ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Panel change in unit "c" Date: April 4, 2005 Contractor: Bowie Electric Svc And Supply IncPermit type: Electrical | Permit status: Permit finaled | Completion date: April 14, 2005 | Expiration date: April 4, 2006 | Current use: Multifamily | Permit id: 6055040 | |||||
Project overview: non structural interior alteration403 30th ave seattle, wa 98122 is a rental property with 4 rental units. 3 units (a,b,c) occupy the bottom floor while the top floor occupied by one large penthouse style single unit (d). Previously there were two units on the top floor, than it was converted in to a one single large unit. This project is to again divide the top floor unit d into 2 separate units (d and e), a two bedroom unit (d) and a one bedroom unit (e). The project requires the following work-removal of an existing non-structural wall and closet in a unit e (15 feet, not load bearing)-installation of new non-structural walls to separate the space in to two independent apartments (15 feet, not load bearing)-installation of 1 new closet in each apartment-installation of new entry doors in to the newly divided apartments. No exits or exit path will be modified-replacement of an existing window with a door on to the deck in unit d-installation of a decorative divider Applicant: Dreizin, Sergei | Permit type: Construction | Permit status: Initial information colle | Current use: Multifamily | Permit id: 6596434 |