| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F5/ suite 1225 interior demo and new stair enclosure at 12 th floor adjacent to suite 1225 Date: January 30, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 30, 2015 | Permit id: 2015-112497-000 | |||||
Plumbing renovation at yeon building suite 1225break sink Date: May 19, 2015Permit type: Intake | Permit status: Closed | Completion date: February 7, 2015 | Permit id: 2015-116357-000 | |||||
F21/ 7th floor - create two private offices Date: February 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: February 11, 2015 | Permit id: 2015-118365-000 | |||||
Power - suite 1225 interior demo and new stair enclosure at 12 th floor adjacent to suite 1225 Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: February 13, 2015 | Permit id: 2015-119282-000 | |||||
B2/ 522 sw 5th; modifications for future tenant, ada improvements in restroom, flooring, glazing at conference room wall, ceiling, elec, plbg, finishes Date: May 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 20, 2015 | Permit id: 2015-173369-000 | |||||
Power - 5th floor; modifications for future tenant, ada improvements in restroom, flooring, glazing at conference room wall, ceiling, elec, plbg, finishes Date: May 20, 2015Permit type: Intake | Permit status: Closed | Completion date: May 20, 2015 | Permit id: 2015-173638-000 | |||||
Plumbing renovation at yeon building 5th floor2 ada restrooms Date: May 27, 2015Permit type: Intake | Permit status: Closed | Completion date: May 21, 2015 | Permit id: 2015-174266-000 | |||||
Mohr ip law #13 - fire alarm circuit Date: May 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 22, 2015 | Permit id: 2015-174912-000 | |||||
Fire alarm - mohr ip law #13 - fire alarm circuit Date: May 22, 2015Permit type: Intake | Permit status: Closed | Completion date: May 22, 2015 | Permit id: 2015-174917-000 | |||||
B2/ 12th floor, ste 1225 spec ti - add several walls and panels, remove abandoned waste pipe and vents, new paint, ceiling, fixtures Date: May 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 27, 2015 | Permit id: 2015-176468-000 | |||||
Suite #1390- alteration to the fire alarm as needed for t. I. 4 strobes total Date: May 29, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177652-000 | |||||
Power, fire alarm - 12th floor, ste 1225 white box - add several walls and panels, remove abandoned waste pipe and vents, new paint, ceiling, fixtures Date: June 9, 2015Permit type: Intake | Permit status: Closed | Completion date: May 29, 2015 | Permit id: 2015-177758-000 | |||||
Plumbing renovation at yeon building for white box tibreak sink Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-178985-000 | |||||
5th floor- add and relocate sprinklers to accommodate remodel- 52 heads total Date: June 4, 2015Permit type: Intake | Permit status: Closed | Completion date: June 3, 2015 | Permit id: 2015-179953-000 | |||||
12th floor, ste 1225-add & relocate sprinkler to accommodate new wall & ceilings. Date: June 10, 2015Permit type: Intake | Permit status: Closed | Completion date: June 5, 2015 | Permit id: 2015-181441-000 | |||||
Suite #1225-alarm - install new ada synchronized notification devices in ti space- 3 h/s total Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190971-000 | |||||
F13/ 2nd floor conducive ti remodel. Date: January 23, 2012Permit type: Intake | Permit status: Closed | Completion date: January 12, 2012 | Permit id: 2012-103296-000 | |||||
F13/rev-01 add 3rd fl, partial t. I. And connecting stair to second floor. Date: March 19, 2012Permit type: Intake | Permit status: Closed | Completion date: February 15, 2012 | Permit id: 2012-103296-Rev | |||||
F13/ 2nd & 3rd floor 8 new wshps for conducive ti remodel Date: May 4, 2012Permit type: Intake | Permit status: Closed | Completion date: March 12, 2012 | Permit id: 2012-119578-000 | |||||
B1/ 10th floor multnomah defenders ti fire shutter actuation per fm alarm permit note: final fire marshall approved by jeff galvan on 9/4/12. Date: June 12, 2012Permit type: Intake | Permit status: Closed | Completion date: June 1, 2012 | Permit id: 2012-146314-000 | |||||
B1/ suite 13 patenaude & felix ti Date: June 15, 2012Permit type: Intake | Permit status: Closed | Completion date: June 13, 2012 | Permit id: 2012-150177-000 | |||||
F12/ install new 1 kw genset rooftop generatorper fls upgrade agreement item #1. Agreement dated 8-16-12. See permit # 13-192704-et for electrical. Date: April 9, 2013Permit type: Intake | Permit status: Closed | Completion date: September 25, 2012 | Permit id: 2012-186579-000 | |||||
