ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Unit building. All units under 10 sqft - oar 918 reduced fees apply only to residential units. Date: February 26, 2015Permit type: Intake | Permit status: Closed | Completion date: November 26, 2014 | Permit id: 2014-242954-000 | |||||
Elevator vent w/mod interlocked w/ef, ductless splits for apartments and common spaces, 2 cfm supply ventilation to basement fitness room interlocked w/lights supplied within 12 of fan coil return, unit bath fans in boxed in joist, dryer and kitchen exhausts, exhaust in bike, trash and elevator machine room, plans w/co Date: March 26, 2015Permit type: Intake | Permit status: Closed | Completion date: March 26, 2015 | Permit id: 2015-140397-000 | |||||
3-31-15 noise complaint - construction before 7am Permit type: Request | Permit status: Closed | Completion date: March 31, 2015 | Permit id: 2015-142770-000 | |||||
Alarm-21 unit apartment building, central station fire alarm with one retail space at ground level. Date: April 9, 2015Permit type: Intake | Permit status: Approved | Completion date: April 7, 2015 | Permit id: 2015-146160-000 | |||||
Sani & storm: 247 of 8 vsp public combo sewer main, approx. D=11, in n mississippi ave. Contr to connect to existing branch with storm wye connection @ curb w/cleanout per std p-262 & p-257 (approx l= and d=12) 169 from ds smh (aaq438). Contr to verify depth/location/proper slope in the field. Date: June 24, 2015Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191404-000 | |||||
New 3-story, 20-unit apartment building with (1) retail unit on street/basement level; eco-roof. Date: November 8, 2013Permit type: Application | Permit status: Approved | Completion date: November 28, 2012 | Permit id: 2012-209342-000 | |||||
Dfs - ats holddown system Date: January 16, 2015Permit type: Application | Permit status: Approved | Completion date: August 27, 2014 | Permit id: 2012-209342-Dfs | |||||
Dfs for roof truss system Date: January 14, 2015Permit type: Application | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2012-209342-Dfs | |||||
Revisions to elevator shaft height, insulation and other architectual details. Also, revised stuructual analysis Date: May 8, 2015Permit type: Application | Permit status: Approved | Completion date: September 26, 2014 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Application | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Issuance/intake | Permit status: Intake | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Process management | Permit status: Closed | Completion date: April 22, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Process management | Permit status: Closed | Completion date: June 16, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Process management | Permit status: Closed | Completion date: July 1, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Planning and zoning | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Life safety | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Structural | Permit status: Approved | Completion date: May 28, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Commercial plumbing | Permit status: Approved | Completion date: May 1, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Environmental services | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Permit type: Transportation | Permit status: Not reqd | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Demolish single family residence with basement, cap sewer, remove all debris - site grading & removal of encroachments from southern property are not included - see 12-209342 co comments decommissioning required septic decommissioning required. Call for inspection 842. Date: November 8, 2013Permit type: Application | Permit status: Approved | Completion date: January 4, 2013 | Permit id: 2013-101023-000 | |||||
Setting temporary power Date: December 12, 2013Permit type: Intake | Permit status: Closed | Completion date: December 12, 2013 | Permit id: 2013-237636-000 | |||||
Plumbing for 20 1 unit apt building Date: May 20, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157022-000 | |||||
8-15-14 noise complaint - construction before 7am Permit type: Request | Permit status: Closed | Completion date: August 15, 2014 | Permit id: 2014-199384-000 | |||||
8-15-14 noise complaint - construction before 7am Permit type: Request | Permit status: Closed | Completion date: January 20, 2015 | Permit id: 2014-199384-000 | |||||
