ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install gas service in accordance with washington gas plan no. 249955. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruct Date: January 16, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 307593 | |||||
Pre-construction meeting required contact mc. Dps inspector charlie lawson @ 301-370-3687 repair gas main. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Notify mc. Dps inspector when work is complete utility representative: charlie holmon @ 202-624-6054 wgl #43174 Date: April 12, 2006Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 244921 |