ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F3/pr# cwb-4-precash/dfs-fireproofing & insulation, 4th fl. Date: January 31, 2008Permit type: Intake | Permit status: Closed | Completion date: January 25, 2008 | Permit id: 2008-101131-Dfs | |||||
8th floor quantum - ductless split system replacement - powerevaporator mounted on ceiling of it room. Date: November 12, 2014Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-236616-000 | |||||
F1/ fire escape testing on four fire escapes Date: December 3, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 3, 2014 | Permit id: 2014-244991-000 | |||||
F1/ fire escape testing on four fire escapes for certification Permit type: Intake | Permit status: Closed | Completion date: December 3, 2014 | Permit id: 2014-245003-000 | |||||
B1/ 13th floor common area add 3 ton gas split system, ductwork and gas piping Date: February 12, 2015Permit type: Intake | Permit status: Closed | Completion date: January 30, 2015 | Permit id: 2015-112585-000 | |||||
13th fl common area ti - hvac conrtols Date: February 2, 2015Permit type: Intake | Permit status: Closed | Completion date: February 2, 2015 | Permit id: 2015-113639-000 | |||||
Basement door magnetic door holder and two smoke detectors Date: March 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 11, 2015 | Permit id: 2015-132077-000 | |||||
Adding 2 smokes at fire door for a magnetic release. Date: March 12, 2015Permit type: Intake | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2015-132891-000 | |||||
F18/ ground floor pazzoria interior demo to return 926 sq ft to lease space for future tenant Date: May 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2015-177586-000 | |||||
Plumbing renovation at commonwealth building 1st floordemo 2 sinks Date: June 11, 2015Permit type: Intake | Permit status: Closed | Completion date: June 11, 2015 | Permit id: 2015-184437-000 | |||||
Suite 1125--renewable nw- cat 5e cabling for office Date: July 21, 2011Permit type: Electrical inspections | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2011-160221-000 | |||||
Approval of exterior alterations to the exterior of the equitable building, also known as the commonwealth building in the downtown subdistrict of the central city plan district to include: removal of the middle storefront system and glass sliding door on the north faade of the 13th floor and replacement with a new storefront system consisting of two fixed windows of equal width and a new center swinging door and sidelight of narrower width; relocation of a roof access stair and hvac unit from the 13th floor roof to the 14th floor roof; installation of ip wood decking across the majority of the 13th floor roof with inset floor lights; installation of a glass guard rail approximately 4 inward from the existing guardrail to remain; and installation of a cast concrete and steel gas fireplace; and installation of 8 new sconce lights mounted at the inside of the roof deck columns. This approval is per the approved site plans, exhibits c-1 through c-15, signed and dated september 3, 2014, s Date: September 8, 2014Permit type: Land use review | Permit status: Completed | Completion date: March 11, 2014 | Permit id: 2014-124500-000 | |||||
Replace fire pump and controler with like---3 sets of plans Date: April 23, 2014Permit type: Intake | Permit status: Closed | Completion date: April 23, 2014 | Permit id: 2014-146951-000 | |||||
F15/ 2nd floor shopkeep 7,362 sq ft new tenant remodel; new walls,doors relites for open office, conference room, entrance area & breakroom Date: July 15, 2014Permit type: Reviews | Permit status: Approved | Completion date: July 15, 2014 | Permit id: 2014-184223-000 | |||||
B1/ 2nd floor shopkeep 7,362 sq ft new tenant remodel - modify ductwork for existing fan coil system Date: July 22, 2014Permit type: Intake | Permit status: Closed | Completion date: July 17, 2014 | Permit id: 2014-185833-000 | |||||
2nd fl shopkeep ti - power Date: July 28, 2014Permit type: Intake | Permit status: Closed | Completion date: July 21, 2014 | Permit id: 2014-187168-000 | |||||
2nd fl shopkeep ti - hvac controls Date: July 21, 2014Permit type: Intake | Permit status: Closed | Completion date: July 21, 2014 | Permit id: 2014-187183-000 | |||||
Plumbing renovation at commonwealth building for shop keepbreakroom sink and dw Date: August 21, 2014Permit type: Intake | Permit status: Closed | Completion date: July 31, 2014 | Permit id: 2014-191732-000 | |||||
F17/ 3rd floor galois new tenant remodel, new walls, doors, relites and ceiling lighting Date: August 5, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 5, 2014 | Permit id: 2014-194084-000 | |||||
3rd fl galois ti - power Date: August 7, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-195132-000 | |||||
2nd fl shopkeep ti - voice/data Date: August 7, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-195313-000 | |||||