247 of 8 vsp public combo sewer main in n mississippi ave. Bom to install 8x 6 tee & contractor provide new 6 branch with 6x6 wye at curbline for separated sanitary & storm lines to property. Main approx 11 deep. Contr to verify depth/location/proper slope in the field. Date: August 20, 2014Permit type: Intake | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-201303-000 | |||||
Install sanitary sewer on property Date: August 20, 2014Permit type: Intake | Permit status: Closed | Completion date: August 20, 2014 | Permit id: 2014-201323-000 | |||||
Sprinkler - new sprinkler system following nfpa 13, new building Date: December 1, 2014Permit type: Intake | Permit status: Approved | Completion date: September 30, 2014 | Permit id: 2014-219002-000 | |||||
Tenant improvement for first time coffee shop tenant at basement level of apartment building, restrooms and wall insulation were part of shell permit (12-209342co) ti includes bar area, plumbing equipment and seating area Date: July 31, 2015Permit type: Application | Permit status: Approved | Completion date: July 27, 2015 | Permit id: 2015-207295-000 | |||||
Adding grease trap, (2) floor sinks, (1) floor drain for new coffee shop. Date: July 28, 2015Permit type: Intake | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-207580-000 | |||||
Street tree planting permit Date: September 16, 2015Permit type: D - permit request | Permit status: Permit issued | Completion date: September 16, 2015 | Permit id: 2015-222448-000 | |||||
New non-illuminated 4. 125 s. F. Projecting sign, west elevation. Date: February 5, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-112137-000 | |||||
Revision change shoring from steel plate lagging to timber lagging Date: March 19, 2014Permit type: Application | Permit status: Approved | Completion date: February 27, 2014 | Permit id: 2012-209342-Rev | |||||
Value added revision to remove 6 balconies and french doors and replace with windows; divide larger dwelling unit on 3rd floor to create 21st dwelling unit, accessible Date: July 31, 2015Permit type: Application | Permit status: Approved | Completion date: April 17, 2015 | Permit id: 2012-209342-Rev | |||||
Plumbing for 20+1 unit apt building Date: May 20, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157022-000 | |||||
Unit building. All units under 10 sqft - oar 918 reduced fees apply only to residential units. Faxed Date: February 26, 2015Permit type: Intake | Permit status: Closed | Completion date: November 26, 2014 | Permit id: 2014-242954-000 | |||||
Temp service, 2 amp. Date: December 10, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 6, 2015 | Permit id: 2014-247730-000 | |||||
Low voltage fire alarm system. Date: March 18, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: August 4, 2015 | Permit id: 2015-136251-000 | |||||
New 3-story, 20-unit apartment building with (1) retail unit on street basement level; eco-roof. Date: November 8, 2013Permit type: Application | Permit status: Approved | Completion date: November 28, 2012 | Permit id: 2012-209342-000 | |||||
Elevator vent w mod interlocked w ef, ductless splits for apartments and common spaces, 2 cfm supply ventilation to basement fitness room interlocked w lights supplied within 12 of fan coil return, unit bath fans in boxed in joist, dryer and kitchen exhausts, exhaust in bike, trash and elevator machine room, plans w co Date: March 26, 2015Permit type: Intake | Permit status: Closed | Completion date: March 26, 2015 | Permit id: 2015-140397-000 | |||||
Sani & storm: 247 of 8 vsp public combo sewer main, approx. D=11, in n mississippi ave. Contr to connect to existing branch with storm wye connection @ curb w cleanout per std p-262 & p-257 (approx l= and d=12) 169 from ds smh (aaq438). Contr to verify depth location proper slope in the field. Date: June 24, 2015Permit type: Intake | Permit status: Closed | Completion date: June 24, 2015 | Permit id: 2015-191404-000 | |||||
Demo detached garage Date: April 8, 2003Client: Northeast Coalition Of Neighbors | Permit type: Demolition | Permit status: Final | Completion date: June 9, 2003 | Current use: Garage/carport | Permit id: 2003-114515-000 | |||||
Remodel bathroom & kitchen - add ckts 6 20 03 comments add 9 plmg fixtures 6 24 03 circuits transferred to new permit 03-145489 et per contractor 07-07-03 Date: May 22, 2003Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: October 28, 2003 | Current use: Single family dwelling | Permit id: 2003-121809-000 |