ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pre-construction meeting required contact mc. Dps inspector robert bucklin @ 301-370-3683 excavate roadway & sidewalk area to install conduits per plan. A mill & overlay may be required for this permit. The permittee should discuss possible mill & overlay requirements for street/sidewalk cuts under this permit with the mc. Dps right-of-way inspector prior to beginning work. A 2" mill & surface overlay shall be preformed if required. If replacement or restoration of brick pavers is required, the permittee must contact the dept. Of public works & transportation @ 240-777-7623 to coordinate. Complete repair & restoration of the right of way shall be made, "in-kind", of any & all damages done to existing improvements in the right-of-way caused by construction operations. Notify mc. Dps inspector when work is complete. Utility representative: attilio abate @ 301-595-6063. Date: January 9, 2004Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 225855 |