ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Approval of an adjustment to code section 33. 266. 110, to waive the requirement for an on-site parking space and also, approval of an adjustment, to code section 33. 110. 220, to reduce the side setback for the structure from 5 feet to 3 feet, 8 inches to the east wall and from 4 feet to 2 feet for the roof eave, in general compliance with the approved site plan and elevation drawings, exhibits c-1 and c-2, signed and dated march 27, 2014, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition (b) must be noted on each of the 4 required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page - case file lu 13-242201 ad. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. As a condition of approval for the waiver of the required on-site par Date: March 28, 2014Permit type: Land use review | Permit status: Completed | Completion date: December 31, 2013 | Permit id: 2013-242201-000 | |||||
14. 0857 service change meter and panel change. Date: October 17, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 21, 2014 | Permit id: 2014-226965-000 |