with washington gas plan no. 133551. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: February 10, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 272777 | |||||
Replacegas service in accordance with washington gas plan no. 297693. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: May 15, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 313586 |