| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pr# precision castparts/precision castparts ti Date: December 14, 2006Permit type: Reviews | Permit status: Approved | Completion date: December 14, 2006 | Permit id: 2006-183843-000 | |||||
Intake Date: March 7, 2007Permit status: Closed | Completion date: March 7, 2007 | Permit id: 2007-113434-000 | |||||
F4/ti work 2nd,3rd,4th floor; most work on 2nd flr, partition wall removal, doors, add back to create hallway, offices, conference room, breakroom, doors, relites, clerestory, floor penetration for new connecting stair between 2nd and 3rd floor, railing, finishes, ceiling, elec, plbg, paint, etc Date: June 9, 2014Permit type: Intake | Permit status: Closed | Completion date: May 5, 2014 | Permit id: 2014-152691-000 | |||||
Power/voice/data - precision castparts - work 2nd,3rd,4th floor; most work on 2nd flr, partition wall removal, doors, add back to create hallway, offices, conference room, breakroom, doors, relites, clerestory, floor penetration for new connecting stair between 2nd and 3rd floor, railing, finishes, ceiling, elec, plbg, paint, etc Date: May 13, 2014Permit type: Intake | Permit status: Closed | Completion date: May 13, 2014 | Permit id: 2014-155823-000 | |||||
Sprinkler - relocate heads to maintain coverage around new walls & ceilings Date: May 21, 2014Permit type: Intake | Permit status: Closed | Completion date: May 16, 2014 | Permit id: 2014-157621-000 | |||||
Telecom, access, cctv, elev, fire alarm - precision castparts - work 2nd,3rd,4th floor; most work on 2nd flr, partition wall removal, doors, add back to create hallway, offices, conference room, breakroom, doors, relites, clerestory, floor penetration for new connecting stair between 2nd and 3rd floor, railing, finishes, ceiling, elec, plbg, paint, etc (added on elevator/fire alarm updates 6. 12. 14 db) Date: May 29, 2014Permit type: Intake | Permit status: Closed | Completion date: May 29, 2014 | Permit id: 2014-162414-000 | |||||
F4/ti work 2nd,3rd,4th floor - relocate 1 existing vav, add 1 new vav, new ductwork & grilles Date: June 16, 2014Permit type: Intake | Permit status: Closed | Completion date: June 2, 2014 | Permit id: 2014-164099-000 | |||||
Addition to existing alarm system 2nd 3rd and 4th floors---2 sets of plans Date: June 3, 2014Permit type: Intake | Permit status: Closed | Completion date: June 3, 2014 | Permit id: 2014-164310-000 | |||||
Hvac stat - precision castparts - work 2nd,3rd,4th floor; most work on 2nd flr, partition wall removal, doors, add back to create hallway, offices, conference room, breakroom, doors, relites, clerestory, floor penetration for new connecting stair between 2nd and 3rd floor, railing, finishes, ceiling, elec, plbg, paint, etc Date: June 7, 2014Permit type: Intake | Permit status: Closed | Completion date: June 7, 2014 | Permit id: 2014-166651-000 | |||||
Plumbing renovation at precision castparts 2nd, 3rd and 4th floordemo 2nd floor breakrooms 2sinks, 1dw, relocate breakroom 1 sink, 1dwno plumbing work on 3rd and 4th floor Date: July 17, 2014Permit type: Intake | Permit status: Closed | Completion date: June 11, 2014 | Permit id: 2014-168315-000 | |||||
Speakers - work 2nd,3rd,4th floor; most work on 2nd flr, partition wall removal, doors, add back to create hallway, offices, conference room, breakroom, doors, relites, clerestory, floor penetration for new connecting stair between 2nd and 3rd floor, railing, finishes, ceiling, elec, plbg, paint, etc Date: October 13, 2014Permit type: Intake | Permit status: Closed | Completion date: October 13, 2014 | Permit id: 2014-224422-000 | |||||
Repair irrigation backflow device at north side of building Date: November 25, 2015Permit type: Intake | Permit status: Closed | Completion date: November 25, 2015 | Permit id: 2015-270218-000 | |||||
. F12/pr# ww102/replacement of the east elevation lower level glass Date: August 6, 2010Permit type: Intake | Permit status: Closed | Completion date: July 19, 2010 | Permit id: 2010-157736-000 | |||||
F7/pr#ww103/phase 2 glazing - 2nd fl, extension and new glazing on east elevation, willamette wharf Date: November 18, 2010Permit type: Intake | Permit status: Closed | Completion date: October 14, 2010 | Permit id: 2010-184595-000 | |||||
[20-jul-15] cancelled by kildufke. F7/pr#ww103/dfs - truss submittal Date: December 2, 2010Permit type: Intake | Permit status: Closed | Completion date: November 29, 2010 | Permit id: 2010-184595-Dfs | |||||
F6/ hvac modifications for ti Date: August 1, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166602-000 | |||||
