| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New tenant - interior building for smashburger u/o# 294129 revision 10/8/13 ==see log - revision issued 10/25/13-address corrected on 12/4/2013 Date: September 24, 2013 Value: $230,010Permit type: Commercial building | Permit status: Issued | Current use: Restaurant | Permit id: 635790 | |||||
Commercial - interior alterations - low voltage for secuirty devices Date: November 18, 2013Permit type: Electrical permit | Permit status: Issued | Current use: Business building | Permit id: 655352 | |||||
New tenant- interior building for smashburger u/o# 294129 revision 10/8/13 ==see log - revision issued 10/25/13-address corrected on 12/4/2013 Date: September 24, 2013 Value: $230,010Permit type: Commercial building | Permit status: Issued | Current use: Restaurant | Permit id: 635790 | |||||
Additional equipment, one 1 amp panel, two 11kw each ac units, one 40kw air, two 12kw heat pump, one 12kw cu Date: October 9, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Business building | Permit id: 641954 | |||||
Bore roadway, (dig and backfill trench) to place 2-4" pcc from pepco p771420-9793 to customer stub out,buried fiber optic cable facilities in accordance with verizon plan no. 1a0a3ph. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps
|