Plumbing renovation at commonwealth building for galios tidemo sink, install wh and w/m box Date: August 29, 2014Permit type: Intake | Permit status: Closed | Completion date: August 14, 2014 | Permit id: 2014-198476-000 | |||||
3rd fl galois ti - fire alarm system alteration Date: August 21, 2014Permit type: Intake | Permit status: Closed | Completion date: August 21, 2014 | Permit id: 2014-201762-000 | |||||
2nd fl shopkeep ti - fire alarm system alteration Date: August 21, 2014Permit type: Intake | Permit status: Closed | Completion date: August 21, 2014 | Permit id: 2014-201776-000 | |||||
Add 6 heads relocate 2 heads--3 sets of plans Date: August 22, 2014Permit type: Intake | Permit status: Closed | Completion date: August 22, 2014 | Permit id: 2014-202274-000 | |||||
Add, move, and plug sprinklers as required to meet code and the new office layout--- 3 sets of plans Date: August 22, 2014Permit type: Intake | Permit status: Closed | Completion date: August 22, 2014 | Permit id: 2014-202294-000 | |||||
F7/ 13th floor; ti, new walls, doors, relites, casework, breakroom, elec, plbg, finishes Date: August 27, 2014Permit type: Reviews | Permit status: Approved | Completion date: August 27, 2014 | Permit id: 2014-205013-000 | |||||
F7/ 13th floor common area; ti, new walls, doors, relites, casework, breakroom, elec, plbg, finishes Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 27, 2014 | Permit id: 2014-205014-000 | |||||
Add fire pump tamper monitor points to fire system--3 sets of plans Date: August 29, 2014Permit type: Intake | Permit status: Closed | Completion date: August 29, 2014 | Permit id: 2014-206018-000 | |||||
Install 8 strobes and 3 horns--3 sets of plans Date: August 29, 2014Permit type: Intake | Permit status: Closed | Completion date: August 29, 2014 | Permit id: 2014-206036-000 | |||||
13th fl common area ti - power Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: September 3, 2014 | Permit id: 2014-207497-000 | |||||
Plumbing renovation at commonwealth building 13th floorbreakroom sink and dw Date: January 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 8, 2014 | Permit id: 2014-209462-000 | |||||
Add 3 strobes and 3 horns---3 sets of plans Date: September 9, 2014Permit type: Intake | Permit status: Closed | Completion date: September 9, 2014 | Permit id: 2014-209925-000 | |||||
F4/ 13th floor/ exterior patio improvements - new decking, curbs, railings, fireplace, doors, finishes, lighting and electrical. See separate permit for interior only 13th floor improvements Date: September 11, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 11, 2014 | Permit id: 2014-211133-000 | |||||
F4/ 13th floor/ exterior patio improvements - new decking, curbs, railings, fireplace, doors, finishes, lighting and electrical. See separate permit for interior only 13th floor improvements Date: March 24, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2014 | Permit id: 2014-211141-000 | |||||
B2/ dfs for glass guardrail system Date: March 24, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2014 | Permit id: 2014-211141-Dfs | |||||
3rd fl galois ti - hvac controls - 2 ddc t-stats Date: September 12, 2014Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-211896-000 | |||||
B1/ 3rd floor galois relocate 2 fcu with ductwork Date: October 7, 2014Permit type: Intake | Permit status: Closed | Completion date: September 12, 2014 | Permit id: 2014-212143-000 | |||||
B1/ cwb 11 quantum tenant replace split system with like for like new. The condensing unit is located on the 14th floor and the indoor unit is on the 11th floor i. T. Room Date: September 16, 2014Permit type: Reviews | Permit status: Approved | Completion date: September 16, 2014 | Permit id: 2014-213199-000 | |||||
11th fl quantum - replace i. T. Rm split system - power(note: the condensing unit is located on the 14th fl) Date: October 13, 2014Permit type: Intake | Permit status: Closed | Completion date: September 19, 2014 | Permit id: 2014-215012-000 | |||||
3rd fl galois ti - voice/data Date: October 8, 2014Permit type: Intake | Permit status: Closed | Completion date: October 3, 2014 | Permit id: 2014-221269-000 | |||||
B1/ no plans/ push/pul ductless split system Date: October 13, 2014Permit type: Reviews | Permit status: Approved | Completion date: October 13, 2014 | Permit id: 2014-224767-000 | |||||
B1/ 8th flr, no plans/ push/pul ductless split system Date: October 14, 2014Permit type: Intake | Permit status: Closed | Completion date: October 13, 2014 | Permit id: 2014-224771-000 | |||||
8th floor quantum - ductless split system replacement - hvaclow voltage only Date: October 13, 2014Permit type: Intake | Permit status: Closed | Completion date: October 13, 2014 | Permit id: 2014-224777-000 | |||||
13th fl terrace - power Permit type: Intake | Permit status: Closed | Completion date: October 13, 2014 | Permit id: 2014-224880-000 | |||||
#13 coates kokes cabling for expansion Date: July 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 29, 2015 | Permit id: 2015-209298-000 | |||||
