ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo Date: August 12, 2015Permit type: Demolition or move p | Permit status: Issued | Current use: Single family dwelling | Permit id: 707295 | |||||
Electrical permit Date: October 15, 2015Permit status: Issued | Current use: Single family dwelling | Permit id: 732507 | |||||
New unit Date: November 4, 2015Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 734895 | |||||
Rebuild Date: August 12, 2015 Value: $375,000Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 707296 | |||||
Install service connection via directional boring under roadway in accordance with verizon plan no. 8a02561. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: June 23, 2016Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 353135 | |||||
Install gas service in accordance with washington gas plan no. 634338. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: November 4, 2015Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 348993 | |||||
This is a dual permit. Dw permit (residential) construct mc-301. 05 type driveway in accordance with montgomery county standards and specifications. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Roadside tree plan involves removal of one 4" diameter zelkova and protection of one 3" diameter zelkova, no replants and a 7 tree removal/in lieu fee. Dnr permit on file
Date: August 12, 2015Permit type: Public right of way | Permit status: Issued | Current use: Driveway | Permit id: 333850 | |||||
Make pole a urd cable pole. Bore across roadway. Make a 1by1 road cut to check for other utilities. And associated equipment inaccordance with pepco plan no. 3494727. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 4, 2015Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 350413 |