ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install cameras at tyson hall it roompdx-12601 Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-237080-000 | |||||
Buckley center-card reader add at door 18b. Camera adds at door 18b and media storagepdx-11955 Date: February 23, 2015Permit type: Intake | Permit status: Closed | Completion date: February 23, 2015 | Permit id: 2015-122896-000 | |||||
Installation of audio & visual systems at new fitness center Date: March 6, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: June 17, 2015 | Permit id: 2015-129877-000 | |||||
3-31-15 noise complaint - amplified music Permit type: Request | Permit status: Closed | Completion date: March 31, 2015 | Permit id: 2015-142810-000 | |||||
Renovation of existing single story building with partial basement; demo interior walls to reconfigure kitchen; add new walls and reconfigure walls for new bathroom, storage room, 2 offices; addition of large refregerator to the back of building; addition of 2 new vestibules; siesmic upgrade to partially unreinforced masonry buildling Date: June 22, 2015Permit type: Application | Permit status: Approved | Completion date: April 1, 2015 | Permit id: 2015-143103-000 | |||||
Dfs for tji joists Permit type: Application | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-143103-Dfs | |||||
Dfs for tji joists Permit type: Application | Permit status: Manually verified | Completion date: July 6, 2015 | Permit id: 2015-143103-Dfs | |||||
Dfs for tji joists Permit type: Issuance/intake | Permit status: Intake | Completion date: July 6, 2015 | Permit id: 2015-143103-Dfs | |||||
4-t gas pack, 5 type 2 hood, 12 type 1 hood, fire wrap, refrigeration, mua via gas packs interlocked w/efs, plans w/co Date: June 22, 2015Permit type: Intake | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2015-143111-000 | |||||
Renovate existing basement level story - partial change of occupancy from group b office and group s-1 storage to group r-2 sleeping rooms; demo walls and add new walls to create 15 units (32 beds) and two community restrooms; add new windows on east and south elevations Date: June 10, 2015Permit type: Application | Permit status: Approved | Completion date: April 9, 2015 | Permit id: 2015-147017-000 | |||||
Two 5 cfm 8 kw electric heat fan coils (no cooling), plans w/co Date: June 10, 2015Permit type: Intake | Permit status: Closed | Completion date: April 14, 2015 | Permit id: 2015-147033-000 | |||||
Remodel existing print shop and small classroom spaces; demo walls and add new walls to create new wet lab, prep room, cage room, storage, experiment trial planning, offices and reception area; Date: June 5, 2015Permit type: Application | Permit status: Approved | Completion date: April 9, 2015 | Permit id: 2015-147048-000 | |||||
Replace existing registers and ductwork to accomodate new layout, 1-ton ductless split, plans w/co Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: April 14, 2015 | Permit id: 2015-147053-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Application | Permit status: Approved | Completion date: April 13, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Application | Permit status: Manually verified | Completion date: April 13, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Issuance/intake | Permit status: Intake | Completion date: April 13, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Addressing | Permit status: Not reqd | Completion date: April 14, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Erosion control | Permit status: Approved | Completion date: April 21, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Site development | Permit status: Approved | Completion date: April 21, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Structural | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: April 22, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Transportation | Permit status: Not reqd | Completion date: April 16, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Transportation | Permit status: Approved | Completion date: April 24, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 14, 2015 | Permit id: 2015-148437-000 | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Permit type: Parks bureau | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-148437-000 | |||||
First floor remodel; demo walls and add new walls to reconfigure office spaces; Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: April 22, 2015 | Permit id: 2015-154520-000 | |||||
Replace existing registers and ductwork to accomodate new office remodel, plans w/co Date: June 19, 2015Permit type: Intake | Permit status: Closed | Completion date: April 24, 2015 | Permit id: 2015-154527-000 | |||||
(400) amp service and (8) circuits for lighting in new baseball stadium Date: April 27, 2015Permit type: Intake | Permit status: Closed | Completion date: April 27, 2015 | Permit id: 2015-159505-000 | |||||
New and demolished walls to create additional offices on 2nd and 3rd floors Date: June 19, 2015Permit type: Application | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161431-000 | |||||
Reconfigure existing ductwork to accomodate remodel, plans w/co Date: June 19, 2015Permit type: Intake | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161450-000 | |||||
Install (8) new 80ft lighting pole Date: April 30, 2015Permit type: Application | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161615-000 | |||||
Das coax cabling Date: May 4, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2015-164402-000 | |||||
Interior remodel to infill one of the doors and add new walls to create four office spaces and classroom Date: June 29, 2015Permit type: Application | Permit status: Approved | Completion date: May 6, 2015 | Permit id: 2015-165713-000 | |||||
Reconfigure existing ductwork, grilles, and resters to accomodate new office layout, plans w/co Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: May 6, 2015 | Permit id: 2015-165719-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Alarm - fire alarm installation Date: June 24, 2015Permit type: Intake | Permit status: Approved | Completion date: June 1, 2015 | Permit id: 2015-178622-000 | |||||
Sprinkler - add and relocate sprinklers for ti Date: June 30, 2015Permit type: Intake | Permit status: Approved | Completion date: June 5, 2015 | Permit id: 2015-181330-000 | |||||
Sprinker - relocate and add fire sprinklers in ti Date: June 30, 2015Permit type: Intake | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-183220-000 | |||||
Sprinkler - relocate and add fire sprinklers in ti Date: June 30, 2015Permit type: Intake | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2015-183233-000 | |||||