#13 coates kokes cabling for expansion - voice/data Date: July 29, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209303-000 | |||||
F18/ 10th floor, ti; remove selected walls, doors, add back/reconfigure for additional offices, doors, relites, conference rooms, folding wall, breakroom, reception area, ceiling, elec, plbg, finishes Date: September 10, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-234393-000 | |||||
B2/ 8th floor; relocate ductless split unit from 11th floor to 8th floor, piping Date: September 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-235093-000 | |||||
F15/ suite 1401 - remove and replace partition walls, fixtures, finishes, electrical, plumbing, ceiling in vacant space. No occupancy this permit Date: September 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 16, 2015 | Permit id: 2015-237341-000 | |||||
B1/dfs for fireproofing Date: March 14, 2016Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-237342-Dfs | |||||
Cole hour 7th floor breakroom remodel Date: September 17, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 17, 2015 | Permit id: 2015-237848-000 | |||||
Break sink, dw, hub drain, wh Date: September 17, 2015Permit type: Intake | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2015-237852-000 | |||||
10th fl kennedy / jenks consultants - power Date: October 6, 2015Permit type: Intake | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2015-238380-000 | |||||
Add icemaker connection for refridgerator. Permit type: Intake | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238536-000 | |||||
13th fl common area ti - a/v work Date: September 18, 2015Permit type: Intake | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238935-000 | |||||
Plumbing renovation at commonwealth building for colehour cohen ti Date: September 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 22, 2015 | Permit id: 2015-240021-000 | |||||
#1401 vacancy - power Date: October 21, 2015Permit type: Intake | Permit status: Closed | Completion date: October 1, 2015 | Permit id: 2015-245199-000 | |||||
Commonwealth building, suite 1401 t. I. To include: 1- wc, 1-lav, 1- break sink Date: October 21, 2015Permit type: Intake | Permit status: Closed | Completion date: October 6, 2015 | Permit id: 2015-246580-000 | |||||
Add 2 horn/strobes and 1 strobe for renovated conference room, lounge, and roof deck 13th floor. Date: October 13, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-250078-000 | |||||
B2/ 10th flr; install 3-t ductless split, modify s/a duct Date: October 21, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-250429-000 | |||||
Add / relocate fire sprinklers for 10th floor ti. Date: October 19, 2015Permit type: Intake | Permit status: Closed | Completion date: October 19, 2015 | Permit id: 2015-252779-000 | |||||
F10/ 11th & 12th floor; ti, remove walls, doors, reconfigure for multiple offices, conference rooms, break room, doors, relite, sliding office doors, both floors, ceiling, elec, plbg, finishes Date: October 26, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 26, 2015 | Permit id: 2015-256407-000 | |||||
B2/ new rr fan, duct modifications Date: November 6, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-256685-000 | |||||
Relocate sprinkler pipe for new ti layout in suite 1401 Date: October 29, 2015Permit type: Intake | Permit status: Closed | Completion date: October 29, 2015 | Permit id: 2015-258289-000 | |||||
Common wealth building, 11th and 12th floor t. I. To include: 2- break sinks, 2- dws, 2- ice maker connections, 2- coffee maker connections. Date: February 4, 2016Permit type: Intake | Permit status: Closed | Completion date: November 2, 2015 | Permit id: 2015-259401-000 | |||||
10th fl kennedy / jenks consultants - voice/data Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263950-000 | |||||
11-12 fls quantum spatial ti - power Date: January 21, 2016Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-264371-000 | |||||
11-12 fls quantum spatial ti - fire alarm wiring Date: January 21, 2016Permit type: Intake | Permit status: Closed | Completion date: January 21, 2016 | Permit id: 2016-109036-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: January 22, 2016 | Permit id: 2016-109358-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: February 11, 2016 | Permit id: 2016-109358-000 | |||||
Fire alarm modification for 12th floor ti. Date: February 5, 2016Permit type: Intake | Permit status: Closed | Completion date: January 29, 2016 | Permit id: 2016-113727-000 | |||||
B2/ exhaust fans, duct modifications Date: February 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116511-000 | |||||
B2/ additional ductwork modifications Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-116511-Rev | |||||
B1/dlr group t. I. -demo flooring kitchenette casework, partition walls, new kitchenette casework, replace existing plbg fixtures, install wall mounted bike racks, plbg, elec Date: February 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2016-125243-000 | |||||
