ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition or move p Date: January 13, 2004Permit status: Completed | Completion date: January 6, 2005 | Current use: Single family dwelling | Permit id: 326623 | |||||
Bldg #326621 Date: April 1, 2004Permit type: Electrical permit | Permit status: Finaled | Completion date: September 29, 2005 | Current use: Single family dwelling | Permit id: 339437 | |||||
Electrical permit Date: March 17, 2005Permit status: Finaled | Completion date: September 28, 2005 | Current use: Single family dwelling | Permit id: 376902 | |||||
Building residential Date: February 3, 2004 Value: $400,000Permit status: Finaled | Completion date: September 28, 2005 | Current use: Single family dwelling | Permit id: 326621 | |||||
On chestnut street (house #4400) install 2 inch plastic service in accordance with washington gas plan no. 73113. Construct utility pavement patch in kind as directed by the inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Date: March 9, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 234726 | |||||
Dw permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 driveway to come off of lynnbrook drive. Date: December 19, 2003Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 225694 | |||||
On chestnut street (house #4400) heavy-up overhead wires, install 4 amp underground service by directional bore, dig and backfill trench, build conduit, install cable and associated equipment in accordance with pepco plan no. 53088482. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Repair existing sidewalk and paving as directed. Pre-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Date: June 23, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 237544 |