ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Installation of a flush mount 3. 25 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications requiredapproved under this permit. Contractor to maintain 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Date: June 6, 2014 Contractor: Solarcity CorporationClient: Laurance Hubbard | Applicant: Solarcity Corporation | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 19, 2014 | Current use: Single family d | |||||
SCORE 95 Installation of a flush mount 3. 25 kw photovoltaic system. Array to be parallel to roof plane, grid tied and remain below ridge, inside below hips and rake edges and above eave. See engineerfoots letter and or drawing(s) for specific information. No structural modifications requiredapproved under this permit. Contractor to maintain 12inch of space between the ridge and panels parallel to ridge along the length of the ridge and on either side of the ridge. A 30inch pathway must be provided at the edge of the roof, perpendicular to the ridge on one side only. Client: Laurance Hubbard | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-02662 |