New 134 unit apartment building with retail at ground level and tuck under parking. Date: June 15, 2015Permit type: Application | Permit status: Approved | Completion date: February 18, 2015 | Permit id: 2015-113468-000 | |||||
Sa: 272 of 36 rcp combo main, (approx. D=12. 5) in se division st. Contr shall connect to existing branch per std p-262 (approx l=24 and d=5. 3) 88 from ds smh (abv687). Contractor to verify all depths and locations in field. Contact x37869 Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-187390-000 | |||||
St: 272 of 36 rcp combo main, (approx. D=12. 5) in se division st. Contr shall connect to existing branch per std p-262 (approx l=23 and d=4. 7) 39 from ds smh (abv687). Contractor to verify all depths and locations in field. Contact x37869 Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-187391-000 | |||||
Underground storm, stormwater planter, sanitary and storm connections Date: June 17, 2015Permit type: Intake | Permit status: Closed | Completion date: June 17, 2015 | Permit id: 2015-187407-000 | |||||
Provide complete plumbing system from ground up for the fixtures listed on application Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-195189-000 | |||||
134 unit building. Largest unit is 1091 sqft - oar 918 reduced fees apply only to residential units./ add (3) 601-10 amp svc/fdr & (1) over 10 amp svc/fdr 9/29/15 Date: February 3, 2016Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2015-218525-000 | |||||
Alarm-four story, 134 unit apartments with one commercial space on main floor. Date: October 12, 2015Permit type: Intake | Permit status: Approved | Completion date: September 30, 2015 | Permit id: 2015-244136-000 | |||||
Pbot pw permit Date: December 10, 2015Permit type: Intake pw | Permit status: Assigned | Completion date: December 24, 2014 | Permit id: 2014-253572-000 | |||||
Dfs for storefront system Permit type: Application | Permit status: Approved | Completion date: March 7, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Issuance/intake | Permit status: Intake | Completion date: March 7, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Process management | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Process management | Permit status: Closed | Completion date: April 11, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Planning and zoning | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Life safety | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Structural | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Issuance | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-113468-Dfs | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Application | Permit status: Approved | Completion date: December 2, 2015 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Issuance/intake | Permit status: Intake | Completion date: December 2, 2015 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Process management | Permit status: Closed | Completion date: January 12, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: January 5, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Life safety | Permit status: Approved | Completion date: January 11, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Issuance | Permit status: Approved | Completion date: January 12, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Process management | Permit status: Closed | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Commercial plumbing | Permit status: Approved | Completion date: February 26, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Environmental services | Permit status: Approved | Completion date: February 26, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Issuance | Permit status: Approved | Completion date: March 1, 2016 | Permit id: 2015-113468-Rev | |||||
Pthps for apartments, gas pack for corridors, multi-zone splits for common spaces, misc exhausts in soffits below rated fl/clgs, plans w/co Date: June 15, 2015Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-113472-000 | |||||
Demo of commercial building; no basement, no fill greater than 24, remove all foundations and debris, cap utilities Date: April 8, 2015Permit type: Application | Permit status: Approved | Completion date: April 8, 2015 | Permit id: 2015-146475-000 | |||||
Providing a temporary overhead service for a new construction site. Date: June 12, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-185497-000 | |||||
Provide complete plumbing system from ground up for the fixtures listed on application refund request routed to co inspections; bds; 01/25/16 2/1/2016 nl, removed grease interceptor from permit. Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-195189-000 | |||||
Supply and installation of gas piping to 3 water heaters, 1 bbq, 1 fire place, 1 rooftop unit (supply only for rooftop unit. This unit will be on a future permit) and 1 stub to retail space. Plans w/co Date: July 14, 2015Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-198257-000 | |||||
Sa/st: 272 of 36 rcp combo main in se division st. Contr to provide new 8 connection from property to mh abv687 with storm wye connection to branch @ curb w/cleanout, mh depth 12ft. Contr to verify depth/location/proper slope in the field. Ref bes detail p-257 & p-262 Date: July 14, 2015Permit type: Intake | Permit status: Closed | Completion date: July 14, 2015 | Permit id: 2015-200782-000 | |||||