[20-jul-15] cancelled by kildufke. F6/ 2nd flr hallway relocation, doors, ceiling, elec, plbg mt, finishes Date: August 2, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166629-000 | |||||
[20-jul-15] cancelled by kildufke. F6/ hvac for hallway relocation no new equipment duct and grille relocation only Date: August 2, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166634-000 | |||||
[20-jul-15] cancelled by kildufke.#2 hormone synergy - powerpr# ww105 Date: July 31, 2012Permit type: Intake | Permit status: Closed | Completion date: July 31, 2012 | Permit id: 2012-166954-000 | |||||
[20-jul-15] cancelled by kildufke. 2nd fl hallway relocation - powerpr# ww104 Date: July 31, 2012Permit type: Intake | Permit status: Closed | Completion date: July 31, 2012 | Permit id: 2012-166955-000 | |||||
[20-jul-15] cancelled by kildufke. F1/ suite 2 ti/ partition walls for offices, breakroom, sink, ceiling, elec, plbg, mt, finishes sprinkler upgrade reqd per appeal Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 15, 2012 | Permit id: 2012-205724-000 | |||||
[20-jul-15] cancelled by kildufke. F1/ new ductwork on existing hvac equipment, for ti work Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 15, 2012 | Permit id: 2012-205729-000 | |||||
[20-jul-15] cancelled by kildufke. Suite 2 cohen ti/ walls for offices, breakroom, sink, ceiling - power/voice/datapr# ww106 Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 20, 2012 | Permit id: 2012-207111-000 | |||||
[20-jul-15] cancelled by kildufke.#2 cohen - hvac controls pr# ww106 Permit type: Intake | Permit status: Closed | Completion date: November 28, 2012 | Permit id: 2012-209358-000 | |||||
[20-jul-15] cancelled by kildufke.#2 cohen - hvac controls pr# ww106 Permit type: Process management | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2012-209358-000 | |||||
[23-nov-15] cancel pending by kildufke. F9/ suite 2 oregon wine board tenant remodel Date: December 27, 2012Permit type: Intake | Permit status: Closed | Completion date: December 13, 2012 | Permit id: 2012-215327-000 | |||||
[20-jul-15] cancelled by kildufke.#2 oregon wine board ti - pwr/lvpr# ww 107 Date: December 17, 2012Permit type: Intake | Permit status: Closed | Completion date: December 17, 2012 | Permit id: 2012-215909-000 | |||||
[20-jul-15] cancelled by kildufke. F9/ suites 2 & 2 otradi 12,0 sq ft office & incubator lab remodel new unisex restroom to be provided under separate permit as part of this project project includes non lss back up generator Date: March 4, 2013Permit type: Intake | Permit status: Closed | Completion date: December 26, 2012 | Permit id: 2012-218711-000 | |||||
[20-jul-15] cancelled by kildufke. F9/ suites 2 & 2 otradi 12,0 sq ft office & incubator lab remodel - ductwork, new hps and 2 ervs on roof Date: March 4, 2013Permit type: Intake | Permit status: Closed | Completion date: December 26, 2012 | Permit id: 2012-218713-000 | |||||
[20-jul-15] cancelled by kildufke. F9/ alter ductwork on existing equipment Date: December 27, 2012Permit type: Intake | Permit status: Closed | Completion date: December 27, 2012 | Permit id: 2012-218819-000 | |||||
[20-jul-15] cancelled by kildufke. Install (19) sprinklers to accommodate new walls and ceilings. Application and 3 sets of plans recd. Date: January 17, 2013Permit type: Intake | Permit status: Closed | Completion date: January 14, 2013 | Permit id: 2013-104564-000 | |||||
[20-jul-15] cancelled by kildufke. Suites 2 & 2 otradi ti - powerpr# ww108 Date: January 25, 2013Permit type: Intake | Permit status: Closed | Completion date: January 25, 2013 | Permit id: 2013-109142-000 | |||||
[20-jul-15] cancelled by kildufke. Install sprinkler to accommodate new walls and ceilings in existing sprinklered building. Application and 3 sets of plans recd. Date: March 8, 2013Permit type: Intake | Permit status: Closed | Completion date: March 7, 2013 | Permit id: 2013-124499-000 | |||||
[20-jul-15] cancelled by kildufke. Suites 2 & 2 otradi ti - securitypr# ww108 Date: April 26, 2013Permit type: Intake | Permit status: Closed | Completion date: April 25, 2013 | Permit id: 2013-143813-000 | |||||
[20-jul-15] cancelled by kildufke. F11/ 2nd floor accessible restroom Date: May 28, 2013Permit type: Intake | Permit status: Closed | Completion date: May 17, 2013 | Permit id: 2013-156147-000 | |||||
[20-jul-15] cancelled by kildufke. F11/ 2nd floor accessible restroom - new ductwork on existing equipment Date: May 28, 2013Permit type: Intake | Permit status: Closed | Completion date: May 17, 2013 | Permit id: 2013-156149-000 | |||||