F10/ 14,15 & 16th floors - rev-01 adding movable wall and minor non ls revisions pae/luma new tenant improvement rev-01 minor changes to ceiling plan, exit signage, ceiling fans, hardware and structural change to floor Date: December 18, 2012Permit type: Intake | Permit status: Closed | Completion date: December 4, 2012 | Permit id: 2012-189151-Rev | |||||
B1/ 10th floor multnomah defenders office expansion to adjacent space Date: December 10, 2012Permit type: Intake | Permit status: Closed | Completion date: November 30, 2012 | Permit id: 2012-210318-000 | |||||
10th floor multnomah defenders office expansion to adjacent spacepr# 12-237 (power, fire alarm) Date: December 3, 2012Permit type: Intake | Permit status: Closed | Completion date: December 3, 2012 | Permit id: 2012-210667-000 | |||||
F13/ pae exercise room - new entry from basement elevator-lobby, remodel toilet room and add new shower and 2hr fire pump room. Sprinkler upgrade area of work and corridor reqd per fls agreement to achieve non rated corridors Date: January 28, 2013Permit type: Intake | Permit status: Closed | Completion date: January 23, 2013 | Permit id: 2013-108135-000 | |||||
F2/ install heat recovery ventilator for basement exercise room, fsds Date: February 11, 2013Permit type: Intake | Permit status: Closed | Completion date: February 4, 2013 | Permit id: 2013-112382-000 | |||||
F14/ 3rd floor flightstats expansion to remaining space on 3rd floor Date: February 13, 2013Permit type: Intake | Permit status: Closed | Completion date: February 11, 2013 | Permit id: 2013-114897-000 | |||||
3rd floor flightstats expansion to remaining space on 3rd floorpr# fltstats-300 Date: February 22, 2013Permit type: Intake | Permit status: Closed | Completion date: February 14, 2013 | Permit id: 2013-116406-000 | |||||
B2/ reinstall 8 wshp with new duct work and grilles, reconfigure water piping to wshps Date: March 12, 2013Permit type: Intake | Permit status: Closed | Completion date: February 25, 2013 | Permit id: 2013-119884-000 | |||||
3rd floor flightstats expansion to remaining space on 3rd floorcontrol wiring for 8 whsp with stand alone thermostatspr# fltstats-300 Date: February 26, 2013Permit type: Intake | Permit status: Closed | Completion date: February 26, 2013 | Permit id: 2013-120008-000 | |||||
Install fire evacuation alarm speaker/strobes and smoke detectors per plan. Application and 2 sets of plans and calcs recd. Date: February 28, 2013Permit type: Intake | Permit status: Closed | Completion date: February 27, 2013 | Permit id: 2013-121234-000 | |||||
Complaint recd: construction going on at 4 & 5 a. M.--putting in new sheetrock, cutting cement, throwing debris into dumpster. Permit type: Request | Permit status: Closed | Completion date: March 4, 2013 | Permit id: 2013-122667-000 | |||||
Complaint recd: construction going on at 4 & 5 a. M.--putting in new sheetrock, cutting cement, throwing debris into dumpster. Permit type: Request | Permit status: Closed | Completion date: September 26, 2014 | Permit id: 2013-122667-000 | |||||
Install new panel feeders and take them off the old big red service Date: March 13, 2013Permit type: Intake | Permit status: Closed | Completion date: March 5, 2013 | Permit id: 2013-122932-000 | |||||
Suite 705 new walls to create 2 new offices (add new outlet and switch for sign lighting in conference room)pr# yeon - ste 705 Date: August 2, 2013Permit type: Intake | Permit status: Closed | Completion date: August 2, 2013 | Permit id: 2013-188092-000 | |||||
Install fire alarms per plans Date: August 9, 2013Permit type: Intake | Permit status: Closed | Completion date: August 9, 2013 | Permit id: 2013-190991-000 | |||||
F11/ 4th floor interior demo of all tenant improvements Date: December 11, 2013Permit type: Intake | Permit status: Closed | Completion date: December 3, 2013 | Permit id: 2013-234073-000 | |||||
F11/ fire pump to emergency generator connection via stair penetrations for conduit see building code appeal #10208 note: electrical permit is commercial permit #13-122932et. Date: December 19, 2013Permit type: Intake | Permit status: Closed | Completion date: December 4, 2013 | Permit id: 2013-234417-000 | |||||
Plumbing renovation at yeon building 4th floor demo Date: September 9, 2014Permit type: Intake | Permit status: Closed | Completion date: December 5, 2013 | Permit id: 2013-234785-000 | |||||
Core fire alm upgd 7,8,9 & 11th floors - fire alarm upgradespr# core fa upgrade Date: December 16, 2013Permit type: Intake | Permit status: Closed | Completion date: December 16, 2013 | Permit id: 2013-238287-000 | |||||
