Demolition/rebuild bond tracking #ps12a46131 Date: March 15, 2012Permit type: Demolition or move p | Permit status: Completed | Completion date: May 4, 2012 | Current use: Single family dwelling | Permit id: 588408 | |||||
Mechanical permit Date: June 6, 2012Permit status: Finaled | Completion date: November 13, 2012 | Current use: Single family dwelling | Permit id: 601083 | |||||
Deck Date: January 8, 2013 Value: $14,000Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 622745 | |||||
Referback to edgemoore, #589448 Date: March 15, 2012 Value: $300,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 589232 | |||||
Temporarily place a dumpster/pods within the public right of way. The permittee agrees to hold montgomery county harmless from any liability associated with the placement of dumpsters/pods in the public right of way. Dumpster/pods locations, barricades and/or lights are to be placed as directed by the dps inspector. Pods placed for more than 7 days must comply with building setback requirement and permit. Date: May 15, 2012Permit type: Public right of way | Permit status: Completed | Current use: Dumpster | Permit id: 274365 | |||||
Dnr permit is required for tree removal. Construct mc-301. 01 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: February 17, 2012Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 272642 | |||||
Bore roadway, dig and backfill trench, build conduit, and replace and install cable and associated equipment in accordance with pepco plan no. 3377750. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: June 27, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 275763 | |||||
Install gas service in accordance with washington gas plan no. 141619. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: March 6, 2012Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 272875 | |||||
Place splice & test fttp facilities buried under chesnut st (row) adajacent to 4514 chesnut st buried fiber optic cable facilities in accordance with verizon plan no. 8a07965 fios . Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 18, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 335309 |