ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Customer wants to use eplans interior work only,install (49) solar panels mounted flush to roof Date: February 22, 2016 Value: $26,117Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 736694 | |||||
Existing residential - 1 story addition - relocating meter box, rough wiring, lighting fixtures, and smoke detectors permit revised12/09/2013 - temp pole service for construction added Date: December 5, 2013Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 657194 | |||||
Existing residential - 1 story addition- (50) rough wiring, (40) lighting fixtures, & (8) single station smoke detectors Date: July 17, 2015Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 720681 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Date: March 1, 2016Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 745586 | |||||
Mechanical permit Date: July 9, 2015Permit status: Finaled | Current use: Single family dwelling | Permit id: 719578 | |||||
1 story additon revision 04/22/2014 structural Date: November 27, 2013 Value: $25,000Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 651029 | |||||
Replacegas service in accordance with washington gas plan no. 390515. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: October 21, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 321670 | |||||
Replace gas service... 4x5 roadway cut over main, gas service in accordance with washington gas plan no. 313175. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 11, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 326569 |