Alarm-fire alarm upgrads for basement ti Permit type: Intake | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189609-000 | |||||
Alarm-fire alarm upgrads for basement ti Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-189609-000 | |||||
Provide storm piping for new river campus parking lot at the bottom of n van houten place & van houten ct Date: June 23, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 24, 2015 | Permit id: 2015-190470-000 | |||||
Electrical for remodel of pilot house cafeteria Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190786-000 | |||||
Install 1 shower, 2 floor drains, 1 floor sink, 7 hand sinks, and 2 water heaters. Date: June 23, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-190904-000 | |||||
Install card readers at buckley, basement, 1st, 2nd and 3rd floors. Pdx-13142 Date: June 24, 2015Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191699-000 | |||||
Installing amax dgx system, speakers and monitors Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: June 29, 2015 | Permit id: 2015-193831-000 | |||||
Two 12 type 1 hoods, one new heated mau w/mod interlocked w/efs, structural details attached Date: July 2, 2015Permit type: Intake | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-194113-000 | |||||
Sprinklers-add/relocate existing sprinklers for new wall/ceilings-add dry valve to cover front canopies & exterior freezer. Permit type: Intake | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-194570-000 | |||||
Sprinklers-add/relocate existing sprinklers for new wall/ceilings-add dry valve to cover front canopies & exterior freezer. Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-194570-000 | |||||
Alarm-fire alarm upgrade in t. I areas & voice upgrades in building Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196467-000 | |||||
Alarm-fire alarm upgrade in t. I areas & voice upgrades in building Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196467-000 | |||||
Alarm - fire alarm system install for remodel Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196469-000 | |||||
Alarm - fire alarm system install for remodel Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196469-000 | |||||
Complaint received: loudspeaker at soccer stadium is louder on friday and saturday games. Sat pm games are not as loud Permit type: Request | Permit status: Closed | Completion date: November 13, 2009 | Permit id: 2009-171453-000 | |||||
Complaint received: loudspeaker at soccer stadium is louder on friday and saturday games. Sat pm games are not as loud Permit type: Request | Permit status: Closed | Completion date: September 25, 2014 | Permit id: 2009-171453-000 | |||||
Demo existing bathrooms and install new bathrooms per plan 12-114845 co Date: June 12, 2012Permit type: Intake | Permit status: Closed | Completion date: June 12, 2012 | Permit id: 2012-149491-000 | |||||
Pbot pw permitu of p main entry improvements Date: August 8, 2014Permit type: Intake pw | Permit status: Assigned | Completion date: March 7, 2014 | Permit id: 2014-113845-000 | |||||
Tyson hall-install access control at it department pdx-11547 Date: April 4, 2014Permit type: Intake | Permit status: Closed | Completion date: April 4, 2014 | Permit id: 2014-136125-000 | |||||
Alter existing main campus entry, replace pavement, curbs, striping and landscaping, extend plaza at new round-about, new storm water management rain garden facility, includes all associated site work Date: June 11, 2014Permit type: Application | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2014-146228-000 | |||||
Replacement of baseball field turf with new artifical turf with vertical drainage system, and replacement of existing fence 4-25, two foul poles at 30. Note: no changes to field lighting without conditional use review. Jmr Date: July 21, 2014Permit type: Application | Permit status: Approved | Completion date: May 8, 2014 | Permit id: 2014-154420-000 | |||||
Sprinkler - relocate & replace 8 heads for new ceiling Date: May 21, 2014Permit type: Intake | Permit status: Approved | Completion date: May 21, 2014 | Permit id: 2014-159535-000 | |||||
Install access control and video surveillance at the recreation and wellness center pdx-10017 Date: June 11, 2014Permit type: Intake | Permit status: Closed | Completion date: June 11, 2014 | Permit id: 2014-167900-000 | |||||
Wire charging stations Date: June 24, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 31, 2014 | Permit id: 2014-174425-000 | |||||
Tyson hall voice & data Date: June 24, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 28, 2014 | Permit id: 2014-174461-000 | |||||
Install shelving in equipment room at chiles center for storage Date: June 25, 2014Permit type: Application | Permit status: Approved | Completion date: June 25, 2014 | Permit id: 2014-174587-000 | |||||
Install exterior site lighting Date: June 27, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 4, 2014 | Permit id: 2014-176165-000 | |||||
Reconfigure existing classroom on third floor to create 2 nursing simulation labs with sinks plan does contain med gas Date: August 14, 2014Permit type: Application | Permit status: Approved | Completion date: June 30, 2014 | Permit id: 2014-177315-000 | |||||
Relocating diffusers and add air transfer between rooms Date: August 7, 2014Permit type: Intake | Permit status: Closed | Completion date: July 1, 2014 | Permit id: 2014-177321-000 | |||||
Alter existing main campus entry (sector 1 and sector 2 only). Install (7) catch basins and 8 of storm sewer. Date: July 1, 2014Permit type: Intake | Permit status: Closed | Completion date: July 1, 2014 | Permit id: 2014-178042-000 | |||||
Install access control Date: July 3, 2014Permit type: Intake | Permit status: Closed | Completion date: July 3, 2014 | Permit id: 2014-178975-000 | |||||
Environmental services Permit status: Closed | Completion date: July 8, 2014 | Permit id: 2014-180571-000 | |||||
Mail center & print services tenant improvement Date: July 14, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: November 26, 2014 | Permit id: 2014-183540-000 | |||||
Add mailroom door to access control system pdx-12305 Date: July 16, 2014Permit type: Intake | Permit status: Closed | Completion date: July 16, 2014 | Permit id: 2014-184444-000 | |||||
Remodel interior lobby - replace laminate wall panels, replace and upgrade interior door and relite to resource center Date: July 18, 2014Permit type: Application | Permit status: Approved | Completion date: July 18, 2014 | Permit id: 2014-186286-000 | |||||
Installation of conduit for future sports lighting around joe etzel baseball stadium. Work also includes new circuit and breaker for existing scoreboard. Date: July 23, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: February 10, 2015 | Permit id: 2014-188204-000 | |||||
