Building Permits at 4757 Macarthur Boulevard Nw Washington DC


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 4757 Macarthur Boulevard Nw Washington DC over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Construction staging area
Date:  April 19, 2012
Contractor: Dcwater

Permit status: Expired | Expiration date: April 29, 2012 | Permit id: Pa10054660
2012/04/1901004757 Macarthur Boulevard Nw Washington DcDcwater
SCORE
100
Construction staging area
Date:  January 14, 2013
Contractor: Dcwater

Permit status: Expired | Expiration date: February 19, 2013 | Permit id: Pa10083313
2013/01/1401004757 Macarthur Boulevard Nw Washington DcDcwater
SCORE
100
Construction staging area
Date:  January 14, 2013
Contractor: Dcwater Ops

Permit status: Permit expired | Expiration date: February 19, 2013 | Permit id: Pa10083313
2013/01/1401004757 Macarthur Boulevard Nw Washington DcDcwater Ops
SCORE
100
Repairs on sewer service lateral were done in the roadway 6x25) sidewalk 6x9) yard 6x15. Work must adhere to all condtions as outlined by ddot ufa approval, including tree trunks and tree roots care. Also work cannot be done during rush hours (before 9: a. M. And and after 3: p. M.) further, if work impacts metro bus service then applicant must coordinate work prior to work commencement.
Date:  April 4, 2012
Contractor: Dcwater

Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: October 5, 2012 | Permit id: Pa70965
2012/04/0401004757 Macarthur Boulevard Nw Washington DcDcwater
SCORE
100
Repair sewer service lateral in roadway (6x25), sidewalk (6x9) and yard (6x15). This permit is restoration only and tied to original ewr e9226, original construction permit 70965 and original occupancy permit 10054660. Wmata conditions:-"approved with the condition of adding a flagger to assist pedestrians with crossing macarthur blvd at 47th place nw, due to a lack of a crosswalk at that location. The bus stop is unaffected and will stay open through the construction." all street trees within the limits of work or directly adjacent must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this jo
Date:  January 7, 2013
Contractor: Dcwater

Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: April 18, 2013 | Permit id: Pa78338
2013/01/0701004757 Macarthur Boulevard Nw Washington DcDcwater
SCORE
100
Repairs on sewer service lateral were done in the roadway 6x25) sidewalk 6x9) yard 6x15. Work must adhere to all condtions as outlined by ddot/ufa approval, including tree trunks and tree roots care. Also work cannot be done during rush hours (before 9: a. M. And and after 3: p. M.) further, if work impacts metro bus service then applicant must coordinate work prior to work commencement.
Date:  April 4, 2012
Contractor: Dcwater Ops

Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: October 5, 2012 | Permit id: Pa70965
2012/04/0401004757 Macarthur Boulevard Nw Washington DcDcwater Ops
SCORE
100
Repair sewer service lateral in roadway (6x25), sidewalk (6x9) and yard (6x15). This permit is restoration only and tied to original ewr e9226, original construction permit 70965 and original occupancy permit 10054660. Wmata conditions:-"approved with the condition of adding a flagger to assist pedestrians with crossing macarthur blvd at 47th place nw, due to a lack of a crosswalk at that location. The bus stop is unaffected and will stay open through the construction." all street trees within the limits of work or directly adjacent must be protected and all excavation operations shall comply with district department of transportation standard specifications for highways and structures sections 207 and 611. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Excavations within limits of tree root spread shall proceed with care either by use of hand tools or with equipment that will not cause tree root damage. If there are any tree conflicts on this jo
Date:  January 7, 2013
Contractor: Dcwater Ops

Permit type: Excavation; repair sewer service lateral | Permit status: Permit expired | Expiration date: April 18, 2013 | Permit id: Pa78338
2013/01/0701004757 Macarthur Boulevard Nw Washington DcDcwater Ops
SCORE
56
Moving truck
Date:  May 9, 2016
Contractor: Noreen Beg

Permit status: Permit expired | Expiration date: May 20, 2016 | Permit id: Pa10263414
2016/05/090564757 Macarthur Boulevard Nw Washington DcNoreen Beg
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.