ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Comment date: fri jun 04 00:00: edt 2004 - stand alone driveway. Lcs; comment date: mon jun 14 00:00: edt 2004 - 1. Shared driveway, must have written approval of each lot owner. 2. Entrance apron for d Client: Driveway | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02586 | Parcel: 20718 | |||||
Stand alone driveway. Lcs; 1. Shared driveway, must have written approval of each lot owner. 2. Entrance apron for driveway access shall be constructed of concrete or asphalt. 3. Driveway access apron must be constructed in accordance with detail 3. 15 from the city of asheville standard specifications manual. (sent to applicant) 4. Inspector must be called 48 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is danny guthrie and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 25 wide at the edge of the roadway. This measurement includes the radius. 7. Radius must be no greater than 42 (3. 5 feet). 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02586 | Parcel: 20718 | |||||
Stand alone driveway. Lcs; comment date: mon jun 14 00:00: edt 2004 - 1. Shared driveway, must have written approval of each lot owner. 2. Entrance apron for d Date: March 31, 2005Client: Driveway | Permit type: Planning - historical | Permit status: Closed | Current use: Historical | Permit id: 04-02586 | Parcel: 20718 | |||||
Stand alone driveway. Lcs; 1. Shared driveway, must have written approval of each lot owner. 2. Entrance apron for driveway access shall be constructed of concrete or asphalt. 3. Driveway access apron must be constructed in accordance with detail 3. 15 from the city of asheville standard specifications manual. (sent to applicant) 4. Inspector must be called 48 hours prior to pouring of the driveway access apron for an inspection of the forms. 5. Inspector for this project is danny guthrie and he can be reached at redacted phone number (office) or redacted phone number (cell). 6. Total width cannot exceed 25 wide at the edge of the roadway. This measurement includes the radius. 7. Radius must be no greater than 42 (3. 5 feet). 8. There will be one entrance constructed. 9. Culvert may be required for positive drainage across the property. Date: March 31, 2005Permit type: Planning - historical | Permit status: Closed | Permit id: 04-02586 | Parcel: 20718 |