Low voltage wiring to relocate existing thermostatfaxed Date: August 7, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-194906-000 | |||||
Install (2) new sinks and medical gas Date: August 7, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-194974-000 | |||||
Install 1 lf of 8 storm drain and (2) catch basins at baseball field Date: August 8, 2014Permit type: Intake | Permit status: Closed | Completion date: August 8, 2014 | Permit id: 2014-195803-000 | |||||
Buckley center nursing lab ti Date: August 13, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 9, 2014 | Permit id: 2014-198297-000 | |||||
Sprinkler-replace pendent sprinklers where ceiling tile is removed and set at new elevations & layout. Qr heads to be used. Date: August 20, 2014Permit type: Intake | Permit status: Approved | Completion date: August 20, 2014 | Permit id: 2014-201227-000 | |||||
Installation of low voltage cameras and tvs in nursing building Date: September 8, 2014Permit type: Intake | Permit status: Closed | Completion date: September 8, 2014 | Permit id: 2014-209228-000 | |||||
Replace existing baseball scoreboard, move from left field to right field area Date: September 23, 2014Permit type: Application | Permit status: Approved | Completion date: September 23, 2014 | Permit id: 2014-216458-000 | |||||
Remodel room with open office area, two private offices and one conference room into two 45 person classrooms Date: November 3, 2014Permit type: Application | Permit status: Approved | Completion date: October 8, 2014 | Permit id: 2014-223160-000 | |||||
Reconfigure ductwork for classroom remodel Date: November 3, 2014Permit type: Intake | Permit status: Closed | Completion date: October 8, 2014 | Permit id: 2014-223165-000 | |||||
Tyson hall v/d Date: October 10, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 16, 2014 | Permit id: 2014-223996-000 | |||||
Alarm-add one device, relocate one Date: October 28, 2014Permit type: Intake | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2014-231335-000 | |||||
Electrical associated with remodel at buckley center Date: October 28, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: December 10, 2014 | Permit id: 2014-231496-000 | |||||
Relocate existing ductwork and grilles Date: November 4, 2014Permit type: Intake | Permit status: Closed | Completion date: November 4, 2014 | Permit id: 2014-233990-000 | |||||
Sprinkler-relocate existing sprinkler heads and addition of three sprinkler heads to accomodate new wall and new t-bar ceiling Date: November 25, 2014Permit type: Intake | Permit status: Approved | Completion date: November 6, 2014 | Permit id: 2014-235088-000 | |||||
Provide and install new 1,2 mbh steam boiler, vented to roof, to take building off central steam, install 2 new condensing natural gas water heaters to replace existing water heater, work to be in basement interior room, new 1-hr room by others Date: July 21, 2015Permit type: Intake | Permit status: Approved | Completion date: July 21, 2015 | Permit id: 2015-204741-000 | |||||
Install new gas fired condensing boiler in basement to take the building off central steam, gas piping Date: July 21, 2015Permit type: Intake | Permit status: Approved | Completion date: July 21, 2015 | Permit id: 2015-204749-000 | |||||
Install new local disconnect and power wiring to boiler. Install new epo switch to bike storage and required code areas. Connect all safeties after new boiler is installed to burner box. Date: July 23, 2015Permit type: Intake | Permit status: Closed | Completion date: July 23, 2015 | Permit id: 2015-206339-000 | |||||
Install new 600a fused switch in service gear. Install feeders to new electric boiler with local fused disconnect. Install new circuit breaker in panel in panel to feed circulation pump. Insall epo as required by local & state codes. Date: August 6, 2015Permit type: Intake | Permit status: Closed | Completion date: July 23, 2015 | Permit id: 2015-206353-000 | |||||
Shipstad hall - install new circuit breaker in existing panel for hydrotherm kn16. Install epo as required by code for boiler in mechanical room 21. Demo out existing heating water pump. Install new hand-off auto at each pump Date: July 24, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 25, 2015 | Permit id: 2015-206803-000 | |||||
Provide and install (2) new water heaters to replace one existing. (1) new floor sink and (1) new back flow preventer. Date: July 24, 2015Permit type: Intake | Permit status: Closed | Completion date: July 24, 2015 | Permit id: 2015-206891-000 | |||||
Install gas piping for new equipment. Modify (e) for new locations Date: July 28, 2015Permit type: Intake | Permit status: Closed | Completion date: July 28, 2015 | Permit id: 2015-208223-000 | |||||
University of portland - franz hall (1) le ckt Date: August 4, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: September 9, 2015 | Permit id: 2015-211639-000 | |||||
University of portland - villa maria (1) le ckt Date: August 4, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 11, 2015 | Permit id: 2015-211643-000 | |||||
1 kw electric boiler piped to existing converter Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2015-213224-000 | |||||
Hvac low voltage Date: August 7, 2015Permit type: Intake | Permit status: Closed | Completion date: August 7, 2015 | Permit id: 2015-213995-000 | |||||
Christie hall - university of portland - phase 1: electrical for boiler installation Date: August 13, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 9, 2015 | Permit id: 2015-217551-000 | |||||
Change of occupancy to convert existing a3 to b for new offices space Date: November 3, 2015Permit type: Application | Permit status: Approved | Completion date: August 14, 2015 | Permit id: 2015-218141-000 | |||||
Alarm-add two, smoke/heat. Add one/relocate one, notification device Date: August 17, 2015Permit type: Intake | Permit status: Approved | Completion date: August 17, 2015 | Permit id: 2015-219089-000 | |||||
Network cabling Date: August 17, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-219189-000 | |||||
Approval of: conditional use for a wireless telecommunications facility, per the approved site plans, exhibits c-4 through c-8, signed and dated march 4, 2016, subject to the following condition:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 4-c. 8. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-221399 cu. Date: March 7, 2016Permit type: Land use review | Permit status: Completed | Completion date: August 28, 2015 | Permit id: 2015-221399-000 | |||||
Install 8 remote roof top condensing units Date: August 25, 2015Permit type: Intake | Permit status: Approved | Completion date: August 25, 2015 | Permit id: 2015-224879-000 | |||||