B2/ suite 100c; remove steel mezzanine and hangers, grind 2 off concrete floor, float in gypcrete for level surface, patch and paint, elec,. No occupancy with this permit. Obtain an occupancy permit for t. I. When ready to proceed with interior finishes. Date: January 8, 2014Permit type: Intake | Permit status: Closed | Completion date: December 31, 2013 | Permit id: 2013-243328-000 | |||||
Suite 100c; remove steel mezzanine and hangers, grind 2 off concrete floor, float in gypcrete for level surface, patch and paint, elec,. No occupancy with this permit. Obtain an occupancy permit for t. I. When ready to proceed with interior finishes. Pr# yeon 100c retail she Date: January 13, 2014Permit type: Intake | Permit status: Closed | Completion date: December 31, 2013 | Permit id: 2013-243419-000 | |||||
Fire escape testing for certification Permit type: Application | Permit status: Approved | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Issuance/intake | Permit status: Intake | Completion date: May 19, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Process management | Permit status: Closed | Completion date: July 25, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Planning and zoning | Permit status: Not reqd | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Site development | Permit status: Not reqd | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Life safety | Permit status: Not reqd | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Structural | Permit status: Approved | Completion date: July 28, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Structural | Permit status: Required | Completion date: July 28, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Fire bureau | Permit status: Approved | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Transportation | Permit status: Not reqd | Completion date: May 9, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Water bureau review | Permit status: Not reqd | Completion date: May 19, 2014 | Permit id: 2014-154813-000 | |||||
Fire escape testing for certification Permit type: Permit expiration | Permit status: Batch expired | Completion date: July 2, 2015 | Permit id: 2014-154813-000 | |||||
F3/ 9th floor; hallway renovation, add stair enclosure, doors, remove some walls, new flooring, ceiling, elec, plbg. Date: July 21, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 21, 2014 | Permit id: 2014-187284-000 | |||||
F16/ 5th floor interior demo for future new tenant Date: July 28, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 28, 2014 | Permit id: 2014-189940-000 | |||||
F2/ suite 400; ti, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: August 1, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 1, 2014 | Permit id: 2014-192412-000 | |||||
F3/ suite 400; metal toad, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: September 12, 2014Permit type: Intake | Permit status: Closed | Completion date: August 1, 2014 | Permit id: 2014-192426-000 | |||||
Power, fire alarm - 9th floor; hallway renovation, add stair enclosure, doors, remove some walls, new flooring, ceiling, elec, plbg. Date: September 15, 2014Permit type: Intake | Permit status: Closed | Completion date: August 2, 2014 | Permit id: 2014-192805-000 | |||||
Power - 5th floor interior demo for future new tenant Date: September 16, 2014Permit type: Intake | Permit status: Closed | Completion date: August 4, 2014 | Permit id: 2014-193279-000 | |||||
F2/ suite 1250; ti, remove some walls, cabinetry, doors, add wall to create additional office, door, relite, ceiling, elec Date: August 5, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 5, 2014 | Permit id: 2014-193486-000 | |||||
Plumbing renovation at yeon building suite 4 for metal toad tiada rr, breakroom Date: August 18, 2014Permit type: Intake | Permit status: Closed | Completion date: August 15, 2014 | Permit id: 2014-199489-000 | |||||
Power, fire alarm - suite 1250; ti, remove some walls, cabinetry, doors, add wall to create additional office, door, relite, ceiling, elec Date: August 19, 2014Permit type: Intake | Permit status: Closed | Completion date: August 19, 2014 | Permit id: 2014-200279-000 | |||||
Fire sprinkler - tenant improvement - second and third floorsreceived 3 cut sheets, 3 sets of plans Date: August 22, 2014Permit type: Intake | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-201192-000 | |||||
Power, fire alarm - suite 400; metal toad, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: September 11, 2014Permit type: Intake | Permit status: Closed | Completion date: August 22, 2014 | Permit id: 2014-201901-000 | |||||