[20-jul-15] cancelled by kildufke. 2nd fl ada restroom - powerpr# ww 109 Date: May 29, 2013Permit type: Intake | Permit status: Closed | Completion date: May 29, 2013 | Permit id: 2013-161367-000 | |||||
[20-jul-15] cancelled by kildufke. F2/ suite 270, 2nd flr, n side; partition walls for office, conference rooms, doors, ceiling, elec, plbg Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 3, 2013 | Permit id: 2013-162747-000 | |||||
[20-jul-15] cancelled by kildufke. F2/ new ductwork on existing equipment Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 3, 2013 | Permit id: 2013-162748-000 | |||||
[20-jul-15] cancelled by kildufke.#2 n side; partition walls for office - powerpr# ww110 Date: June 14, 2013Permit type: Intake | Permit status: Closed | Completion date: June 14, 2013 | Permit id: 2013-167932-000 | |||||
[20-jul-15] cancelled by kildufke. Add sprinklers to accommodate new walls and ceilings. Heads total Date: July 31, 2013Permit type: Intake | Permit status: Closed | Completion date: July 31, 2013 | Permit id: 2013-187412-000 | |||||
[20-jul-15] cancelled by kildufke. Add 2 sprinklers in remodeled bathroom. Date: July 31, 2013Permit type: Intake | Permit status: Closed | Completion date: July 31, 2013 | Permit id: 2013-187415-000 | |||||
[20-jul-15] cancelled by kildufke.#1 xlinx fiber upgrd phone system upgradepr# ww111 Date: October 7, 2013Permit type: Intake | Permit status: Closed | Completion date: October 7, 2013 | Permit id: 2013-213317-000 | |||||
. F12 pr# ww102 replacement of the east elevation lower level glass Date: August 6, 2010Permit type: Intake | Permit status: Closed | Completion date: July 19, 2010 | Permit id: 2010-157736-000 | |||||
F7 pr#ww103 phase 2 glazing - 2nd fl, extension and new glazing on east elevation, willamette wharf Date: November 18, 2010Permit type: Intake | Permit status: Closed | Completion date: October 14, 2010 | Permit id: 2010-184595-000 | |||||
[20-jul-15] cancelled by kildufke. F7 pr#ww103 dfs - truss submittal Date: December 2, 2010Permit type: Intake | Permit status: Closed | Completion date: November 29, 2010 | Permit id: 2010-184595-Dfs | |||||
F6 hvac modifications for ti Date: August 1, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166602-000 | |||||
[20-jul-15] cancelled by kildufke. F6 2nd flr hallway relocation, doors, ceiling, elec, plbg mt, finishes Date: August 2, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166629-000 | |||||
[20-jul-15] cancelled by kildufke. F6 hvac for hallway relocation no new equipment duct and grille relocation only Date: August 2, 2012Permit type: Intake | Permit status: Closed | Completion date: July 30, 2012 | Permit id: 2012-166634-000 | |||||
[20-jul-15] cancelled by kildufke. F1 suite 2 ti partition walls for offices, breakroom, sink, ceiling, elec, plbg, mt, finishes sprinkler upgrade reqd per appeal Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 15, 2012 | Permit id: 2012-205724-000 | |||||
[20-jul-15] cancelled by kildufke. F1 new ductwork on existing hvac equipment, for ti work Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 15, 2012 | Permit id: 2012-205729-000 | |||||
[20-jul-15] cancelled by kildufke. Suite 2 cohen ti walls for offices, breakroom, sink, ceiling - power voice datapr# ww106 Date: November 20, 2012Permit type: Intake | Permit status: Closed | Completion date: November 20, 2012 | Permit id: 2012-207111-000 | |||||
[20-jul-15] cancelled by kildufke.#2 cohen - hvac controls pr# ww106 Permit type: Intake | Permit status: Closed | Completion date: November 28, 2012 | Permit id: 2012-209358-000 | |||||
[20-jul-15] cancelled by kildufke.#2 cohen - hvac controls pr# ww106 Permit type: Process management | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2012-209358-000 | |||||
[23-nov-15] cancel pending by kildufke. F9 suite 2 oregon wine board tenant remodel Date: December 27, 2012Permit type: Intake | Permit status: Closed | Completion date: December 13, 2012 | Permit id: 2012-215327-000 | |||||
[20-jul-15] cancelled by kildufke.#2 oregon wine board ti - pwr lvpr# ww 107 Date: December 17, 2012Permit type: Intake | Permit status: Closed | Completion date: December 17, 2012 | Permit id: 2012-215909-000 | |||||
[20-jul-15] cancelled by kildufke. F9 suites 2 & 2 otradi 12,0 sq ft office & incubator lab remodel new unisex restroom to be provided under separate permit as part of this project project includes non lss back up generator Date: March 4, 2013Permit type: Intake | Permit status: Closed | Completion date: December 26, 2012 | Permit id: 2012-218711-000 | |||||
