400amp temp service & misc feeders & branch for temp power Date: December 5, 2014Permit type: Intake | Permit status: Closed | Completion date: December 5, 2014 | Permit id: 2014-245957-000 | |||||
166 unit building. Largest unit 1408 sqft - oar 918 reduced fees apply only to residential units. Date: February 11, 2015Permit type: Intake | Permit status: Closed | Completion date: January 15, 2015 | Permit id: 2015-105694-000 | |||||
Plumbing interior and exterior Date: January 20, 2015Permit type: Intake | Permit status: Closed | Completion date: January 20, 2015 | Permit id: 2015-107263-000 | |||||
San: contractor shall connect to existing 8 branch per std p-262 . Branch capped on property from demo and connects through private easement. Depth, length unknown. Contractor to verify all depths and locations in field. Contact x37869 Date: May 26, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-127895-000 | |||||
Sprinkler - install complete combo standpipe system in residential portion. Install complete dry system in parking garage Date: May 12, 2015Permit type: Intake | Permit status: Approved | Completion date: March 31, 2015 | Permit id: 2015-142146-000 | |||||
Gas piping inside building Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169446-000 | |||||
Phase ii plumbing inside building - interior plumbing Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169464-000 | |||||
New construction-underground utilities Date: May 26, 2015Permit type: Intake | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2015-175761-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: May 27, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Closed | Completion date: September 4, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: July 14, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: July 16, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: September 4, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: September 25, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Land use review | Permit status: Completed | Completion date: October 30, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Site development | Permit status: No concerns | Completion date: August 4, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Life safety | Permit status: Response sent | Completion date: July 22, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Fire bureau | Permit status: Response sent | Completion date: August 4, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Environmental services | Permit status: Response sent | Completion date: August 11, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Environmental services | Permit status: Response sent | Completion date: August 1, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Environmental services | Permit status: Response sent | Completion date: July 31, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Transportation | Permit status: No concerns | Completion date: August 25, 2014 | Permit id: 2014-160287-000 | |||||
Approval of greenway review for construction of the following: one 5 to 7-story multi-dwelling residential building, with below ground parking; associated site improvements (walkways, landscaping, etc.)within the greenway overlay zone, and in substantial conformance with exhibits c. 2. A, c. 2. B, c. 3. A and c. 4, as, signed, and dated by the city of portland bureau of development services on august 25, 2014. Approval is subject to the following conditions:a. All permits: as part of the (building, grading, site development, etc.) permit application submittals, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 33. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-160287 gw. Any field changes shall be in substantial conformance with approved exhibits c. 2. A, c. 2. B, c. 3. A and c. 4. Note: in addition to the requirements Permit type: Parks bureau | Permit status: No concerns | Completion date: July 22, 2014 | Permit id: 2014-160287-000 | |||||
New six story, 195,363 sq ft, apartment building with basement parking (mech permitted and approved under 14-174922) Date: May 12, 2015Permit type: Application | Permit status: Approved | Completion date: December 31, 2014 | Permit id: 2014-173383-000 | |||||
Dfs for post tension concrete decks Date: March 5, 2015Permit type: Application | Permit status: Approved | Completion date: February 24, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Issuance/intake | Permit status: Intake | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Process management | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Life safety | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Structural | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Structural | Permit status: Not reqd | Completion date: June 9, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for continuous rod hold down system Permit type: Issuance | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Issuance/intake | Permit status: Intake | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Process management | Permit status: Closed | Completion date: July 2, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Life safety | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Structural | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Structural | Permit status: Required | Completion date: June 9, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Special inspections review | Permit status: Approved | Completion date: June 9, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Permit type: Issuance | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2014-173383-Dfs | |||||
