ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Installation of feet high battery powered low voltage (12v dc) electric security fence to be placed approximately 12 inches inside/behind existing chain link fence as per palns and as per code. Date: November 5, 2014 Value: $14,000Permit id: Com2014-20309 | |||||
Date: December 6, 2006 Value: $35,000Permit id: Dem2006-00864 | |||||
Use premises for auto recycling/dismantling scrapping and junk/scrap yard per bmza 537-06 conditions: the project adheres to the requirements of the site plan review committee and the project adheres to the requirements of the critical area master planb Date: October 2, 2006Permit id: Use2006-02200 | |||||
Install 11 ft of 6 high fence; (2) 6 high double swing gates (24 ft wide). Install (1) 6 ft high cantilever gate 24 feet wide. As per code. Date: August 17, 2006 Value: $19,500Permit id: Com2006-25372 | |||||
Remedial construction and excavation of contaminated soils and land cover capping as per plans and per code. Separate permit required for sprinkler system. Date: March 24, 2006 Value: $90,000Permit id: Com2006-09378 | |||||
Use premises for auto recycling/dismantling scrapping and junk/scrap yard per bmza 537-06 conditions: the project adheres to the requirements of the site plan review committee and the project adheres to the requirements of the critical area master planborder to critical area must be fenced off and no activity including storage of vehicles can take place within the critical area. Date: October 2, 2006Permit id: Use2006-02200 | |||||
Installation of feet high battery powered low voltage (12v dc) electric security fence to be placed approximately 12 inches inside behind existing chain link fence as per palns and as per code. Date: November 5, 2014 Value: $14,000Expiration date: May 5, 2015 | Permit id: Com2014-20309 | |||||
Use premises for auto recycling dismantling scrapping and junk scrap yard per bmza 537-06 conditions: the project adheres to the requirements of the site plan review committee and the project adheres to the requirements of the critical area master planborder to critical area must be fenced off and no activity including storage of vehicles can take place within the critical area. Date: October 2, 2006Permit id: Use2006-02200 |