[20-jul-15] cancelled by kildufke. F9 suites 2 & 2 otradi 12,0 sq ft office & incubator lab remodel - ductwork, new hps and 2 ervs on roof Date: March 4, 2013Permit type: Intake | Permit status: Closed | Completion date: December 26, 2012 | Permit id: 2012-218713-000 | |||||
[20-jul-15] cancelled by kildufke. F9 alter ductwork on existing equipment Date: December 27, 2012Permit type: Intake | Permit status: Closed | Completion date: December 27, 2012 | Permit id: 2012-218819-000 | |||||
[20-jul-15] cancelled by kildufke. F11 2nd floor accessible restroom Date: May 28, 2013Permit type: Intake | Permit status: Closed | Completion date: May 17, 2013 | Permit id: 2013-156147-000 | |||||
[20-jul-15] cancelled by kildufke. F11 2nd floor accessible restroom - new ductwork on existing equipment Date: May 28, 2013Permit type: Intake | Permit status: Closed | Completion date: May 17, 2013 | Permit id: 2013-156149-000 | |||||
[20-jul-15] cancelled by kildufke. F2 suite 270, 2nd flr, n side; partition walls for office, conference rooms, doors, ceiling, elec, plbg Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 3, 2013 | Permit id: 2013-162747-000 | |||||
[20-jul-15] cancelled by kildufke. F2 new ductwork on existing equipment Date: June 5, 2013Permit type: Intake | Permit status: Closed | Completion date: June 3, 2013 | Permit id: 2013-162748-000 | |||||
Ti - demo add walls to create additional office space - see structural & l s comments. Date: January 18, 2001Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: March 16, 2001 | Current use: Business | Permit id: 2000-194855-000 | |||||
Int. Walls reconfigured in office area at conference room Date: April 20, 2001Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: October 6, 2003 | Current use: Business | Permit id: 2001-135754-000 | |||||
Ti reconfigure interior walls (3 sets of plans) Date: May 7, 2001Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: October 1, 2003 | Current use: Business | Permit id: 2001-137900-000 | |||||
Structural repairs (wood) first floor, south wing entry courtyard Date: October 16, 2002Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 10, 2003 | Current use: Business | Permit id: 2002-146024-000 | |||||
Roof beam repair Date: February 21, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 10, 2003 | Current use: Business | Permit id: 2003-105814-000 | |||||
Roof beam repairs central section of east wall at the 2nd floor and roof. Date: May 29, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: February 9, 2004 | Current use: Business | Permit id: 2003-122854-000 | |||||
Ti - 37 s. F. Office remodel for new tennant (previously occ. W same use) separate alarm permit for strobes Date: August 26, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: October 3, 2003 | Current use: Business | Permit id: 2003-152927-000 | |||||
Expansion for existing tenant (ste 260) into suite 2 - paritions only Date: September 2, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: November 10, 2003 | Current use: Business | Permit id: 2003-156145-000 | |||||
Replace roof beams, footings and steel Date: July 19, 2004Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: December 28, 2004 | Current use: Business | Permit id: 2004-035679-000 | |||||
Int. Demo of partition walls Date: March 14, 2006Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 21, 2006 | Current use: Business | Permit id: 2006-115472-000 | |||||
Ti- 3rd floor office need to create bill, sign off pre-issuance and stamp plans Date: January 7, 2000Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 1, 2000 | Current use: Business | Permit id: 2000-124016-000 | |||||
Ti - construct new interior non bearing wall within existing tenant space. Continued office use. Maintain fully sprinkled under separate permit from fire marshals office. Date: March 3, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: March 17, 2003 | Current use: Business | Permit id: 2003-108767-000 | |||||
Enclose elevator lobby and access control exit doors at third floor offices. Date: February 18, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: April 23, 2003 | Current use: Business | Permit id: 2003-106774-000 | |||||
46 sw macadam--phase ii (south end) of 1st flr ti--pcg--plans include hvac permit dwngs for all of 1st flr. Date: May 19, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 27, 2003 | Current use: Business | Permit id: 2003-119884-000 | |||||
Interior ti for new tenant office space - 1st floor - north Date: May 9, 2003Client: Southwest Neighborhoods, Inc. | Permit type: Alteration | Permit status: Final | Completion date: June 27, 2003 | Current use: Business | Permit id: 2003-119429-000 |