Installation of a camera system for the crane booth. Date: February 3, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2015-114024-000 | |||||
Addition of interior foundation for machine Date: March 11, 2015Permit type: Application | Permit status: Approved | Completion date: March 11, 2015 | Permit id: 2015-132023-000 | |||||
Addition of interior foundation for dryer machine. Separate permit required for installation of mechanical equipment attached to foundation. This permit is for concrete foundation only. Date: March 17, 2015Permit type: Application | Permit status: Approved | Completion date: March 17, 2015 | Permit id: 2015-134704-000 | |||||
Addition of interior 104 x 27 foundation for plasma cutter. Date: April 24, 2015Permit type: Application | Permit status: Approved | Completion date: April 24, 2015 | Permit id: 2015-156793-000 | |||||
Infrared paint curing booth, self contained, structural details attached. Date: June 9, 2015Permit type: Intake | Permit status: Approved | Completion date: May 21, 2015 | Permit id: 2015-173904-000 | |||||
Field wire infrared oven. Date: June 1, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: July 1, 2015 | Permit id: 2015-178934-000 | |||||
Install (1) 100a and (1) 60a 480v circuits, and (4) 20a 120v circuits for two press brakes. Faxed Date: June 30, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2014-176942-000 | |||||
One 2 amp 4 volt feeder for new whitney punch Date: August 22, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: August 25, 2014 | Permit id: 2014-202050-000 | |||||
New gas furnace. 15 psi, 2 inch sch. Metalic gas piping on exterior of bldg. From meter to furnace. Max pressure inside bldg is 5 psi. Pressure test to minimum psi. Date: August 26, 2015Permit type: Intake | Permit status: Approved | Completion date: August 26, 2015 | Permit id: 2015-225642-000 | |||||
Addition of interior equipment foundation for acurpress Date: September 8, 2015Permit type: Application | Permit status: Approved | Completion date: September 8, 2015 | Permit id: 2015-232605-000 | |||||
Private hydrant - relocate (e) hydrant Date: October 29, 2015Permit type: Intake | Permit status: Approved | Completion date: October 29, 2015 | Permit id: 2015-257957-000 | |||||
Equipment slab/ foundation Date: February 17, 2016Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120402-000 | |||||
269 of 18 csp storm sewer in nw front ave. Contractor to prepare trench for bom to install 12 tap into manhole, contractor to install 12 pvc storm line from tap to property per rules of connection. Contractor to verify in field. Date: September 24, 2009Permit type: Intake | Permit status: Closed | Completion date: September 24, 2009 | Permit id: 2009-160185-000 | |||||
Equipment slab foundation Date: February 17, 2016Permit type: Application | Permit status: Approved | Completion date: February 12, 2016 | Permit id: 2016-120402-000 | |||||
Replace storm damaged roof in bay 1, @370 sf (guardrails must be constructed to osha standards.) bldg is known as bay one Date: March 3, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 16, 2005 | Current use: Factory/industrial | Permit id: 2004-005496-000 | |||||
Demo approx ft of half height partition walls and replace with new non-load bearing full size partition walls w windows to create two office rooms in main office area. Date: March 5, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 30, 2004 | Current use: Business | Permit id: 2004-009516-000 | |||||
Build 225 sf covered pad for groundwater mediation equipment. See related work reviewed under exempt process in 04-010583-pj. Date: June 21, 2004Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: July 7, 2004 | Current use: Utility | Permit id: 2004-009882-000 | |||||
Rebuild storm drain with storm filter - revised main permit for storm drainage only Date: July 29, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Business | Permit id: 2004-035366-000 | |||||
New metal building, offices on second floor, bottom floor restrooms, lunchroom, showers, etc - 3 packages in submittal, engineered steel bldg and detail package separate from architectural and trade plans Date: November 15, 2005Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: June 2, 2006 | Current use: Business | Permit id: 2005-137335-000 | |||||
Remove sliding door. Modify opening and install new coiling door. Date: March 6, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 21, 2008 | Current use: Business | Permit id: 2008-113703-000 | |||||