11-12 fls quantum spatial ti - access control Date: February 24, 2016Permit type: Intake | Permit status: Closed | Completion date: February 24, 2016 | Permit id: 2016-125853-000 | |||||
Plumbing renovation at commonwealth building for dlr groud office ti1-sink, 1-dw, 1-wh, 1-hub Date: April 11, 2016Permit type: Intake | Permit status: Closed | Completion date: March 7, 2016 | Permit id: 2016-131324-000 | |||||
#1212 dlr group - power/voice/data Date: March 17, 2016Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136417-000 | |||||
11-12 fls quantum spatial ti - voice/data Date: March 31, 2016Permit type: Intake | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-143154-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-147901-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Letter sent | Completion date: April 19, 2016 | Permit id: 2016-147901-000 | |||||
12th floor- alterations to the fire sprinklers as needed for t. I.- 47 heads total Date: April 20, 2016Permit type: Intake | Permit status: Closed | Completion date: April 20, 2016 | Permit id: 2016-156301-000 | |||||
Low volt for cctv for 2nd floor tenant. Faxed Date: February 18, 2014Permit type: Intake | Permit status: Closed | Completion date: February 18, 2014 | Permit id: 2014-117692-000 | |||||
13th fl terrace - power Date: September 18, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2014 | Permit id: 2014-224880-000 | |||||
Add data cables for new tvs and wapsfaxed Date: November 25, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 20, 2015 | Permit id: 2014-242736-000 | |||||
F1/ fire escape testing on four fire escapes for certification Date: February 11, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2014 | Permit id: 2014-245003-000 | |||||
13th floor- common areas- alterations to the fire sprinklers as needed for t. I.- heads total Date: July 20, 2015Permit type: Intake | Permit status: Closed | Completion date: July 20, 2015 | Permit id: 2015-203760-000 | |||||
#13 coates kokes cabling for expansion - voice data Date: July 29, 2015Permit type: Intake | Permit status: Closed | Completion date: July 29, 2015 | Permit id: 2015-209303-000 | |||||
F18 10th floor, ti; remove selected walls, doors, add back reconfigure for additional offices, doors, relites, conference rooms, folding wall, breakroom, reception area, ceiling, elec, plbg, finishes Date: September 10, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 10, 2015 | Permit id: 2015-234393-000 | |||||
B2 8th floor; relocate ductless split unit from 11th floor to 8th floor, piping Date: September 11, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-235093-000 | |||||
F15 suite 1401 - remove and replace partition walls, fixtures, finishes, electrical, plumbing, ceiling in vacant space. No occupancy this permit Date: September 16, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 16, 2015 | Permit id: 2015-237341-000 | |||||
B1 dfs for fireproofing Date: March 14, 2016Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-237342-Dfs | |||||
10th fl kennedy jenks consultants - power Date: October 6, 2015Permit type: Intake | Permit status: Closed | Completion date: September 17, 2015 | Permit id: 2015-238380-000 | |||||
Add icemaker connection for refridgerator. Permit type: Intake | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238536-000 | |||||
13th fl common area ti - a v work Date: September 18, 2015Permit type: Intake | Permit status: Closed | Completion date: September 18, 2015 | Permit id: 2015-238935-000 | |||||
Add 2 horn strobes and 1 strobe for renovated conference room, lounge, and roof deck 13th floor. Date: October 13, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-250078-000 | |||||
B2 10th flr; install 3-t ductless split, modify s a duct Date: October 21, 2015Permit type: Intake | Permit status: Closed | Completion date: October 13, 2015 | Permit id: 2015-250429-000 | |||||
Add relocate fire sprinklers for 10th floor ti. Date: October 19, 2015Permit type: Intake | Permit status: Closed | Completion date: October 19, 2015 | Permit id: 2015-252779-000 | |||||
F10 11th & 12th floor; ti, remove walls, doors, reconfigure for multiple offices, conference rooms, break room, doors, relite, sliding office doors, both floors, ceiling, elec, plbg, finishes Date: October 26, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 26, 2015 | Permit id: 2015-256407-000 | |||||
B2 new rr fan, duct modifications Date: November 6, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-256685-000 | |||||
10th fl kennedy jenks consultants - voice data Date: November 12, 2015Permit type: Intake | Permit status: Closed | Completion date: November 12, 2015 | Permit id: 2015-263950-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: January 22, 2016 | Permit id: 2016-109358-000 | |||||
Zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: February 11, 2016 | Permit id: 2016-109358-000 | |||||
