ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Main water service pipe & backflow prevention device Date: June 2, 2011Permit id: Plm2011-01350 | |||||
"concrete slab; 6x15 at front of property. 4"" #57 gravel 3"" concrete slab 2"" bluestone veneer. Using for patio with no footer. Work per code and sketch." Date: May 6, 2011Permit id: Com2011-10041 | |||||
"exterior work - removal of existing south fence and replacing with new 6 cedar fence 113 linear feet. Removal of existing retaining wall replaced by 45 sq ft retaining wall. Retaining wall is 18"" tall x 18ft long. Wood fence above retaining wall not t" Date: April 25, 2011 Value: $9,000Permit id: Com2011-09062 | |||||
"original permit description:(com2007-37718)o/k per bmza 148-07 app2-20-07demolish a one story rear addition 148""x88"". Construct a one story rear addition 148""x98"". Replace windows and doors same size same location. Construct fire wall in attic two" Date: March 13, 2009Permit id: Com2009-05847 | |||||
Original permit description:(com2008-00627)add new 100amp panel rewire house add 3 new low voltage as per code. Date: March 11, 2009Permit id: Com2009-05590 | |||||
Original permit description:(com2007-37459)remove old duct workinstall new duct work as per code Date: March 10, 2009Permit id: Com2009-05106 | |||||
Original permit description:(com2007-37907)reconstruct waste & water for new 1st floor powder room new kitchen and 2nd floor bathroom. Run gas line for new hotwater heater furnace and stove. Install new laundry tray in basement Date: March 10, 2009Permit id: Com2009-05492 | |||||
Add new 100amp panel rewire house add 3 new low voltage as per code. Date: January 14, 2008 Value: $6,000Permit id: Com2008-00627 | |||||
Reconstruct waste & water for new 1st floor powder room new kitchen and 2nd floor bathroom. Run gas line for new hotwater heater furnace and stove. Install new laundry tray in basement Date: December 13, 2007 Value: $8,000Permit id: Com2007-37907 | |||||
"o/k per bmza 148-07 app2-20-07demolish a one story rear addition 148""x88"". Construct a one story rear addition 148""x98"". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall" Date: December 12, 2007 Value: $10,000Permit id: Com2007-37718 | |||||
Remove old duct workinstall new duct work as per code Date: December 10, 2007 Value: $4,550Permit id: Com2007-37459 | |||||
Original permit description:(com2007-37718)o/k per bmza 148-07 app2-20-07demolish a one story rear addition 148"x88". Construct a one story rear addition 148"x98". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall ceilings. Insulation in attic and party wall. New kitcehn cabinets. Install (2) 5/8" sheetrock for one hour fire separation between 2nd floor and attic. Remove portion of non load bearing wall near staircase. As per code. Date: March 13, 2009Expiration date: April 13, 2009 | Permit id: Com2009-05847 | |||||
Exterior work - removal of existing south fence and replacing with new 6 cedar fence 113 linear feet. Removal of existing retaining wall replaced by 45 sq ft retaining wall. Retaining wall is 18" tall x 18ft long. Wood fence above retaining wall not to exceed 6" total. Underdrain behind wall. As per sketch & as per code. Date: April 25, 2011 Value: $9,000Expiration date: October 25, 2011 | Permit id: Com2011-09062 | |||||
O/k per bmza 148-07 app2-20-07demolish a one story rear addition 148x88". Construct a one story rear addition 148"x98". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall ceilings. Insulation in attic and party wall. New kitcehn cabinets. Install (2) 5/8" sheetrock for one hour fire separation between 2nd floor and attic. Remove portion of non load bearing wall near staircase. As per code." Date: December 12, 2007 Value: $10,000Expiration date: June 12, 2008 | Permit id: Com2007-37718 | |||||
Concrete slab; 6x15 at front of property. 4" #57 gravel 3" concrete slab 2" bluestone veneer. Using for patio with no footer. Work per code and sketch. Date: May 6, 2011Expiration date: November 6, 2011 | Permit id: Com2011-10041 | |||||
O/k per bmza 148-07 app2-20-07demolish a one story rear addition 148"x88". Construct a one story rear addition 148"x98". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall ceilings. Insulation in attic and party wall. New kitcehn cabinets. Install (2) 5/8" sheetrock for one hour fire separation between 2nd floor and attic. Remove portion of non load bearing wall near staircase. As per code. Date: December 12, 2007 Value: $10,000Expiration date: June 12, 2008 | Permit id: Com2007-37718 | |||||
O k per bmza 148-07 app2-20-07demolish a one story rear addition 148"x88". Construct a one story rear addition 148"x98". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall ceilings. Insulation in attic and party wall. New kitcehn cabinets. Install (2) 5 8" sheetrock for one hour fire separation between 2nd floor and attic. Remove portion of non load bearing wall near staircase. As per code. Date: December 12, 2007 Value: $10,000Expiration date: June 12, 2008 | Permit id: Com2007-37718 | |||||
Original permit description:(com2007-37718)o k per bmza 148-07 app2-20-07demolish a one story rear addition 148"x88". Construct a one story rear addition 148"x98". Replace windows and doors same size same location. Construct fire wall in attic two new closets new floor in bathroom drywall ceilings. Insulation in attic and party wall. New kitcehn cabinets. Install (2) 5 8" sheetrock for one hour fire separation between 2nd floor and attic. Remove portion of non load bearing wall near staircase. As per code. Date: March 13, 2009Expiration date: April 13, 2009 | Permit id: Com2009-05847 |