Install 6 120v circuits for projectors and screens Date: August 26, 2015Permit type: Intake | Permit status: Closed | Completion date: August 26, 2015 | Permit id: 2015-225534-000 | |||||
Remove and replace 3 antennas on rooftop telecommunications site Date: October 27, 2015Permit type: Application | Permit status: Approved | Completion date: August 27, 2015 | Permit id: 2015-226589-000 | |||||
Audio/video system. Projectors and screens install Date: August 27, 2015Permit type: Intake | Permit status: Closed | Completion date: August 27, 2015 | Permit id: 2015-227001-000 | |||||
Install access control for doros at pilot house remodel. L area. Pdx-13162 Date: August 31, 2015Permit type: Intake | Permit status: Closed | Completion date: August 31, 2015 | Permit id: 2015-228741-000 | |||||
Modification of existing janitors closet to boiler room Date: September 2, 2015Permit type: Application | Permit status: Approved | Completion date: September 2, 2015 | Permit id: 2015-230583-000 | |||||
Sprinkler-removal of fire hoses. Building is fully sprinkled. Date: September 11, 2015Permit type: Intake | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-235178-000 | |||||
Install irrigation system see 15-243428-al Date: October 7, 2015Permit type: Intake | Permit status: Closed | Completion date: October 7, 2015 | Permit id: 2015-247460-000 | |||||
Backflow installation for non potable water - irrigation only Date: October 7, 2015Permit type: Intake | Permit status: Closed | Completion date: October 7, 2015 | Permit id: 2015-247465-000 | |||||
Franz hall-add card reader to newly installed door room 118. Pdx - 12769 Date: October 14, 2015Permit type: Intake | Permit status: Closed | Completion date: October 14, 2015 | Permit id: 2015-251092-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Application | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Application | Permit status: Manually verified | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Issuance/intake | Permit status: Intake | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Process management | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Planning and zoning | Permit status: Approved | Completion date: December 21, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Planning and zoning | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Site development | Permit status: Not reqd | Completion date: October 26, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Life safety | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Life safety | Permit status: Approved | Completion date: December 28, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Structural | Permit status: Not reqd | Completion date: October 24, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Mechanical review | Permit status: Closed | Completion date: October 29, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Fire bureau | Permit status: Approved | Completion date: December 21, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Fire bureau | Permit status: Approved | Completion date: November 17, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Environmental services | Permit status: Not reqd | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Transportation | Permit status: Not reqd | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Water bureau review | Permit status: Not reqd | Completion date: November 2, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Issuance | Permit status: Approved | Completion date: January 13, 2016 | Permit id: 2015-253278-000 | |||||
New supply air duct from existing duct/system to workout room, plans w/co Permit type: Intake | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct/system to workout room, plans w/co Permit type: Process management | Permit status: Closed | Completion date: December 18, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct/system to workout room, plans w/co Permit type: Mechanical review | Permit status: Approved | Completion date: December 22, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct/system to workout room, plans w/co Permit type: Fire bureau | Permit status: Not reqd | Completion date: October 29, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct/system to workout room, plans w/co Permit type: Issuance | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2015-253286-000 | |||||
Recreation and wellness hall - install a shunting reader and sounder for exit door. Pdx-13333 Date: October 29, 2015Permit type: Intake | Permit status: Closed | Completion date: October 29, 2015 | Permit id: 2015-257890-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Application | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Application | Permit status: Manually verified | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Issuance/intake | Permit status: Intake | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Addressing | Permit status: Not reqd | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Planning and zoning | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Erosion control | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Site development | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Life safety | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Life safety | Permit status: Not reqd | Completion date: March 16, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Structural | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Fire bureau | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Environmental services | Permit status: Not reqd | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Transportation | Permit status: Not reqd | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 15, 2016 | Permit id: 2016-114052-000 | |||||
Add two antennas; four remote radioheads rrhss; three surge protectors; remove four tower mounted amplifiers (tmas) at roof top telecommunications facility. Date: April 22, 2016Permit type: Application | Permit status: Approved | Completion date: March 28, 2016 | Permit id: 2016-141163-000 | |||||
Adjustment request to exempt nonconforming upgrades Permit type: Land use review | Permit status: Completed | Completion date: March 29, 2016 | Permit id: 2016-141315-000 | |||||
Sprinklers-install dry heads in parking garge and storage rooms for coverage Date: April 11, 2016Permit type: Intake | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2016-149313-000 | |||||
Sprinklers-add overage under duct work in storage closet Date: April 11, 2016Permit type: Intake | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2016-149318-000 | |||||