Suite #1250- alterations to fire alarm system as needed for t. I.- 5 s/s total Date: September 11, 2014Permit type: Intake | Permit status: Closed | Completion date: September 11, 2014 | Permit id: 2014-211319-000 | |||||
B2/ 4th flr, new wshps, grds, t-stats, ducting, full floor hydronics Date: October 16, 2014Permit type: Intake | Permit status: Closed | Completion date: September 15, 2014 | Permit id: 2014-213052-000 | |||||
Hvac stat - suite 400; metal toad, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: October 17, 2014Permit type: Intake | Permit status: Closed | Completion date: September 16, 2014 | Permit id: 2014-213188-000 | |||||
Suite #400- alterations to the fire alarm system as needed for t. I.- devices total 5- smoke detectors15- s/s Date: September 16, 2014Permit type: Intake | Permit status: Closed | Completion date: September 16, 2014 | Permit id: 2014-213520-000 | |||||
F4/ suite 925; ti, remove most walls, doors, cabinety, create open office space, add wall, door, relite, for break room, infill door in conference room, ceiling, elec, plbg Date: September 22, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-215833-000 | |||||
Plumbing renovation at yeon building 9th floor for gbmo tibreakroom sink Date: October 31, 2014Permit type: Intake | Permit status: Closed | Completion date: September 24, 2014 | Permit id: 2014-217240-000 | |||||
Voice/data - suite 1250; ti, remove some walls, cabinetry, doors, add wall to create additional office, door, relite, ceiling, elec Date: September 26, 2014Permit type: Intake | Permit status: Closed | Completion date: September 26, 2014 | Permit id: 2014-217977-000 | |||||
Power - suite 925; ti, remove most walls, doors, cabinety, create open office space, add wall, door, relite, for break room, infill door in conference room, ceiling, elec, plbg Date: October 28, 2014Permit type: Intake | Permit status: Closed | Completion date: September 27, 2014 | Permit id: 2014-218538-000 | |||||
Plumbing renovation at yeon buiiolding for metal toad ticondensate drains for air handlers Date: September 29, 2014Permit type: Intake | Permit status: Closed | Completion date: September 29, 2014 | Permit id: 2014-218722-000 | |||||
Plumbing renovation at yeon building suite 925breakroom sink Date: October 1, 2014Permit type: Intake | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2014-220181-000 | |||||
Suite #925- alteration to fire sprinklers as needed for t. I.- 14 heads total Date: October 3, 2014Permit type: Intake | Permit status: Closed | Completion date: October 3, 2014 | Permit id: 2014-221222-000 | |||||
F4/ suite 925 - new ductwork on existing units Date: October 15, 2014Permit type: Intake | Permit status: Closed | Completion date: October 6, 2014 | Permit id: 2014-221756-000 | |||||
Voice/data - suite 400; metal toad, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: October 14, 2014Permit type: Intake | Permit status: Closed | Completion date: October 14, 2014 | Permit id: 2014-225218-000 | |||||
Suite #925- alerations to the fire alarm system as needed for t. I.- 2 strobes total Date: October 16, 2014Permit type: Intake | Permit status: Closed | Completion date: October 16, 2014 | Permit id: 2014-226722-000 | |||||
Security - suite 400; metal toad, new walls for multiple team rooms, refuge rooms, create open work space, conference room, lounge/break room, lobby, remodel restrooms to ada compliance, ceiling, elec, plbg, finishes Date: October 17, 2014Permit type: Intake | Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227149-000 | |||||
Voice/data - suite 925; ti, remove most walls, doors, cabinety, create open office space, add wall, door, relite, for break room, infill door in conference room, ceiling, elec, plbg Date: October 31, 2014Permit type: Intake | Permit status: Closed | Completion date: October 28, 2014 | Permit id: 2014-231268-000 | |||||
B1/demo atm closet, replace metal panels panels with glass, return to vacant shell. Date: October 2, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 2, 2015 | Permit id: 2015-245589-000 | |||||
B1/demo atm closet, replace metal panels panels with glass, return to vacant shell, elec. Date: October 12, 2015Permit type: Intake | Permit status: Closed | Completion date: October 2, 2015 | Permit id: 2015-245593-000 | |||||
Fire escape certification Date: November 4, 2015Permit type: Application | Permit status: Approved | Completion date: October 5, 2015 | Permit id: 2015-246195-000 | |||||
