ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Date: March 14, 2005Permit status: Finaled | Completion date: May 16, 2005 | Current use: Single family dwelling | Permit id: 376498 | |||||
Addition too large for fast track Date: November 22, 2004 Value: $80,000Permit type: Building residential | Permit status: Finaled | Completion date: May 16, 2005 | Current use: Single family dwelling | Permit id: 362726 | |||||
Pre-construction meeting required contact mc. Dps inspector danny edwards @ 301-674-70 bore roadway, excavate one foot square test pit in road, heavy-up overhead transformer and overhead wire, install cable and associated equipment. Prior to release of this permit, complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Disturbed areas shall be fine graded & sodded. Roadways shall be kept free of mud & debris. Materials & equipment shall not be stored in right-of-way. Notify mc. Dps inspector when work is complete utility representative: paul loisel @ 301-548-4322 pepco #53069585 Date: April 4, 2005Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 235557 | |||||
Dw permit: "restore existing driveway during construction" construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard: mc 301. 01 Date: November 4, 2004Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 232357 |