State epermit 59000-bel-12-00213: install emergency phone and strobe in shiley hall study hall, first and second floorspdx-10557 Date: April 11, 2012Permit type: Administration | Permit status: Closed | Completion date: April 11, 2012 | Permit id: 2012-128826-000 | |||||
State epermit 59000-bel-12-00248: data / catvfaxed Date: April 26, 2012Permit type: Administration | Permit status: Closed | Completion date: April 26, 2012 | Permit id: 2012-134858-000 | |||||
Low voltage wiring t-statfaxed Date: June 26, 2012Permit type: Intake | Permit status: Closed | Completion date: June 26, 2012 | Permit id: 2012-154891-000 | |||||
State epermit 59000-bel-12-00488: speaker and a / v installfaxed Date: August 1, 2012Permit type: Process management | Permit status: Closed | Completion date: July 26, 2012 | Permit id: 2012-165833-000 | |||||
Low voltage for hvac controlsfaxed Date: October 9, 2012Permit type: Intake | Permit status: Closed | Completion date: October 9, 2012 | Permit id: 2012-192051-000 | |||||
Install access control at the w employee entrance to chiles center pdx-10890faxed Date: October 17, 2012Permit type: Intake | Permit status: Closed | Completion date: October 17, 2012 | Permit id: 2012-195212-000 | |||||
Swapping out three existing antennas with three new antennas and adding three new antennas and related ancillary equipment; antennas to be housed in new stealth cannister. Antennas located on the buckley center. Date: September 13, 2013Permit type: Application | Permit status: Approved | Completion date: November 8, 2012 | Permit id: 2012-203535-000 | |||||
Install data faxed Date: February 8, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: October 2, 2015 | Permit id: 2013-114258-000 | |||||
State epermit 59000-bel-13-00162: a/v install in multiple conference rooms. Includes tv, speakers and necessary wiring. Faxed Date: March 20, 2013Permit type: Administration | Permit status: Closed | Completion date: March 20, 2013 | Permit id: 2013-129857-000 | |||||
Haggerty remodel - data cabling install Date: November 26, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: September 18, 2015 | Permit id: 2014-133754-000 | |||||
Haggerty hall - door adds to access control system pdx-12141faxed Date: April 9, 2014Permit type: Intake | Permit status: Closed | Completion date: April 9, 2014 | Permit id: 2014-137819-000 | |||||
Installation of low voltage cameras and tvs in nursing buildingfaxed Date: September 8, 2014Permit type: Intake | Permit status: Closed | Completion date: September 8, 2014 | Permit id: 2014-209228-000 | |||||
Add nurses training center to access control systempdx-12561faxed Date: October 7, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: March 23, 2016 | Permit id: 2014-222239-000 | |||||
Install cameras at tyson hall it roompdx-12601faxed Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-237080-000 | |||||
Dfs for tji joists Date: September 24, 2015Permit type: Application | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-143103-Dfs | |||||
Dfs for aluminum storefronts and aluminum doors Date: October 5, 2015Permit type: Application | Permit status: Approved | Completion date: August 27, 2015 | Permit id: 2015-143103-Dfs | |||||
Dfs for frp composite strengthening Date: October 15, 2015Permit type: Application | Permit status: Approved | Completion date: September 24, 2015 | Permit id: 2015-143103-Dfs | |||||
Site work for modifications to existing walkways and landscaping between the existing chiles center arena, and etzel baseball field, accessibility upgrades, modifications to stormwater system, add bike parking. Date: December 11, 2015Permit type: Application | Permit status: Approved | Completion date: April 13, 2015 | Permit id: 2015-148437-000 | |||||
New parking lot lighting Date: April 22, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-155183-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Add locker rooms to existing campus building Date: May 26, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 8, 2015 | Permit id: 2015-175554-000 | |||||
Villa maria - electrical alteration and branch circuits Date: May 28, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2015-176994-000 | |||||
Interior remodel on existing building Date: June 11, 2015Permit type: Inspections | Permit status: Approved | Completion date: October 7, 2015 | Permit id: 2015-184418-000 | |||||
Alarm-fire alarm upgrads for basement ti Date: July 9, 2015Permit type: Intake | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189609-000 | |||||
Electrical for remodel of pilot house cafeteria Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190786-000 | |||||
Sprinklers-add/relocate existing sprinklers for new wall/ceilings-add dry valve to cover front canopies & exterior freezer. Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-194570-000 | |||||
Alarm-fire alarm upgrade in t. I areas & voice upgrades in building Date: July 28, 2015Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196467-000 | |||||
Alarm - fire alarm system install for remodel Date: July 27, 2015Permit type: Intake | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196469-000 | |||||
4 branch circuit Date: July 8, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 14, 2015 | Permit id: 2015-198431-000 | |||||
Fixed system - install two wet chem fire suppression systems on two independent kitchen exhaust hoods Date: July 23, 2015Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-201121-000 | |||||
(7) circuits and low voltage for renovation of existing bookstore Date: July 29, 2015Permit type: Intake | Permit status: Closed | Completion date: July 15, 2015 | Permit id: 2015-201584-000 | |||||
Alarm-add two, smoke heat. Add one relocate one, notification device Date: August 17, 2015Permit type: Intake | Permit status: Approved | Completion date: August 17, 2015 | Permit id: 2015-219089-000 | |||||