B1/spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: November 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-266388-000 | |||||
F22/martin allen suite 7 t. I. - demon and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: November 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-266679-000 | |||||
F22/martin allen suite 7 t. I. - demo and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: November 20, 2015Permit type: Intake | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-266684-000 | |||||
Power, fire alarm - spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: December 1, 2015Permit type: Intake | Permit status: Closed | Completion date: November 19, 2015 | Permit id: 2015-266995-000 | |||||
Yeon building, suite 710. 1- break sink, 1- dishwasher. Date: November 25, 2015Permit type: Intake | Permit status: Closed | Completion date: November 23, 2015 | Permit id: 2015-268789-000 | |||||
Plumbing renovation at yeon building suite 1300sink and dw Date: November 25, 2015Permit type: Intake | Permit status: Closed | Completion date: November 25, 2015 | Permit id: 2015-270042-000 | |||||
Suite #710-martin allen- remove and re-install sprinklers to accommodate remodel- heads total Date: December 3, 2015Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-270437-000 | |||||
Power, fire alarm - martin allen suite 7 t. I. - demo and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: December 1, 2015Permit type: Intake | Permit status: Closed | Completion date: December 1, 2015 | Permit id: 2015-271108-000 | |||||
Suite #710- alteration to fire alarm system as needed for t. I.- 2- speaker/strobes total Date: December 3, 2015Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2015-272787-000 | |||||
Spec suite 1300-remove and re-install sprinklers to accommodate remodel Date: December 10, 2015Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-274990-000 | |||||
Suite #1300- alterations to the fire alarm system as needed for t. I.- 3- s/s total Date: December 9, 2015Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-275267-000 | |||||
F9/ martin allen - ste 7 - new water source heat pumps and associated ductwork and controls for tenant improvement Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280296-000 | |||||
F14/ ste 13 spec ti - new water source heat pumps with associated ductwork and controls for tenant improvement Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280323-000 | |||||
Hvac stat - martin allen suite 7 t. I. - demo and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: January 11, 2016Permit type: Intake | Permit status: Closed | Completion date: January 11, 2016 | Permit id: 2016-103631-000 | |||||
Hvac stat - spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: January 11, 2016Permit type: Intake | Permit status: Closed | Completion date: January 11, 2016 | Permit id: 2016-103637-000 | |||||
B2/enlarge electrical closets for new electrical panels on floors 7 through 13, elec Date: January 25, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2016-110507-000 | |||||
Voice/data - spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111605-000 | |||||
Power - enlarge electrical closets for new electrical panels on floors 7 through 13, elec Date: February 2, 2016Permit type: Intake | Permit status: Closed | Completion date: February 2, 2016 | Permit id: 2016-115018-000 | |||||
F17/ 522 sw 5th; 5th floor ti; walls, doors, for breakout rooms, breakroom, call rooms, storage, open office, flooring, ceiling, elec, plbg Date: April 4, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-144706-000 | |||||
B1/sage view suite 1225 t. I.-add (3) offices and conference room, relite, ceilings, elec Date: April 6, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-146309-000 | |||||
Power - sage view suite 1225 t. I.-add (3) offices and conference room, relite, ceilings, elec Date: April 14, 2016Permit type: Intake | Permit status: Closed | Completion date: April 6, 2016 | Permit id: 2016-146622-000 | |||||
Power - 522 sw 5th; 5th floor ti; walls, doors, for breakout rooms, breakroom, call rooms, storage, open office, flooring, ceiling, elec, plbg Date: April 20, 2016Permit type: Intake | Permit status: Closed | Completion date: April 12, 2016 | Permit id: 2016-150356-000 | |||||
5th floor- install new ada synchronized notification devices as needed for t. I. 14- s/s Date: April 20, 2016Permit type: Intake | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-152915-000 | |||||
