Tenant improvement for new office tenant in west portion of ground floor, new interior partitions and finishes to create offices, restrooms, breakroom, install new skylights. Partial change of occupancy from f-1 to b. See 11-186947-co and 12-128942-co for shell improvements and seismic upgrade. Date: January 30, 2015Permit type: Application | Permit status: Approved | Completion date: November 19, 2014 | Permit id: 2014-239787-000 | |||||
Interior remodel Date: January 28, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2015-111333-000 | |||||
One 2-ton, one 5-ton, one 6-ton and one 7. 5-ton gas packs, two 1. 5t heat pump splits, gas piping, ductwork exhaust fans, structural on co and attached Date: February 3, 2015Permit type: Intake | Permit status: Closed | Completion date: February 3, 2015 | Permit id: 2015-114141-000 | |||||
Removing fixtures from ceiling,so new ceiling can be installed, and then putting them back in same locations. Note: contractors ph# 503-729-7352 Date: February 3, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: March 11, 2015 | Permit id: 2015-114223-000 | |||||
Je dunn office ti Date: February 5, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: April 6, 2015 | Permit id: 2015-114776-000 | |||||
Sprinkler - add, delete, relocate (39) sprinklers for ti Date: March 3, 2015Permit type: Intake | Permit status: Approved | Completion date: February 9, 2015 | Permit id: 2015-116753-000 | |||||
Alarm-add nac panel and alarm notification for office ti Date: March 18, 2015Permit type: Intake | Permit status: Approved | Completion date: March 4, 2015 | Permit id: 2015-128784-000 | |||||
Lv burg and card access system installation Date: March 16, 2015Permit type: Intake | Permit status: Closed | Completion date: March 16, 2015 | Permit id: 2015-134002-000 | |||||
Install (1) illuminated flush mounted wall sign - 31. 85 sq. Ft. - sign 1 - north elevation Date: April 6, 2015Permit type: Intake | Permit status: Closed | Completion date: April 6, 2015 | Permit id: 2015-145423-000 | |||||
Install (1) illuminated flush mounted wall sign - 31. 85 sq. Ft. - sign 2- west elevation Date: April 6, 2015Permit type: Intake | Permit status: Closed | Completion date: April 6, 2015 | Permit id: 2015-145426-000 | |||||
(2) illuminated wall signs Date: April 6, 2015Permit type: Intake | Permit status: Closed | Completion date: April 6, 2015 | Permit id: 2015-145427-000 | |||||
Thermostats & wire Date: May 22, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2015-174914-000 | |||||
Install floor drain in trash enclosure Date: October 30, 2014Permit type: Plumbing inspections | Permit status: Approved | Completion date: November 3, 2014 | Permit id: 2014-232386-000 | |||||
Approval of a building addition, outdoor patio and dock in the river sub district of the central city plan district and in the nw 13th avenue historic district, per the approved site plans, exhibits c-1 through c-22, signed and dated 12/21/15, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 26. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-210751 hr dz. No field changes allowed. Date: December 22, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 6, 2015 | Permit id: 2015-210751-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 2, 2015 | Permit id: 2015-229807-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 4, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Completed | Completion date: April 7, 2016 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Received | Completion date: September 1, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Accepted for review | Completion date: September 3, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Completed | Completion date: February 9, 2016 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Billed | Completion date: September 4, 2015 | Permit id: 2015-229807-000 | |||||
Plan review pw Permit status: Approved | Completion date: February 9, 2016 | Permit id: 2015-229807-000 | |||||
Bond/insurance pw Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2015-229807-000 | |||||
Pre-issuance pw Permit status: Not reqd | Completion date: February 10, 2016 | Permit id: 2015-229807-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Application | Permit status: Approved | Completion date: December 23, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Issuance/intake | Permit status: Intake | Completion date: December 23, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: December 28, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: February 8, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: April 18, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 30, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Addressing | Permit status: Not reqd | Completion date: December 28, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Planning and zoning | Permit status: Approved | Completion date: January 15, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Erosion control | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Approved | Completion date: February 18, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Required | Completion date: January 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Required | Completion date: February 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Not reqd | Completion date: January 12, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Structural | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Structural | Permit status: Required | Completion date: February 9, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: January 25, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Special inspections review | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Special inspections review | Permit status: Approved | Completion date: February 16, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Environmental services | Permit status: Approved | Completion date: January 22, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Environmental services | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Transportation | Permit status: Approved | Completion date: January 20, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Transportation | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Water bureau review | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Water bureau review | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Parks bureau | Permit status: Approved | Completion date: February 2, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Parks bureau | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-281039-000 | |||||
