ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt # 4 bedroom # 1: reinstall 2 w/gs and stop. Bedroom # 2: reinstall 1 w/g and stop. Kitchen: reinstall 1 w/g and stop. Bathroom: reinstall 1 Date: January 19, 2001Permit type: Gc | Permit id: E114430 | |||||
Top flr kit, bdrm1, bdrm2: remove and reinstall w/g. Livrm:remove and re-install 2 w/gs. Date: November 30, 2000Permit type: Gc | Permit id: E110641 | |||||
Apt # 4 bedroom # 1: reinstall 2 w gs and stop. Bedroom # 2: reinstall 1 w g and stop. Kitchen: reinstall 1 w g and stop. Bathroom: reinstall 1 Date: January 19, 2001Permit type: Gc | Permit id: E114430 | |||||
Top flr kit, bdrm1, bdrm2: remove and reinstall w g. Livrm:remove and re-install 2 w gs. Date: November 30, 2000Permit type: Gc | Permit id: E110641 | |||||
Bsmt apt: properly repair approx. 32 sq ft of bproken sheet rock ceiling at the private hall, prime and paint uniformly with two coats. Remove al Date: November 4, 2011Permit type: Gc | Permit id: Ec11861 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: October 31, 2011Permit type: Util | Permit id: Ec11768 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 12, 2011Permit type: Delead | Permit id: Ec14982 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: March 6, 2012Permit type: Util | Permit id: Ec24010 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 22, 2012Permit type: Delead | Permit id: Ec21247 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee00890 | |||||
Nationalgrid provide gas to boiler/hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02313 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02313 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee00890 | |||||
Nationalgrid provide gas to boiler hot water heater Date: July 1, 2012Permit type: Util | Permit id: Ed01157 | |||||
Nationalgrid provide gas to boiler hot water heater Date: October 31, 2011Permit type: Util | Permit id: Ec11768 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: September 21, 2009Permit type: Delead | Permit id: Ea09475 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 23, 2009Permit type: Delead | Permit id: Ea13856 |