ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Water heater replacement Date: December 6, 2012Permit id: Plm2012-02411 | |||||
Gas appliance replacement Date: November 5, 2009Permit id: Mec2009-01432 | |||||
Exterior work; install torch down rubber roof over existing main roof as per code. Date: September 9, 2009 Value: $1,100Permit id: Com2009-21055 | |||||
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Ri Date: May 9, 2007 Value: $250,000Permit id: Com2007-00203 | |||||
Upgrade existing service to 1 amps and install (7) circuits. As per code. Date: June 14, 2006 Value: $1,400Permit id: Com2006-18211 | |||||
Increased service equipment from 30amps -1 volt to 100amp-2 volt added 6- 1 volt ckts bge meter#1443190. 1 meter Date: June 8, 2006 Value: $1,098Permit id: Com2006-15856 | |||||
Upgrade existing service to 1 amps and install 6 ckts Date: April 20, 2005 Value: $1,400Permit id: Com2005-11054 | |||||
Install 1 amp service 7ckts in the portion known as 4359 parkton st. Date: December 16, 2002 Value: $1,200Expiration date: June 16, 2003 | Permit id: Com2002-17817 | |||||
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Riparian buffer establishment is proposed. In addition ball fields adjacent to the stream will be re-graded and re-aligned. As per plans as per code. 25. Filing fees credited from com2006-01477 paid on 01/18/07 per peggy white on 04/24/07 Date: May 9, 2007 Value: $250,000Expiration date: May 9, 2008 | Permit id: Com2007-00203 | |||||
The maidens choice run (mc-10) ecosystem resoration project includes bank grading to establish adequate floodplain access the installation of bank protection and grade control sturctures where necessary to stabilize the stream channel banks and bed. Riparian buffer establishment is proposed. In addition ball fields adjacent to the stream will be re-graded and re-aligned. As per plans as per code. 25. Filing fees credited from com2006-01477 paid on 01 18 07 per peggy white on 04 24 07 Date: May 9, 2007 Value: $250,000Expiration date: May 9, 2008 | Permit id: Com2007-00203 |