ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Sidewalk deposit during construction / this is not a permit to excavate and/or occupy; separate permits are required / deposit will be returned if sidewalk is restored to city standards / request for deposit return must be received within 6 months of job completion.; deposit replaces one by previous owner jian zhoe; ;permit; 60. ;/ inspection 100. 00;/ deposit 2 120. 00 Date: September 24, 2013Client: Woodward Ronald A | Permit type: Sidewalk deposit | Permit id: Sdep-288916 | Parcel: 1700873000 | |||||
Sidewalk deposit during construction this is not a permit to excavate and or occupy; separate permits are required ; deposit will be returned if sidewalk is restored to city standards ; request for deposit return must be received within 6 months of job completion.; deposit replaces one by previous owner jian zhoe; ;permit; 60. ; ; inspection 100. 00; ; deposit 2 120. 00 Date: September 24, 2013Client: Nguyen Duoc T | Permit type: Sidewalk deposit | Permit id: Sdep-288916 | Parcel: 1700873000 |