ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Please do not request inspections under this permit until 2 business days after permit issuance. Date: November 12, 2014Permit type: Electrical permit | Permit status: Finaled | Completion date: October 5, 2015 | Current use: Single family dwelling | Permit id: 694369 | |||||
Mechanical permit Date: March 10, 2015Permit status: Finaled | Completion date: October 5, 2015 | Current use: Single family dwelling | Permit id: 705407 | |||||
Addition- bedroom, and kitchen and removing roof revision on 01/16/2015 Date: November 7, 2014 Value: $180,000Permit type: Building residential | Permit status: Finaled | Completion date: October 5, 2015 | Current use: Single family dwelling | Permit id: 687477 | |||||
New driveway - building addition #687477. Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector.(marylanddnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.)? Date: November 7, 2014Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 323604 | |||||
Replacegas service in accordance with washington gas plan no. 628241. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: March 14, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351423 | |||||
Dumpster temporarily place dumpster within the public right of way. Dumpster location, pavement protection and warning devices such as barricades, traffic cones and/or lights are to be placed as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by placement of the dumpster. The permittee agrees to hold montgomery county harmless from any liability associated with placement of dumpster in the public right of way. Date: June 19, 2014Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 316787 |