Excavation/shoring, foundation, structural shell to include all underslab and perimeter utilities for the project,1 basement level Date: December 12, 2014Permit type: Application | Permit status: Approved | Completion date: June 27, 2014 | Permit id: 2014-173383-Fnd | |||||
Add footing and pt slab blockout for temporary tower crane. Date: December 22, 2014Permit type: Application | Permit status: Approved | Completion date: December 17, 2014 | Permit id: 2014-173383-Rev | |||||
Floor to exterior wall frame detail revision - the updated details use full solid fire-treated wood members in liue of two layers of 5/8 gypsum board to the underside of the floor sheathing Date: June 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2014-173383-Rev | |||||
Land use review Permit status: Closed | Completion date: June 24, 2014 | Permit id: 2014-174289-000 | |||||
Land use review Permit status: Letter sent | Completion date: July 16, 2014 | Permit id: 2014-174289-000 | |||||
Phase 1&2: one 1. 5-ton, one 2-t, one 4-ton splits for common spaces, garage exhaust, elevator pressurization & subducts on e-power, genset venting, three heat only rtus for corridors, pthps for apts, plans w/co Date: December 12, 2014Permit type: Intake | Permit status: Closed | Completion date: June 26, 2014 | Permit id: 2014-174922-000 | |||||
Approval of an adjustment to reduce the minimum lot line setback from 14 to as little as 11-6 for the angled wall along the west/sw macadam avenue street lot line (33. 550. 220/table 550-1). Approval of an adjustment to increase the maximum building faade length from 200 to 249 along the north property line, and from 200 to 293 along the south property line (33. 550. 240. A). These approvals are granted based on the submitted plans and elevations, exhibits c. 1 through c. 6, all signed and dated september 23, 2014, and subject to the following condition:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 6. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 14-177695 ad. Date: September 25, 2014Permit type: Land use review | Permit status: Completed | Completion date: July 3, 2014 | Permit id: 2014-177695-000 | |||||
Demolish existing 2 story athletic club, remove all debris Date: August 25, 2014Permit type: Application | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-203343-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 24, 2014 | Permit id: 2014-204414-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 5, 2014 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Completed | Completion date: February 9, 2015 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Not reqd | Completion date: September 5, 2014 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Received | Completion date: August 27, 2014 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Accepted for review | Completion date: August 27, 2014 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Completed | Completion date: September 24, 2014 | Permit id: 2014-204414-000 | |||||
Pre-design pw Permit status: Billed | Completion date: January 26, 2015 | Permit id: 2014-204414-000 | |||||
Plan review pw Permit status: Approved | Completion date: March 2, 2015 | Permit id: 2014-204414-000 | |||||
Plan review pw Permit status: Approved | Completion date: March 3, 2015 | Permit id: 2014-204414-000 | |||||
Plan review pw Permit status: Approved | Completion date: April 24, 2015 | Permit id: 2014-204414-000 | |||||
Plan review pw Permit status: Approved | Completion date: September 24, 2014 | Permit id: 2014-204414-000 | |||||
Bond/insurance pw Permit status: Approved | Completion date: December 16, 2014 | Permit id: 2014-204414-000 | |||||
Bond/insurance pw Permit status: Completed | Completion date: June 3, 2015 | Permit id: 2014-204414-000 | |||||
Pre-issuance pw Permit status: Ready for pick up | Completion date: May 19, 2015 | Permit id: 2014-204414-000 | |||||
Pre-issuance pw Permit status: Signed | Completion date: December 16, 2014 | Permit id: 2014-204414-000 | |||||
Pre-issuance pw Permit status: Completed | Completion date: April 24, 2015 | Permit id: 2014-204414-000 | |||||
Pre-issuance pw Permit status: Billed | Completion date: April 30, 2015 | Permit id: 2014-204414-000 | |||||
Pre-issuance pw Permit status: Completed | Completion date: May 19, 2015 | Permit id: 2014-204414-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Closed | Completion date: November 5, 2014 | Permit id: 2014-234737-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Letter sent | Completion date: December 3, 2014 | Permit id: 2014-234737-000 | |||||
Alarm-install new fire alarm system for apartment complex Date: September 25, 2015Permit type: Intake | Permit status: Approved | Completion date: September 9, 2015 | Permit id: 2015-233830-000 | |||||
Install thermostats in 168 rooms and 6 common areas, 174 locations total Date: October 14, 2015Permit type: Intake | Permit status: Closed | Completion date: October 14, 2015 | Permit id: 2015-250724-000 | |||||
Hazardous-provide and install remote fuel fill station and emergency generator at ground floor inside building. Generator is bolted on top of fuel tank. Date: December 17, 2015Permit type: Intake | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-258151-000 | |||||
Installation of car matrix systems Date: December 14, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-273760-000 | |||||
Hazardous-temp heat while underconstruction. Temp tank set will be at location under six months. Date: December 8, 2015Permit type: Intake | Permit status: Approved | Completion date: December 8, 2015 | Permit id: 2015-274350-000 | |||||