Parking lot upgrades for landscaping, storm water management and landscape screening required for zoning non-conforming upgrades. Date: August 11, 2009Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 10, 2010 | Current use: Factory/industrial | Permit id: 2008-125133-000 | |||||
Remove (e) asphalt floor and replace w 6" conc slab floor Date: June 18, 2008Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Under inspection | Current use: Factory/industrial | Permit id: 2008-138492-000 | |||||
New fuel tank cover with habitat roof Date: October 6, 2010Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: April 19, 2011 | Current use: Hazardous | Permit id: 2010-163846-000 | |||||
New canopy with habitat roof for temporary storage of waste materials Date: July 22, 2011Client: Neighbors West Northwest | Permit type: New construction | Permit status: Final | Completion date: January 27, 2012 | Current use: Hazardous | Permit id: 2011-154483-000 | |||||
New 25 ft x 63 ft slab for equipment within existing building Date: November 20, 2012Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 17, 2013 | Current use: Factory/industrial | Permit id: 2012-201043-000 | |||||
Remove metal roof on existing canopy behind admin building in front of maintenance shop, add additional purlins and new metal roof. Build new 22 x 28 canopy on west side of existing canopy. Date: August 3, 2012Client: Neighbors West Northwest | Permit type: Addition | Permit status: Final | Completion date: June 27, 2013 | Current use: Factory/industrial | Permit id: 2012-154814-000 | |||||
Demo qa building on large industrial lot Date: October 22, 2013Client: Neighbors West Northwest | Permit type: Demolition | Permit status: Final | Completion date: November 22, 2013 | Current use: Factory/industrial | Permit id: 2013-217916-000 | |||||
Add 25 x 75 foundation for new robotic equipment Date: July 26, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: August 21, 2013 | Current use: Factory/industrial | Permit id: 2013-184984-000 | |||||
New jib crane foundation in building Date: July 9, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 13, 2013 | Current use: Factory/industrial | Permit id: 2013-176697-000 | |||||
New concrete slab for equipment relocation Date: October 8, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 29, 2014 | Current use: Factory/industrial | Permit id: 2013-208897-000 | |||||
New footing for relocation of air receiver tank Date: April 1, 2014Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 6, 2014 | Current use: Factory/industrial | Permit id: 2014-133698-000 | |||||
Sawcut and remove existing concrete fl; excavate as needed for footing; new concrete footing for new robot; interior installation Date: November 18, 2016Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Under inspection | Current use: Factory/industrial | Permit id: 2016-275377-000 | |||||
Repair wood dock structure for existing petroleum piping. Date: December 6, 2001Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Factory/industrial | Permit id: 2001-168334-000 | |||||
Add partition walls in 1st floor office and change access door location Date: June 26, 2003Permit type: Alteration | Permit status: Final | Completion date: January 26, 2005 | Current use: Business | Permit id: 2003-143876-000 | |||||
Demo 50 sf 2 story, existing office bldg Date: November 3, 2005Permit type: Demolition | Permit status: Final | Completion date: May 18, 2006 | Current use: Business | Permit id: 2005-171214-000 | |||||
Add partition wall, to create passage way Date: August 30, 2006Permit type: Alteration | Permit status: Final | Completion date: October 3, 2006 | Current use: Business | Permit id: 2006-158625-000 | |||||
Addition of new ceiling to existing structure for better air flow Date: January 29, 2008Permit type: Alteration | Permit status: Final | Completion date: July 31, 2008 | Current use: Factory/industrial | Permit id: 2008-105483-000 | |||||
Craneway #4 - remove existing overhead door, modify opening & install new door Date: May 11, 2010Permit type: Alteration | Permit status: Final | Completion date: October 4, 2010 | Current use: Factory/industrial | Permit id: 2010-114758-000 | |||||
Demolition of rigging loft building, 25x75 Date: December 18, 2012Permit type: Demolition | Permit status: Final | Completion date: January 30, 2013 | Current use: Storage | Permit id: 2012-216803-000 |