Audio video system. Projectors and screens install Date: August 27, 2015Permit type: Intake | Permit status: Closed | Completion date: August 27, 2015 | Permit id: 2015-227001-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Application | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Application | Permit status: Manually verified | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Issuance/intake | Permit status: Intake | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Process management | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Planning and zoning | Permit status: Approved | Completion date: December 21, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Planning and zoning | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Site development | Permit status: Not reqd | Completion date: October 26, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Life safety | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Life safety | Permit status: Approved | Completion date: December 28, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Structural | Permit status: Not reqd | Completion date: October 24, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Mechanical review | Permit status: Closed | Completion date: October 29, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Fire bureau | Permit status: Approved | Completion date: December 21, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Fire bureau | Permit status: Approved | Completion date: November 17, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Environmental services | Permit status: Not reqd | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Transportation | Permit status: Not reqd | Completion date: October 20, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Water bureau review | Permit status: Not reqd | Completion date: November 2, 2015 | Permit id: 2015-253278-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Permit type: Issuance | Permit status: Approved | Completion date: January 13, 2016 | Permit id: 2015-253278-000 | |||||
New supply air duct from existing duct system to workout room, plans w co Permit type: Intake | Permit status: Closed | Completion date: October 20, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct system to workout room, plans w co Permit type: Process management | Permit status: Closed | Completion date: December 18, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct system to workout room, plans w co Permit type: Mechanical review | Permit status: Approved | Completion date: December 22, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct system to workout room, plans w co Permit type: Fire bureau | Permit status: Not reqd | Completion date: October 29, 2015 | Permit id: 2015-253286-000 | |||||
New supply air duct from existing duct system to workout room, plans w co Permit type: Issuance | Permit status: Closed | Completion date: January 13, 2016 | Permit id: 2015-253286-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Application | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Application | Permit status: Manually verified | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Issuance/intake | Permit status: Intake | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Process management | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Addressing | Permit status: Not reqd | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Planning and zoning | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Erosion control | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Site development | Permit status: Not reqd | Completion date: March 21, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Life safety | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Life safety | Permit status: Not reqd | Completion date: March 16, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Structural | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Fire bureau | Permit status: Approved | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Environmental services | Permit status: Not reqd | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Transportation | Permit status: Not reqd | Completion date: March 11, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 14, 2016 | Permit id: 2016-114052-000 | |||||
T-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Permit type: Water bureau review | Permit status: Not reqd | Completion date: March 15, 2016 | Permit id: 2016-114052-000 | |||||
Adjustment request to exempt nonconforming upgrades Permit type: Land use review | Permit status: Completed | Completion date: March 29, 2016 | Permit id: 2016-141315-000 | |||||
State epermit 59000-bel-12-00248: data catvfaxed Date: April 26, 2012Permit type: Administration | Permit status: Closed | Completion date: April 26, 2012 | Permit id: 2012-134858-000 | |||||
State epermit 59000-bel-12-00488: speaker and a v installfaxed Date: August 1, 2012Permit type: Process management | Permit status: Closed | Completion date: July 26, 2012 | Permit id: 2012-165833-000 | |||||
State epermit 59000-bel-13-00162: a v install in multiple conference rooms. Includes tv, speakers and necessary wiring. Faxed Date: March 20, 2013Permit type: Administration | Permit status: Closed | Completion date: March 20, 2013 | Permit id: 2013-129857-000 | |||||
4-t gas pack, 5 type 2 hood, 12 type 1 hood, fire wrap, refrigeration, mua via gas packs interlocked w efs, plans w co Date: June 22, 2015Permit type: Intake | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2015-143111-000 | |||||
Two 5 cfm 8 kw electric heat fan coils (no cooling), plans w co Date: June 10, 2015Permit type: Intake | Permit status: Closed | Completion date: April 14, 2015 | Permit id: 2015-147033-000 | |||||
Replace existing registers and ductwork to accomodate new layout, 1-ton ductless split, plans w co Date: June 5, 2015Permit type: Intake | Permit status: Closed | Completion date: April 14, 2015 | Permit id: 2015-147053-000 | |||||
Replace existing registers and ductwork to accomodate new office remodel, plans w co Date: June 19, 2015Permit type: Intake | Permit status: Closed | Completion date: April 24, 2015 | Permit id: 2015-154527-000 | |||||
Reconfigure existing ductwork to accomodate remodel, plans w co Date: June 19, 2015Permit type: Intake | Permit status: Approved | Completion date: April 29, 2015 | Permit id: 2015-161450-000 | |||||
Reconfigure existing ductwork, grilles, and resters to accomodate new office layout, plans w co Date: June 29, 2015Permit type: Intake | Permit status: Closed | Completion date: May 6, 2015 | Permit id: 2015-165719-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Approved | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Sprinkler - relocate existing sprinkler lines and heads for new dorm rooms in tenant remodel Permit type: Intake | Permit status: Closed | Completion date: May 18, 2015 | Permit id: 2015-172253-000 | |||||
Two 12 type 1 hoods, one new heated mau w mod interlocked w efs, structural details attached Date: July 2, 2015Permit type: Intake | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-194113-000 | |||||
Sprinklers-add relocate existing sprinklers for new wall ceilings-add dry valve to cover front canopies & exterior freezer. Date: August 6, 2015Permit type: Intake | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-194570-000 | |||||
Addition to locker rooms - chiles center Date: March 29, 2006Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: August 16, 2006 | Current use: Assembly | Permit id: 2005-182915-000 | |||||