Sprinkler - install new fire sprinkler system (wet and dry) in new 134 unit apt bldg Date: August 17, 2015Permit type: Intake | Permit status: Approved | Completion date: July 17, 2015 | Permit id: 2015-203024-000 | |||||
134 unit building. Largest unit is 1091 sqft - oar 918 reduced fees apply only to residential units. Add (3) 601-10 amp svc fdr & (1) over 10 amp svc fdr 9 29 15 Date: February 3, 2016Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2015-218525-000 | |||||
Dfs for storefront system Permit type: Application | Permit status: Approved | Completion date: March 7, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Issuance/intake | Permit status: Intake | Completion date: March 7, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Process management | Permit status: Closed | Completion date: March 9, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Process management | Permit status: Closed | Completion date: April 11, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Planning and zoning | Permit status: Approved | Completion date: March 30, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Life safety | Permit status: Approved | Completion date: April 8, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Structural | Permit status: Approved | Completion date: March 10, 2016 | Permit id: 2015-113468-Dfs | |||||
Dfs for storefront system Permit type: Issuance | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-113468-Dfs | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Application | Permit status: Approved | Completion date: December 2, 2015 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Issuance/intake | Permit status: Intake | Completion date: December 2, 2015 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Process management | Permit status: Closed | Completion date: January 12, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: January 5, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Life safety | Permit status: Approved | Completion date: January 11, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 01 - card reader, for building security, getting added to the door between the garage and lobby. Permit type: Issuance | Permit status: Approved | Completion date: January 12, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Application | Permit status: Approved | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Issuance/intake | Permit status: Intake | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Process management | Permit status: Closed | Completion date: February 25, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Process management | Permit status: Closed | Completion date: March 1, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Commercial plumbing | Permit status: Approved | Completion date: February 26, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Environmental services | Permit status: Approved | Completion date: February 26, 2016 | Permit id: 2015-113468-Rev | |||||
Rev 02 - removing grease interceptor from building permit; will be included in the ti permit for future tenant; sheets p101& p112 revised Permit type: Issuance | Permit status: Approved | Completion date: March 1, 2016 | Permit id: 2015-113468-Rev | |||||
Pthps for apartments, gas pack for corridors, multi-zone splits for common spaces, misc exhausts in soffits below rated fl clgs, plans w co Date: June 15, 2015Permit type: Intake | Permit status: Closed | Completion date: February 18, 2015 | Permit id: 2015-113472-000 | |||||
Provide complete plumbing system from ground up for the fixtures listed on application refund request routed to co inspections; bds; 01 25 16 2 1 2016 nl, removed grease interceptor from permit. Date: July 1, 2015Permit type: Intake | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2015-195189-000 | |||||
Supply and installation of gas piping to 3 water heaters, 1 bbq, 1 fire place, 1 rooftop unit (supply only for rooftop unit. This unit will be on a future permit) and 1 stub to retail space. Plans w co Date: July 14, 2015Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-198257-000 | |||||
Sa st: 272 of 36 rcp combo main in se division st. Contr to provide new 8 connection from property to mh abv687 with storm wye connection to branch @ curb w cleanout, mh depth 12ft. Contr to verify depth location proper slope in the field. Ref bes detail p-257 & p-262 Date: July 14, 2015Permit type: Intake | Permit status: Closed | Completion date: July 14, 2015 | Permit id: 2015-200782-000 | |||||
Cover over patio Date: August 6, 2007Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: March 19, 2012 | Current use: Business | Permit id: 2007-139897-000 | |||||
Demo of commercial building; no basement, no fill greater than 24", remove all foundations and debris, cap utilities Date: April 8, 2015Client: Southeast Uplift Neighborhood Program | Permit type: Demolition | Permit status: Final | Completion date: October 20, 2015 | Current use: Business | Permit id: 2015-146475-000 | |||||
Tenant improvement for first time restaurant tenant on ground floor, includes kitchen food prep area with equipment and dining seating area, service counter Date: June 14, 2016Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Under inspection | Current use: Business | Permit id: 2016-187196-000 |