ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Public row (restoration): complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Date: September 11, 2007Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 254067 | |||||
>>> pre-construction meeting required >> pre-construction meeting required > pre-construction meeting required pre-construction meeting required <<< contact mc. Dps inspector charlie lawson @ 301-370-3687. Install four (4) water & sewer house connections. All work must be in accordance with the approved plans and montgomery countys "1999 specifications for utility construction permit", the montgomery county specifications for "utility patch standard and specifications" dated january 5, 1996 and specific traffic notes provided for this site and as directed by the mcdps inspector in the field. . Restore right of way. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Permittee representative: tony crane @ 301-370-1789. Date: January 21, 2003Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 219697 |