Replace windows, new front stairs to be poured over the existing stairs , lower than 30" above grade. Date: November 17, 2006Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: August 21, 2007 | Current use: Educational | Permit id: 2006-177486-000 | |||||
30,0 addition and interior remodel of existing engineering building. (see 07-178453-dmo-01-co for partial demolition) Date: March 20, 2008Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: July 9, 2009 | Current use: Educational | Permit id: 2007-178453-000 | |||||
Renovate dormitory building - new dropped ceiling; upgrade et, mt, pt, systems Date: May 13, 2008Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: September 19, 2008 | Current use: Apartments/condos (3 or more units) | Permit id: 2008-122227-000 | |||||
13,8 sf addition to commons building Date: December 5, 2008Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: October 22, 2009 | Current use: Assembly | Permit id: 2008-150300-000 | |||||
New 95 tall bell tower Date: January 8, 2009Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Under inspection | Current use: Educational | Permit id: 2008-170321-000 | |||||
New ceiling system, lighting and sound system Date: November 29, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: March 10, 2011 | Current use: Assembly | Permit id: 2010-191018-000 | |||||
Interior alteration to existing dining hall Date: May 7, 2010Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: September 9, 2010 | Current use: Assembly | Permit id: 2010-116004-000 | |||||
New 392 sf unheated storage shed Date: March 3, 2011Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: February 2, 2012 | Current use: Storage | Permit id: 2010-197470-000 | |||||
Solar pv panel solar, 5. 5 kw photovoltaic solar installation Date: February 2, 2011Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: July 1, 2011 | Current use: Assembly | Permit id: 2011-102685-000 | |||||
Add two antennas inside new faux stacks Date: November 30, 2011Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: June 11, 2013 | Current use: Utility | Permit id: 2011-172468-000 | |||||
Renovate library - remodel and reconfigure all floors; seisimic upgrade; re-roof; new entry; cantilever 1st floor bay window Date: May 25, 2012Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: October 4, 2013 | Current use: Business | Permit id: 2012-114845-000 | |||||
Remove and replace interior doors, finishes, ceilings and lighting in existing classroom and corridor Date: December 12, 2012Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 11, 2013 | Current use: Educational | Permit id: 2012-201563-000 | |||||
Additions and alterations of locker rooms, restrooms and training rooms Date: May 1, 2012Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: February 20, 2013 | Current use: Assembly | Permit id: 2012-114832-000 | |||||
Replace all existing exterior windows; renovate common bathrooms throughout building; convert unisex bathtroom to separate male and female bathrooms; reconfigure existing common kitchenette in basement; reconfigure existing kitchen on first floor; rooftop mechanical (see 12-126007-mt) Date: May 10, 2012Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: August 23, 2012 | Current use: Apartments/condos (3 or more units) | Permit id: 2012-125996-000 | |||||
New 242 sf open shelter Date: May 31, 2012Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Final | Completion date: June 14, 2013 | Current use: Business | Permit id: 2012-126032-000 | |||||
Battery back up addition for existing rooftop equipment; add (2) te- bbu battery cabinet; add (40) marathon 155 ft batteries Date: January 22, 2013Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: October 1, 2013 | Current use: Utility | Permit id: 2012-212383-000 | |||||
Add new ticket window to existing ticket booth operation in exsiting cmu wall; build steel frame to support cmu Date: August 21, 2013Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: October 14, 2013 | Current use: Assembly | Permit id: 2013-195848-000 | |||||
Replacement of baseball field turf with new artifical turf with vertical drainage system, and replacement of existing fence 4-25, two foul poles at 30. Note: no changes to field lighting without conditional use review. Jmr Date: July 21, 2014Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: March 5, 2015 | Current use: Utility | Permit id: 2014-154420-000 | |||||
Reconfigure walls at second floor to create b occupancy work out room (733 sf), media room (6 sf) and storage area at north end of building Date: July 8, 2016Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: November 4, 2016 | Current use: Assembly | Permit id: 2015-253278-000 | |||||
Install (8) antennas, rrus, cabinets, new shroud, surge protectors behind rooftop shroud. Mehling hall Date: December 20, 2016Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Issued | Current use: Utility | Permit id: 2016-163410-000 | |||||
Alterations to the existing acute care lab in the school of nursing; remove casework; removing a wall; and add three simulation bays; no exterior work Date: November 4, 2016Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: January 24, 2017 | Current use: Business | Permit id: 2016-254709-000 | |||||
Buckley center t-mobile proposes to remove (3) existing antennas and add (3) new antennas and related ancillary equipment. Total antenna count to remain the same. (6) total Date: June 28, 2016Client: North Portland Neighborhood Services | Permit type: Addition | Permit status: Final | Completion date: July 5, 2016 | Current use: Utility | Permit id: 2016-114052-000 | |||||
Add walls and doors to existing workroom to create offices, reception area, and workroom Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Approved to issue | Current use: Business | Permit id: 2016-206472-000 | |||||
Alteration-parking lot planting, add pedestrian walkway, and upgrades to satisfy land use decision lu16-141315ad Date: January 24, 2017Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Issued | Current use: Assembly | Permit id: 2017-109909-000 | |||||
New 31 space parking lot to replace existing gravel lot on university of portland campus near tennis center. Accessible path upgrade. All reviewers - please recheck your fees prior to issue! Date: August 1, 2000Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Issued | Current use: Business | Permit id: 2000-140823-000 | |||||
Safety improvements to existing catwalk in dramatic arts laboratory in mago hunt center - inclusive of 5 sf Date: February 7, 2001Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: August 8, 2001 | Current use: Educational | Permit id: 2000-186112-000 | |||||
Area lighting on main u of p campus - lur #98-00812 Date: February 7, 2001Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Issued | Current use: Educational | Permit id: 2000-186122-000 | |||||
