| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Pbot pw permit Permit type: Intake pw | Permit status: Not reqd | Completion date: April 14, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Intake pw | Permit status: Assigned | Completion date: March 25, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Not reqd | Completion date: March 29, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Received | Completion date: March 23, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Accepted for review | Completion date: March 25, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Pre-design pw | Permit status: Billed | Completion date: March 29, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Utility review - all | Permit status: No additional review | Completion date: April 14, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Plan review pw | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2015-138241-000 | |||||
Pbot pw permit Permit type: Pre-issuance pw | Permit status: Not reqd | Completion date: March 29, 2015 | Permit id: 2015-138241-000 | |||||
This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,2 sf concrete building. Permit type: Land use review | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 2015-185472-000 | |||||
This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,2 sf concrete building. Permit type: Land use review | Permit status: Closed | Completion date: June 18, 2015 | Permit id: 2015-185472-000 | |||||
This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,2 sf concrete building. Permit type: Site development | Permit status: No concerns | Completion date: June 30, 2015 | Permit id: 2015-185472-000 | |||||
This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,2 sf concrete building. Permit type: Environmental services | Permit status: Response sent | Completion date: June 25, 2015 | Permit id: 2015-185472-000 | |||||
This project consists of a renovation of an existing three-story building with basement and construction of a new nine story , 44,2 sf concrete building. Permit type: Transportation | Permit status: Response sent | Completion date: June 29, 2015 | Permit id: 2015-185472-000 | |||||
Application Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-000 | |||||
Partial - foundation to grade Permit type: Application | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - foundation to grade Permit type: Issuance/intake | Permit status: Intake | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Mold, sanitation, holes in ceiling, peeling paint. Chapter 13 (sy area) Date: September 30, 2015Permit type: Request | Permit status: Closed | Completion date: May 17, 2007 | Permit id: 2007-130379-000 | |||||
It is the decision of the landmarks commission to approve historic resource review for the following exterior alterations to the grove hotel, a contributing structure in the new chinatown/japantown historic district located in the river district subdistrict of the central city plan district. The proposal includes the following, with conditions of approval a and b: the renovation of the three-story, 19,4 square foot, original grove hotel structure facing w. Burnside; the replacement of its one-story, 4,8 square foot theater addition facing nw 4th with a new nine-story, approximately 45,5 square foot addition, making a total project size of approximately 65,0 square feet; the ground floor of the 112 room hotel containing retail, restaurant and a service entry in the existing structure on w. Burnside, and hotel lobby and back of house in the new addition on nw 4th; a bar and roof deck on the ninth floor of the new addition; no proposed loading or parking; long term bike parking in the ba Date: November 17, 2015Permit type: Land use review | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 2015-185472-000 | |||||
Application Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-000 | |||||
Partial - interior non-structural demolition of south sro portion of the building and demolition to grade of the north one-story portion of the building. Date: April 5, 2016Permit type: Application | Permit status: Approved w/ cond | Completion date: March 31, 2016 | Permit id: 2015-189938-Dmo | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Application | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Issuance/intake | Permit status: Intake | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: December 7, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: April 22, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Planning and zoning | Permit status: Approved | Completion date: December 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Required | Completion date: August 10, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Life safety | Permit status: Approved | Completion date: October 26, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Life safety | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Required | Completion date: August 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Required | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Commercial plumbing | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Special inspections review | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Special inspections review | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Fire bureau | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Fire bureau | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: November 4, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: November 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: July 28, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Not reqd | Completion date: July 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Approved | Completion date: April 2, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Water bureau review | Permit status: Approved | Completion date: August 5, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Water bureau review | Permit status: Approved | Completion date: November 17, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Parks bureau | Permit status: Approved | Completion date: August 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Issuance | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Public works | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2015-189938-Fnd | |||||
It is the decision of the landmarks commission to approve historic resource review for the following exterior alterations to the grove hotel, a contributing structure in the new chinatown japantown historic district located in the river district subdistrict of the central city plan district. The proposal includes the following, with conditions of approval a and b: the renovation of the three-story, 19,4 square foot, original grove hotel structure facing w. Burnside; the replacement of its one-story, 4,8 square foot theater addition facing nw 4th with a new nine-story, approximately 45,5 square foot addition, making a total project size of approximately 65,0 square feet; the ground floor of the 112 room hotel containing retail, restaurant and a service entry in the existing structure on w. Burnside, and hotel lobby and back of house in the new addition on nw 4th; a bar and roof deck on the ninth floor of the new addition; no proposed loading or parking; long term bike parking in the ba Date: November 17, 2015Permit type: Land use review | Permit status: Completed | Completion date: June 15, 2015 | Permit id: 2015-185472-000 | |||||
Application Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-000 | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Application | Permit status: Approved | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Issuance/intake | Permit status: Intake | Completion date: June 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: December 7, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: December 22, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: April 14, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Process management | Permit status: Closed | Completion date: April 22, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Planning and zoning | Permit status: Approved | Completion date: December 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Site development | Permit status: Required | Completion date: August 10, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Life safety | Permit status: Approved | Completion date: October 26, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Life safety | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Approved | Completion date: September 25, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Required | Completion date: August 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Structural | Permit status: Required | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Commercial plumbing | Permit status: Approved | Completion date: September 21, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Special inspections review | Permit status: Approved | Completion date: September 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Special inspections review | Permit status: Approved | Completion date: November 18, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Fire bureau | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Fire bureau | Permit status: Approved | Completion date: April 15, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: November 4, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: November 30, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Environmental services | Permit status: Approved | Completion date: July 28, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Not reqd | Completion date: July 29, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Approved | Completion date: April 2, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Transportation | Permit status: Closed | Completion date: July 8, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Water bureau review | Permit status: Approved | Completion date: August 5, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Water bureau review | Permit status: Approved | Completion date: November 17, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Parks bureau | Permit status: Approved | Completion date: August 13, 2015 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Issuance | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2015-189938-Fnd | |||||
Partial - existing building: demolish north theater addition (portion of building within the new tower footprint) and basement level, ground level, second level + third level- existing slab on grade, existing non-structural partitions, ceilings, finishes, etc. New footings for new shear walls. Install new basement level slab (new lower elevation). New shear walls. Existing and new addition underground utilities: water, sanitary, storm, electrical piping. New addition foundation (foundation = below grade plus ground floor slab): new shoring- steel soldier piles + lagging, tiebacks, and shotcrete. Matt slab on rammed aggregate piers foundation (geopiers). Basement foundation walls- shoring becomes permanent basement foundation walls. Basement level cast-in-place concrete columns. Ground level pt slab (entry level at grade). Permit type: Public works | Permit status: Closed | Completion date: April 2, 2016 | Permit id: 2015-189938-Fnd |