Approval of a building addition, outdoor patio and dock in the river sub district of the central city plan district and in the nw 13th avenue historic district, per the approved site plans, exhibits c-1 through c-22, signed and dated 12 21 15, subject to the following conditions:a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 26. The sheets on which this information appears must be labeled, proposal and design as approved in case file # lu 15-210751 hr dz. No field changes allowed. Date: December 22, 2015Permit type: Land use review | Permit status: Completed | Completion date: August 6, 2015 | Permit id: 2015-210751-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 2, 2015 | Permit id: 2015-229807-000 | |||||
Intake pw Permit status: Assigned | Completion date: September 4, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Completed | Completion date: April 7, 2016 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Received | Completion date: September 1, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Accepted for review | Completion date: September 3, 2015 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Completed | Completion date: February 9, 2016 | Permit id: 2015-229807-000 | |||||
Pre-design pw Permit status: Billed | Completion date: September 4, 2015 | Permit id: 2015-229807-000 | |||||
Plan review pw Permit status: Approved | Completion date: February 9, 2016 | Permit id: 2015-229807-000 | |||||
Bond/insurance pw Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2015-229807-000 | |||||
Pre-issuance pw Permit status: Not reqd | Completion date: February 10, 2016 | Permit id: 2015-229807-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Application | Permit status: Approved | Completion date: December 23, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Issuance/intake | Permit status: Intake | Completion date: December 23, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: December 28, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: February 8, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: April 18, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 30, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Process management | Permit status: Closed | Completion date: March 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Addressing | Permit status: Not reqd | Completion date: December 28, 2015 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Planning and zoning | Permit status: Approved | Completion date: January 15, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Erosion control | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Approved | Completion date: February 18, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Required | Completion date: January 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Required | Completion date: February 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Site development | Permit status: Approved | Completion date: January 28, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Approved | Completion date: April 22, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Approved | Completion date: April 5, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Life safety | Permit status: Not reqd | Completion date: January 12, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Structural | Permit status: Approved | Completion date: April 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Structural | Permit status: Required | Completion date: February 9, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Commercial plumbing | Permit status: Not reqd | Completion date: January 25, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Special inspections review | Permit status: Approved | Completion date: February 19, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Special inspections review | Permit status: Approved | Completion date: February 16, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Fire bureau | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Environmental services | Permit status: Approved | Completion date: January 22, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Environmental services | Permit status: Approved | Completion date: April 21, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Transportation | Permit status: Approved | Completion date: January 20, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Transportation | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Water bureau review | Permit status: Approved | Completion date: January 25, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Water bureau review | Permit status: Approved | Completion date: February 4, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Parks bureau | Permit status: Approved | Completion date: February 2, 2016 | Permit id: 2015-281039-000 | |||||
Addition 10 sq ft 1st floor east side of building to include (2) restrooms, conference rooms and stairs to 2nd floor addition. 25 sq ft 2nd floor addition to include office space and reconfiguration of existing area for additional office space; new deck on 1st and 2nd floor off of addition, relocation of existing stairs; remodel of basement space to include new bathroom, office area and bike storage; 2 rain gardens for stormwater Permit type: Parks bureau | Permit status: Approved | Completion date: April 11, 2016 | Permit id: 2015-281039-000 | |||||
Interior ti existing tenant to create conference room and lunch room Date: August 16, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: October 2, 2002 | Current use: Business | Permit id: 2002-135626-000 | |||||
Remove suspended ceiling grid in portion of building. No occupancy this permit. Date: April 2, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 25, 2007 | Current use: Business | Permit id: 2007-119555-000 | |||||
Renovate 18,0 sf 2-story building for future tenants -- remove non-structural exterior brick panels, windows, entry door and replace with storefront system; new paint and metal panels at facade; remove interior partitions -- no change of occupancy this permit Date: August 16, 2012Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 26, 2014 | Current use: Business | Permit id: 2011-186947-000 | |||||
Seismic upgrade; new roof with rigid r- insulation-- no change of occupancy this permit Date: August 16, 2012Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 1, 2014 | Current use: Business | Permit id: 2012-128942-000 | |||||
Cut openings and install new windows on north wall of 2nd floor; demo 2 bathrooms on 2nd floor - shell only, no occupancy this permit phone (360)693-7935 Date: November 28, 2012Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 28, 2014 | Current use: Business | Permit id: 2012-200461-000 | |||||
Change of occupancy to increase amount of office area on the second floor. One interior staircase to be removed. One exterior staircase and deck to be added on east side of building. New openings on the east elevation. Interior wall and finishes added troughout second floor Date: October 2, 2013Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 9, 2014 | Current use: Business | Permit id: 2013-199470-000 |