Remodel bsmt lounge & 1st floor chapel, add egress lighting in bldg, remove cross-corridor doors, replace clg diffuser grilles Date: May 3, 2001Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: September 28, 2001 | Current use: Business | Permit id: 2000-193934-000 | |||||
Add new partition walls 8 high to create a work shop and tool room Date: July 10, 2001Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: September 10, 2001 | Current use: Business | Permit id: 2001-146744-000 | |||||
Ti- remodel service area of cafeteria to add additional pizza kitchen, add third 3 exit door on west side of cafeteria Date: May 8, 2002Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: September 4, 2002 | Current use: Business | Permit id: 2002-114886-000 | |||||
Ti - franz hall; change two open office spaces into ten individual offices maintain fully sprinkled under separate permit from fire marshals office. Date: April 16, 2003Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: June 27, 2003 | Current use: Educational | Permit id: 2003-115609-000 | |||||
Replacing 3 antennas with 12 panel antennas Date: August 25, 2004Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2004-027542-000 | |||||
New batting cage building - located between baseball field and chiles center (to replace non-enclosed cage) 10-18-04 moore; Date: December 30, 2004Client: North Portland Neighborhood Services | Permit type: New construction | Permit status: Under inspection | Current use: Educational | Permit id: 2004-047767-000 | |||||
Convert 4 dormitory rooms to church w n mehling hall. No seismic upgrade at this time less than 1 3 of the building and only adding 54 occupants to this building. Date: October 18, 2005Permit type: Alteration | Permit status: Final | Completion date: May 16, 2006 | Current use: Assembly | Permit id: 2005-167103-000 | |||||
Place 2 panel antennas on roof with equipment to be placed within rooftop storage room see lur 05-144677-cu Date: March 31, 2006Permit type: Alteration | Permit status: Final | Completion date: July 26, 2006 | Current use: Utility | Permit id: 2005-179218-000 | |||||
2nd floor - add walls to create office space; 3rd floor- remove walls to create reception area, conference room, reconfigure office space; 5th floor - relocate kitchen and reconfigure office space Date: June 5, 2006Permit type: Alteration | Permit status: Final | Completion date: September 20, 2006 | Current use: Educational | Permit id: 2006-129244-000 | |||||
Antenna attachment on penthouse of buckley center bldg., equipment shelter on roof Date: December 14, 2006Permit type: Alteration | Permit status: Final | Completion date: February 21, 2007 | Current use: Business | Permit id: 2006-161136-000 | |||||
Create new data rooms in basement, first floor and third floor, suspended acoustical ceiling in corridors on all four floors Date: June 13, 2007Permit type: Alteration | Permit status: Final | Completion date: August 21, 2007 | Current use: Apartments/condos (3 or more units) | Permit id: 2007-126515-000 | |||||
Modify existing concessions and add mens and womens restrooms within the existing soccor complex Date: June 21, 2007Permit type: Alteration | Permit status: Final | Completion date: October 11, 2007 | Current use: Assembly | Permit id: 2007-127067-000 | |||||
Interior alterations for civil engineering labs in existing storage space Date: December 10, 2007Client: North Portland Neighborhood Services | Permit type: Alteration | Permit status: Final | Completion date: February 21, 2008 | Current use: Business | Permit id: 2007-169918-000 | |||||
02 13 08 dc original permit no. 07-1817 install foundation and slab to support the future installation of a walk-in cooler. Cut new egress door to access cooler from existing building. Fencing to enclose future installation of compressors and trash area. Pre-fabricated cooler and mechanical will be submitted under separate permit. Date: December 10, 2007Permit type: Alteration | Permit status: Final | Completion date: May 19, 2008 | Current use: Educational | Permit id: 2007-181730-000 | |||||
Build interior partitions temporary offices (related to 07-178453-co engineering building addition) Date: January 8, 2008Permit type: Alteration | Permit status: Final | Completion date: February 21, 2008 | Current use: Educational | Permit id: 2007-180859-000 | |||||
Add two antennas, in canisters, to existing array, one radio cabinet all on roof Date: November 17, 2008Permit type: Alteration | Permit status: Final | Completion date: December 30, 2008 | Current use: Business | Permit id: 2008-155071-000 | |||||
First floor: new finishes in commons room, convert 3 sleeping rooms into single apartment. Floors 1 - 4: accessibility upgrade 2 washrooms, replace all lavs at each dorm room.. Date: April 30, 2008Permit type: Alteration | Permit status: Final | Completion date: September 8, 2008 | Current use: Apartments/condos (3 or more units) | Permit id: 2008-118673-000 | |||||
Villa maria - remodel common restrooms, suites, kitchen, lounge, room 101, reception desk; replace windows; update plumbing Date: May 26, 2009Permit type: Alteration | Permit status: Final | Completion date: August 27, 2009 | Current use: Apartments/condos (3 or more units) | Permit id: 2009-122080-000 | |||||
Install 6 panel antennas, 6 dap panels, and 3 microwave antennas on the side of the existing mechanical penthouses on roof of buckley center dorm. Install cabinet inside existing penthouse Date: December 8, 2009Permit type: Alteration | Permit status: Final | Completion date: January 12, 2010 | Current use: Utility | Permit id: 2009-157088-000 | |||||
Interior demolition of casework and partition wall in open office suite for addition of wall to reconfigure office suite Date: November 18, 2011Permit type: Alteration | Permit status: Final | Completion date: January 10, 2012 | Current use: Educational | Permit id: 2011-194156-000 | |||||
Reconfigure existing office space in buckley center, 3rd floor, suite 301. Date: May 3, 2011Permit type: Alteration | Permit status: Final | Completion date: August 1, 2011 | Current use: Business | Permit id: 2011-136481-000 | |||||
Voluntary seismic upgrade to an existing 8-story dormitory to include masonry veneer anchorage and repair, and infill of one window on the first northeast elevation. Date: May 20, 2016Permit type: Alteration | Permit status: Issued | Current use: Assembly | Permit id: 2016-165243-000 | |||||
Add interior window and door in existing 1 hr corridor wall (door frame existing), add coounter under window. Date: June 17, 2016Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2016-189601-000 |