Plumbing renovation at yeon building 5th floor for womply ti1-sink, 1-dw, 4-wc, 1-uri, 4-lav, 1-refrig Date: April 19, 2016Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155036-000 | |||||
B2/ install 7 new wshps, associated ductwork and controls Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155989-000 | |||||
Ti - to reconfigure space on 3rd floor to add 2 new offices, including new restrooms, new kitchenettes, common hallway for access. No exterior work. Date: March 1, 2013Permit type: Application | Permit status: Approved | Completion date: February 27, 2013 | Permit id: 2013-120872-000 | |||||
Complaint received: 3rd floor of office building converted to short-term rental, www. Airbnb. Com/rooms/1733296. 3rd floor had office remodel completed under 13-120872-co, but this did not approve these spaces as sleeping rooms or guest lodging rooms. Change of use, possible occupancy change, required. Date: February 5, 2015Permit type: Enforcement | Permit status: Closed | Completion date: February 20, 2016 | Permit id: 2014-248456-000 | |||||
Plumbing renovation at yeon building for white box tibreak sink Date: January 22, 2016Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-178985-000 | |||||
Remove washer box on 3rd floor to address part of violation issues for 15-116423 al Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198363-000 | |||||
Remove dryer vent on 3rd floor to address vi case issues Date: July 8, 2015Permit type: Intake | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-198367-000 | |||||
B1 demo atm closet, replace metal panels panels with glass, return to vacant shell. Date: October 2, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 2, 2015 | Permit id: 2015-245589-000 | |||||
B1 demo atm closet, replace metal panels panels with glass, return to vacant shell, elec. Date: October 12, 2015Permit type: Intake | Permit status: Closed | Completion date: October 2, 2015 | Permit id: 2015-245593-000 | |||||
B1 spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: November 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-266388-000 | |||||
F22 martin allen suite 7 t. I. - demon and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: November 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-266679-000 | |||||
F22 martin allen suite 7 t. I. - demo and install new partition walls to create (2) offices and (1) conference room, breakroom, casework, relites, ceilings, plbg, elec Date: November 20, 2015Permit type: Intake | Permit status: Closed | Completion date: November 18, 2015 | Permit id: 2015-266684-000 | |||||
Suite #710- alteration to fire alarm system as needed for t. I.- 2- speaker strobes total Date: December 3, 2015Permit type: Intake | Permit status: Closed | Completion date: December 3, 2015 | Permit id: 2015-272787-000 | |||||
Suite #1300- alterations to the fire alarm system as needed for t. I.- 3- s s total Date: December 9, 2015Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-275267-000 | |||||
F9 martin allen - ste 7 - new water source heat pumps and associated ductwork and controls for tenant improvement Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280296-000 | |||||
F14 ste 13 spec ti - new water source heat pumps with associated ductwork and controls for tenant improvement Date: December 29, 2015Permit type: Intake | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-280323-000 | |||||
B2 enlarge electrical closets for new electrical panels on floors 7 through 13, elec Date: January 25, 2016Permit type: Reviews | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2016-110507-000 | |||||
Voice data - spec suite 13 - demo and install partition walls to add conference room, (3) offices and breakroom, ceilings, relite, plbg, elec Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-111605-000 | |||||
F17 522 sw 5th; 5th floor ti; walls, doors, for breakout rooms, breakroom, call rooms, storage, open office, flooring, ceiling, elec, plbg Date: April 4, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 4, 2016 | Permit id: 2016-144706-000 | |||||
B1 sage view suite 1225 t. I.-add (3) offices and conference room, relite, ceilings, elec Date: April 6, 2016Permit type: Reviews | Permit status: Approved | Completion date: April 6, 2016 | Permit id: 2016-146309-000 | |||||
5th floor- install new ada synchronized notification devices as needed for t. I. 14- s s Date: April 20, 2016Permit type: Intake | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-152915-000 | |||||
B2 install 7 new wshps, associated ductwork and controls Permit type: Intake | Permit status: Closed | Completion date: April 19, 2016 | Permit id: 2016-155989-000 | |||||
