ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Homeowner- heavy up exam Date: November 4, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: November 2, 2015 | Current use: Single family dwelling | Permit id: 693519 | |||||
Geothermal system well permit 689325 Date: February 18, 2015Permit type: Mechanical permit | Permit status: Finaled | Completion date: November 2, 2015 | Current use: Single family dwelling | Permit id: 703719 | |||||
Adding family room and masterbathroom revision 10/8/15 (fr) converting a storage room into a bathroom Date: July 24, 2014 Value: $175,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 680123 | |||||
Install riser and cable to provide 400amp underground service to a renovated single family home in accordance with pepco plan no. 3469805. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 17, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 332610 | |||||
Install gas service in accordance with washington gas plan no. 475893. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: February 19, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 331212 |