ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 gp. W. O. Remove all work related debris. Date: November 19, 2010Permit type: Heat | Permit id: Eb15416 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: June 4, 2010Permit type: Delead | Permit id: Ea37976 | |||||
Perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 26, 2011Permit type: Delead | Permit id: Eb29321 | |||||
Apt. 2 install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 and restore gas boiler to pwo. Remove all work related debri Permit type: Heat | Permit id: Eb14867 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: April 4, 2011Permit type: Delead | Permit id: Eb26527 | |||||
Apt. 2 install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 and restore gas boiler to pwo. Remove all work related debri Permit type: Heat | Permit id: Eb14867 | |||||
Apt. 2 install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 and restore gas boiler to pwo. Remove all work related debri Permit type: Heat | Permit id: Eb14867 | |||||
Apt. 2 install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 and restore gas boiler to pwo. Remove all work related debri Permit type: Heat | Permit id: Eb14867 | |||||
Apt. 2 install a clock thermostat in apt. 2 to operate parallel with thermostat in apt. 1 and restore gas boiler to pwo. Remove all work related debri Permit type: Heat | Permit id: Eb14867 |