Electrical for new 5 story hostel Date: January 13, 2016Permit type: Intake | Permit status: Closed | Completion date: December 7, 2015 | Permit id: 2015-273875-000 | |||||
Sprinkler - new sprinkler system for new bldg Date: January 28, 2016Permit type: Intake | Permit status: Approved | Completion date: December 23, 2015 | Permit id: 2015-280902-000 | |||||
Radiant panel heating system, water heater venting, and gas piping to 3 pieces of kitchen equipment, 2 boilers, 2 water heaters, and 2 gas laundry dryers Date: March 29, 2016Permit type: Intake | Permit status: Closed | Completion date: January 8, 2016 | Permit id: 2016-100439-000 | |||||
Plumbing for (129) fixtures Date: January 8, 2016Permit type: Intake | Permit status: Closed | Completion date: January 5, 2016 | Permit id: 2016-100535-000 | |||||
Storm conn: 2 lf of 9combo sewer main (approx d=10) in nw glisan st. Contractor to install 6 x tee (per tedd goff) into 9 main and prepare 6 branch to property per std p-262. Contractor to verify all depths and connections in field. X37869 Date: January 7, 2016Permit type: Intake | Permit status: Closed | Completion date: January 7, 2016 | Permit id: 2016-101909-000 | |||||
1 ft storm to bes planters Date: January 14, 2016Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105813-000 | |||||
San conn: 2 lf of 9 vsp combo main, (approx d=10), in nw glisan st. Contractor shall connect to existing wye per std p-262, 155 from right of way line located (in the intersection of nw 19th & nw glisan. Contractor to verify all depths and locations in field. Contact x37869 Date: January 14, 2016Permit type: Intake | Permit status: Closed | Completion date: January 14, 2016 | Permit id: 2016-105927-000 | |||||
It is the decision of the historic landmarks commission to approve historic design review for approval of a new 5-story hostel building in the alphabet historic district in the northwest plan district, to include: 15 dorm rooms, 6 private rooms, and one private residential unit on the top floor; landmark far transfer from the elliston at 425 nw 18th avenue; exterior materials including stucco, fiber cement trim, fiberglass windows, aluminum storefront and nanawall systems, canvas awnings, and metal railings; and alterations to a non-historic wood deck at 1818 nw glisan. Approval of a modification to 33. 140. 2 pedestrian standards to reduce the width of the pedestrian path from 6 to 4-6. Approvals per exhibits c-1 through c-44, signed, stamped, and dated july 27, 2015, subject to the following conditions:a. As part of the building permit application submittal, the following development-related conditions (a - d) must be noted on each of the 4 required site plans or included as a sheet in Date: August 6, 2015Permit type: Land use review | Permit status: Completed | Completion date: March 19, 2015 | Permit id: 2015-134798-000 | |||||
Pbot pw permit Date: March 24, 2016Permit type: Intake pw | Permit status: Assigned | Completion date: April 18, 2015 | Permit id: 2015-145915-000 | |||||
Construct new 5 story hostel building with 21 sleeping units, basement level includes storage, mechanical room, laundry room, restroom and housekeeping area; main floor includes lobby area and cafe with seating; levels 2-4 includes hostel units and restrooms, 5th floor is private residence; includes all site work Date: November 17, 2015Permit type: Application | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-194028-000 | |||||
Dfs for elevator Date: January 19, 2016Permit type: Application | Permit status: Approved | Completion date: December 9, 2015 | Permit id: 2015-194028-Dfs | |||||
Dfs - trusses Date: January 19, 2016Permit type: Application | Permit status: Approved | Completion date: January 5, 2016 | Permit id: 2015-194028-Dfs | |||||
Dfs for post tension slab rebar and tendons Date: February 12, 2016Permit type: Application | Permit status: Approved | Completion date: January 19, 2016 | Permit id: 2015-194028-Dfs | |||||
Dfs for seismic hold down rods Date: February 4, 2016Permit type: Application | Permit status: Approved | Completion date: January 19, 2016 | Permit id: 2015-194028-Dfs | |||||
Dfs for fire retardant on ext peruyeter glutans Date: February 12, 2016Permit type: Application | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2015-194028-Dfs | |||||
Dfs for fiber glass windows and door Date: April 22, 2016Permit type: Application | Permit status: Approved | Completion date: March 15, 2016 | Permit id: 2015-194028-Dfs | |||||
Water heater strapping Date: April 14, 2016Permit type: Application | Permit status: Approved | Completion date: March 24, 2016 | Permit id: 2015-194028-Dfs | |||||
Dfs for i joists and glu-lams Date: April 22, 2016Permit type: Application | Permit status: Approved | Completion date: March 31, 2016 | Permit id: 2015-194028-Dfs | |||||
Revise permit to place shotcrete on the interior of the basement walls. Date: February 19, 2016Permit type: Application | Permit status: Approved | Completion date: January 5, 2016 | Permit id: 2015-194028-Rev | |||||
Hvac associated with new 5 story hostel building Date: November 17, 2015Permit type: Intake | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-194031-000 |