New illuminated sign on existing canopy 31. 67sf Date: December 16, 2015Permit type: Intake | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 2015-275024-000 | |||||
Install an illuminated flush mounted 16. 25sf sign on the east elevation Date: December 16, 2015Permit type: Intake | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 2015-275028-000 | |||||
Two sign circuits Date: December 9, 2015Permit type: Intake | Permit status: Closed | Completion date: December 9, 2015 | Permit id: 2015-275033-000 | |||||
Das system installation-landing drive Date: February 17, 2016Permit type: Electrical inspections | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2016-122464-000 | |||||
Install and optimize distributed antenna system (das) to provide coverage for six floors and the basement parking. Date: April 18, 2016Permit type: Intake | Permit status: Closed | Completion date: April 18, 2016 | Permit id: 2016-154276-000 | |||||
Alarm-install and optimize distributed antenna system(das) coverage for six floors including basement Date: April 20, 2016Permit type: Intake | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2016-155721-000 | |||||
Dfs for continuous rod hold down system Date: July 8, 2015Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for mechanical parking stall Date: July 8, 2015Permit type: Application | Permit status: Approved | Completion date: June 3, 2015 | Permit id: 2014-173383-Dfs | |||||
Dfs for balconies and railing Date: November 2, 2015Permit type: Application | Permit status: Approved | Completion date: October 1, 2015 | Permit id: 2014-173383-Dfs | |||||
Rev 04 - north site concrete retaining wall design revision Date: July 22, 2015Permit type: Application | Permit status: Approved | Completion date: July 15, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 05 - soldier pile wall revision - geodesign proposes to reduce the soil special inspections from continuous to periodic. Date: July 29, 2015Permit type: Application | Permit status: Approved | Completion date: July 28, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 06 - revision to interior wall construction type, bike room and in-unit bike rack reorganization Date: September 10, 2015Permit type: Application | Permit status: Approved | Completion date: August 28, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 07 - added new wall type detail w9 and revised detail w32. Revisions to sheets a010, a103-a107 and a920. Date: November 6, 2015Permit type: Application | Permit status: Approved | Completion date: October 14, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 08 - add new detail - level 7 dimising wall framing, see comment Date: November 25, 2015Permit type: Application | Permit status: Approved | Completion date: November 25, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 09 - revise exterior beam 2-hr rated fireproofing. Details updated: 17/a313, 34/a216 and 18/a520. Special inspection of fire proofing required. Date: January 22, 2016Permit type: Application | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2014-173383-Rev | |||||
Rev - north private drive curb relocation, revision to north stormwater planter & 5th floor trellis install Date: March 24, 2016Permit type: Application | Permit status: Approved | Completion date: February 10, 2016 | Permit id: 2014-173383-Rev | |||||
Rev 11 - revise shear wall and hold down (sheet s201) and shear wall schedule and detail (sheet 203). Sheet s201 modifies 5 hold down types and locations. Sheet s203 adds two hold down types to the hold down schedule b/s203. Date: December 23, 2015Permit type: Application | Permit status: Approved | Completion date: December 17, 2015 | Permit id: 2014-173383-Rev | |||||
Intake pw Date: July 16, 2015Permit status: Assigned | Completion date: September 24, 2014 | Permit id: 2014-204414-000 | |||||
400amp temp service & misc feeders & branch for temp powerfaxed Date: December 5, 2014Permit type: Intake | Permit status: Closed | Completion date: December 5, 2014 | Permit id: 2014-245957-000 | |||||
Excavation shoring, foundation, structural shell to include all underslab and perimeter utilities for the project,1 basement level Date: December 12, 2014Permit type: Application | Permit status: Approved | Completion date: June 27, 2014 | Permit id: 2014-173383-Fnd | |||||
Floor to exterior wall frame detail revision - the updated details use full solid fire-treated wood members in liue of two layers of 5 8 gypsum board to the underside of the floor sheathing Date: June 16, 2015Permit type: Application | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2014-173383-Rev | |||||
Rev 09 - revise exterior beam 2-hr rated fireproofing. Details updated: 17 a313, 34 a216 and 18 a520. Special inspection of fire proofing required. Date: January 22, 2016Permit type: Application | Permit status: Approved | Completion date: January 6, 2016 | Permit id: 2014-173383-Rev | |||||
Rev 11 - revise shear wall and hold down (sheet s201) and shear wall schedule and detail (sheet 203). Sheet s201 modifies 5 hold down types and locations. Sheet s203 adds two hold down types to the hold down schedule b s203. Date: December 23, 2015Permit type: Application | Permit status: Approved | Completion date: December 17, 2015 | Permit id: 2014-173383-Rev | |||||
Phase 1&2: one 1. 5-ton, one 2-t, one 4-ton splits for common spaces, garage exhaust, elevator pressurization & subducts on e-power, genset venting, three heat only rtus for corridors, pthps for apts, plans w co Date: December 12, 2014Permit type: Intake | Permit status: Closed | Completion date: June 26, 2014 | Permit id: 2014-174922-000 |