B2 exhaust fans, duct modifications Date: February 10, 2016Permit type: Intake | Permit status: Closed | Completion date: February 4, 2016 | Permit id: 2016-116511-000 | |||||
B2 additional ductwork modifications Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: February 22, 2016 | Permit id: 2016-116511-Rev | |||||
B1 dlr group t. I. -demo flooring kitchenette casework, partition walls, new kitchenette casework, replace existing plbg fixtures, install wall mounted bike racks, plbg, elec Date: February 23, 2016Permit type: Reviews | Permit status: Approved | Completion date: February 23, 2016 | Permit id: 2016-125243-000 | |||||
#1212 dlr group - power voice data Date: March 17, 2016Permit type: Intake | Permit status: Closed | Completion date: March 17, 2016 | Permit id: 2016-136417-000 | |||||
11-12 fls quantum spatial ti - voice data Date: March 31, 2016Permit type: Intake | Permit status: Closed | Completion date: March 31, 2016 | Permit id: 2016-143154-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Closed | Completion date: April 8, 2016 | Permit id: 2016-147901-000 | |||||
Zoning confirmation request Permit type: Land use review | Permit status: Letter sent | Completion date: April 19, 2016 | Permit id: 2016-147901-000 | |||||
F7 13th floor common area; ti, new walls, doors, relites, casework, breakroom, elec, plbg, finishes Date: September 4, 2014Permit type: Intake | Permit status: Closed | Completion date: August 27, 2014 | Permit id: 2014-205014-000 | |||||
F4 13th floor exterior patio improvements - new decking, curbs, railings, fireplace, doors, finishes, lighting and electrical. See separate permit for interior only 13th floor improvements Date: March 24, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2014 | Permit id: 2014-211141-000 | |||||
F1 fire escape testing on four fire escapes for certification Date: February 11, 2016Permit type: Intake | Permit status: Closed | Completion date: December 3, 2014 | Permit id: 2014-245003-000 | |||||
B1 13th floor common area add 3 ton gas split system, ductwork and gas piping Date: February 12, 2015Permit type: Intake | Permit status: Closed | Completion date: January 30, 2015 | Permit id: 2015-112585-000 | |||||
F18 ground floor pazzoria interior demo to return 926 sq ft to lease space for future tenant Date: May 29, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 29, 2015 | Permit id: 2015-177586-000 | |||||
Ti-11th fl north half--reconfigure office space and sprinkle entire floor. Create 1 hour corridor from new space to elevator stair lobby (max 35 long) Date: December 19, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: December 19, 2002 | Current use: Business | Permit id: 2000-178526-000 | |||||
Alteration - interior alteration only partition walls Date: November 7, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: November 16, 2000 | Current use: Assembly | Permit id: 2000-184545-000 | |||||
Tenant improvement, remove and build new partitions walls, office space, new uni-sex bathroom, ada compliant, new carpet etc., specs included, mechancal drwings in main drwgs Date: March 2, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 6, 2001 | Current use: Business | Permit id: 2001-102826-000 | |||||
Demo work to be separated out from main permit -01-102826 co Date: February 16, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 5, 2001 | Current use: Business | Permit id: 2001-127031-000 | |||||
Install moveable filing system on 4th floor Date: February 4, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 5, 2002 | Current use: Business | Permit id: 2001-127833-000 | |||||
Re-configuring int. Walls and adding walls Date: March 7, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: June 12, 2001 | Current use: Business | Permit id: 2001-127840-000 | |||||
Ti - move wall and door Date: August 14, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 11, 2002 | Current use: Business | Permit id: 2001-153603-000 | |||||
Ti remove section of wall and install 20-min. Rated door with relight. Maintain sprinkler coverage per fire marshal. Date: October 24, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 28, 2004 | Current use: Business | Permit id: 2002-147068-000 | |||||
Temporary scaffolding canopy for pedestrian protection - see comments Date: January 24, 2003Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: January 28, 2004 | Current use: Business | Permit id: 2003-102806-000 | |||||
Ti interior for new tenant to create new offices and reception area Date: December 19, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 4, 2003 | Current use: Business | Permit id: 2002-156394-000 | |||||
Two twin ornatmental light pole foundations and one joint use pole foundation penetrating the existing basement vault and two joint use pole foundations adjacent to the existing basement vault requiring notching vault wall Date: August 31, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 1, 2009 | Current use: Business | Permit id: 2007-146028-000 |