| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temp service Date: December 3, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: December 10, 2014 | Permit id: 2014-244623-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Land use review | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Process management | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Process management | Permit status: Routed | Completion date: January 28, 2015 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Auditor | Permit status: No concerns | Completion date: October 29, 2014 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Addressing | Permit status: Not reqd | Completion date: October 3, 2014 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Site development | Permit status: Satisfied | Completion date: January 29, 2015 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Fire bureau | Permit status: Satisfied | Completion date: February 11, 2015 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Transportation | Permit status: Satisfied | Completion date: March 4, 2015 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Permit type: Water bureau review | Permit status: Satisfied | Completion date: October 17, 2014 | Permit id: 2013-241486-000 | |||||
Approval of a preliminary plan for a 2-parcel partition, that will result in 2 standard lots as illustrated with exhibit c. 1, subject to the following conditions:a. Supplemental plan. Three copies of an additional supplemental plan shall be submitted with the final plat survey for land use and bes review and approval. That plan must portray how the conditions of approval listed below are met. In addition, the supplemental plan must show the surveyed location of the following: any buildings or accessory structures on the site at the time of the final plat application; the proposed sewer service for both parcels to the public sewer in sw nevada court; and any other information specifically noted in the conditions listed below. B. The final plat must show the following: 1. The applicant shall meet the street dedication requirements of the city engineer for sw nevada court. The required right-of-way dedication must be shown on the final plat. 2. A recording block for each of the legal doc Date: July 25, 2014Permit type: Land use review | Permit status: Completed | Completion date: December 30, 2013 | Permit id: 2013-241486-000 | |||||
Pbot/bes joint pw project Permit type: Intake pw | Permit status: Assigned | Completion date: February 10, 2015 | Permit id: 2014-113875-000 | |||||
Demolish single family residence, no basement, cap sewer, remove all debris subject to 35 day demo delay - expires on 10/15/14 at 4: pm septic decommissioning required. Call for inspection 842. Date: October 20, 2014Permit type: Application | Permit status: Approved | Completion date: September 10, 2014 | Permit id: 2014-210718-000 | |||||
Demo detached garage 528sf, remove all debris Date: October 20, 2014Permit type: Application | Permit status: Approved | Completion date: September 10, 2014 | Permit id: 2014-210721-000 | |||||
Demo accessory structure, remove all debris Date: October 20, 2014Permit type: Application | Permit status: Approved | Completion date: September 10, 2014 | Permit id: 2014-210723-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Land use review | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Land use review | Permit status: Mailed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: January 28, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Satisfied | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Completed | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Auditor | Permit status: No concerns | Completion date: October 29, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Addressing | Permit status: Not reqd | Completion date: October 3, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Bds land use services | Permit status: Satisfied | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Site development | Permit status: Satisfied | Completion date: January 29, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Fire bureau | Permit status: Satisfied | Completion date: February 11, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Environmental services | Permit status: Satisfied | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Transportation | Permit status: Satisfied | Completion date: March 4, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Water bureau review | Permit status: Satisfied | Completion date: October 17, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Signed | Completion date: July 14, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Signed | Completion date: September 23, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Completed | Completion date: October 1, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Land use review | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Land use review | Permit status: Mailed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Closed | Completion date: October 1, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: January 28, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Routed | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Satisfied | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Process management | Permit status: Completed | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Auditor | Permit status: No concerns | Completion date: October 29, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Addressing | Permit status: Not reqd | Completion date: October 3, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Bds land use services | Permit status: Satisfied | Completion date: July 10, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Site development | Permit status: Satisfied | Completion date: January 29, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Fire bureau | Permit status: Satisfied | Completion date: February 11, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Environmental services | Permit status: Satisfied | Completion date: September 17, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Transportation | Permit status: Satisfied | Completion date: March 4, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Water bureau review | Permit status: Satisfied | Completion date: October 17, 2014 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Signed | Completion date: July 14, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Signed | Completion date: September 23, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Completed | Completion date: September 23, 2015 | Permit id: 2013-241486-000 | |||||
Approval of the final plat to create two standard lots. Permit type: Plat issuance | Permit status: Completed | Completion date: October 1, 2015 | Permit id: 2013-241486-000 | |||||
Demolish single family residence, no basement, cap sewer, remove all debris subject to 35 day demo delay - expires on 10 15 14 at 4: pm septic decommissioning required. Call for inspection 842. Date: October 20, 2014Client: Southwest Neighborhoods, Inc. | Permit type: Demolition | Permit status: Final | Completion date: January 20, 2015 | Current use: Single family dwelling | Permit id: 2014-210718-000 |