Complaint received: 3rd floor of office building converted to short-term rental, www. Airbnb. Com rooms 1733296. 3rd floor had office remodel completed under 13-120872-co, but this did not approve these spaces as sleeping rooms or guest lodging rooms. Change of use, possible occupancy change, required. Date: February 5, 2015Permit type: Enforcement | Permit status: Closed | Completion date: February 20, 2016 | Permit id: 2014-248456-000 | |||||
F5 suite 1225 interior demo and new stair enclosure at 12 th floor adjacent to suite 1225 Date: February 17, 2015Permit type: Intake | Permit status: Closed | Completion date: January 30, 2015 | Permit id: 2015-112499-000 | |||||
B2 522 sw 5th; modifications for future tenant, ada improvements in restroom, flooring, glazing at conference room wall, ceiling, elec, plbg, finishes Date: May 20, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 20, 2015 | Permit id: 2015-173369-000 | |||||
B2 12th floor, ste 1225 spec ti - add several walls and panels, remove abandoned waste pipe and vents, new paint, ceiling, fixtures Date: May 27, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 27, 2015 | Permit id: 2015-176468-000 | |||||
Suite #1225-alarm - install new ada synchronized notification devices in ti space- 3 h s total Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: June 23, 2015 | Permit id: 2015-190971-000 | |||||
Renovation alteration of existing office bldg -- structural, mechanical, electrical upgrades. Date: August 17, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 3, 2008 | Current use: Business | Permit id: 2006-162387-000 | |||||
Overhead catenary system (ocs) attachment to the 5th avenue building on 5th avenue Date: December 13, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 30, 2008 | Current use: Business | Permit id: 2007-144555-000 | |||||
Ti- 2nd floor, finish 2 bathrooms & add ceiling system for open office. Date: April 24, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 21, 2008 | Current use: Business | Permit id: 2008-122554-000 | |||||
First floor ti Date: June 12, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 5, 2008 | Current use: Business | Permit id: 2008-120200-000 | |||||
Ti for new tenant in existing office space Date: November 17, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 31, 2008 | Current use: Business | Permit id: 2008-176942-000 | |||||
Tenant improvement for new tenant, remove lath and plaster ceiling on 2nd floor and replace with drywall Date: September 22, 2016Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Issued | Current use: Business | Permit id: 2016-246193-000 | |||||
Interior demolition work to make way for future ti, to be applied for soon. Building to be vacant during construction. Date: August 23, 2006Permit type: Alteration | Permit status: Final | Completion date: November 3, 2008 | Current use: Business | Permit id: 2006-156414-000 | |||||
5th floor t. I.- offices Date: September 10, 2008Permit type: Alteration | Permit status: Final | Completion date: October 29, 2008 | Current use: Business | Permit id: 2008-161227-000 | |||||
4th floor t. I.- offices Date: September 10, 2008Permit type: Alteration | Permit status: Final | Completion date: November 21, 2008 | Current use: Business | Permit id: 2008-161222-000 | |||||
New office, tenant improvement Date: February 10, 2009Permit type: Alteration | Permit status: Final | Completion date: April 6, 2009 | Current use: Business | Permit id: 2009-107527-000 | |||||
Ti -10th and 14th floors- ada update of elevators; expand offices on 10th floors, change out lobby doors and open reception area up on 14th floor Date: March 15, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 17, 2001 | Current use: Business | Permit id: 2001-129701-000 | |||||
Ti - walls-6th floor Date: April 12, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 31, 2001 | Current use: Business | Permit id: 2001-134471-000 | |||||
Remodel existing space, 3 additional offices Date: May 10, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: September 3, 2004 | Current use: Business | Permit id: 2004-021213-000 | |||||
New tenant in office space Date: January 12, 2010Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 3, 2010 | Current use: Business | Permit id: 2010-101241-000 | |||||
Ti- 4th floor-remove add partition walls for full floor tenant, upgrade egress lighting Date: March 8, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 3, 2002 | Current use: Business | Permit id: 2002-110258-000 |